JUL 2 81986
.
.
Docket Nos. 50-387
License Nos. NPF-14
50-388
Pennsylvania Power & Light Company
ATTN: Mr. H. W. Keiser
Vice President
Nuclear Operations
2 North Ninth Street
Allentown, Pennsylvania 18101
Gentlemen:
Subject: Combined Inspection Report Nos. 50-387/86-13 and 50-388/86-13
This refers to the routine safety inspection conducted by M. Dev of this office
on July 7-11, 1986, at Susquehanna Steam Electric Station, Units 1 and 2,
Berwick, Pennsylvania, of activities authorized by NRC License Nos. NPF-14 and
NPF-22 and to the discussions of our findings held by M. Dev and L. Plisco with
D. Thompson and other members of your staff at the conclusion of the inspec-
tion.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Our inspector also verified the steps you had taken to correct the violations
brought to your attention in a letter dated January 26, 1984. We have no
further questions regarding the steps you took to correct items 50-387/83-30-21,
and 50-388/83-25-21.
Within the scope of this inspection, no violations were observed.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
Stewart D. Ebneter, Director
Division of Reactor Safety
Enclosure: NRC Region I Inspection Report Numbers 50-387/86-13 and 50-388/86-13
%sogg% $
p
G
OFFICIAL RECORD COPY
CIR SUS 86-13 - 0001.0 0
07/24/86
'?< 0\\
.
!
Pennsylvania Power
2
and Light Company
cc w/ enc 1:
A. R. Sabol, Manager, Nuclear Quality Assurance
W. E. Barberich, Licensing Engineer
T. M. Crimmins, Superintendent of Plant-SSES
A. J. Pietrofitta, General Manager, Power Production Engineering and
Construction Atlantic Electric
R. J. Benich, Services Project Manager, General Electric Company
B. D. Kenyon, Senior Vice President-Nuclear
Bryan A. Snapp, Esquire, Assistant Corporate Counsel
William Matson, Allegheny Electric Cooperative
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ enc 1:
Region I Docket Room.(with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
Robert J. Bores, DRSS
M
DRSS:RI
DR
.RI
DRSS:RI
Dev/pj
Eapen
Bettenhausen
7/24/86
7/@/86
7/2 5/86
0FFICIAL RECORD COPY
CIR SUS 86-13 - 0002.0.0
07/24/86