Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20204H033 + (00:56:44, 8 December 2024)
- ML20204H032 + (00:56:46, 8 December 2024)
- W3P84-3164, Forwards Masonry Block Walls,Const Appraisal Team Item 6.2/6.3, Providing Addl Info Re Design Adequacy Review & as-built Conditions of Walls,Per 841030 Meeting + (00:56:47, 8 December 2024)
- ML20204H028 + (00:56:47, 8 December 2024)
- ML20204H025 + (00:56:48, 8 December 2024)
- ML20204H021 + (00:56:49, 8 December 2024)
- ML20204H020 + (00:56:50, 8 December 2024)
- ML20204H018 + (00:56:50, 8 December 2024)
- ML20204H016 + (00:56:51, 8 December 2024)
- ML20204H015 + (00:56:52, 8 December 2024)
- ML20204H013 + (00:56:53, 8 December 2024)
- ML20204H012 + (00:56:53, 8 December 2024)
- ML20204H010 + (00:56:54, 8 December 2024)
- ML20204H008 + (00:56:58, 8 December 2024)
- ML20204H007 + (00:56:59, 8 December 2024)
- ML20204H004 + (00:57:05, 8 December 2024)
- ML20204G996 + (00:57:10, 8 December 2024)
- ML20204G997 + (00:57:10, 8 December 2024)
- ML20204G991 + (00:57:11, 8 December 2024)
- IR 05000213/1958001 + (00:57:12, 8 December 2024)
- ML20204G987 + (00:57:13, 8 December 2024)
- ML20204G985 + (00:57:13, 8 December 2024)
- 2CAN118401, Advises That on 841027,two IAEA-installed Seals Removed from Missile Shield Structure Provided in Containment Over CRD Mechanism During Unscheduled Outage to Perform Maint,Per 841026 Telcon + (00:57:14, 8 December 2024)
- L-84-315, Forwards Info in Response to NRC Re Regulatory Effectiveness Review.Info Withheld (Ref 10CFR73.21) + (00:57:15, 8 December 2024)
- ML20204G976 + (00:57:16, 8 December 2024)
- ML20204G973 + (00:57:17, 8 December 2024)
- ML20204G970 + (00:57:18, 8 December 2024)
- ML20204G972 + (00:57:18, 8 December 2024)
- W3P84-3152, Forwards Suppl to Addl Info Re Basemat Hairline Cracks. Muenow & Assoc,Inc Performed Ultrasonic Testing of Interface Between Top of Basemat & Bottom Fill Concrete.Test Confirms Sonic Energy Not Penetrating Fill Concrete + (00:57:19, 8 December 2024)
- ML20204G964 + (00:57:20, 8 December 2024)
- ML20204G967 + (00:57:20, 8 December 2024)
- ML20204G961 + (00:57:22, 8 December 2024)
- ML20204G963 + (00:57:22, 8 December 2024)
- ML20204G955 + (00:57:25, 8 December 2024)
- PY-CEI-NRR-0609, Responds to NRC Re Violations Noted in Insp Rept 50-441/87-01.Corrective Actions:Piping Recribbed on Dunnage & Sloped to Allow for Drainage.End Caps Placed Only on High End of Piping Spools.Piping Spools Inspected Annually + (00:57:25, 8 December 2024)
- ML20204G953 + (00:57:26, 8 December 2024)
- ML20204G950 + (00:57:27, 8 December 2024)
- ML20204G947 + (00:57:28, 8 December 2024)
- ML20204G948 + (00:57:28, 8 December 2024)
- ML20204G944 + (00:57:29, 8 December 2024)
- ML20204G941 + (00:57:30, 8 December 2024)
- ML20204G942 + (00:57:30, 8 December 2024)
- RBG-19261, Interim Deficiency Rept DR-228 Re Defective Tdi Supplied Cylinder Head Valves in Standby Diesel Generator.Interim or Final Status Rept Will Be Provided by 841205 + (00:57:31, 8 December 2024)
- ML20204G935 + (00:57:32, 8 December 2024)
- ML20204G936 + (00:57:32, 8 December 2024)
- 05000395/LER-1984-042, :on 840928,while Investigating Event Associated W/ Radiation Monitor RM-A4,discovered Plant Design May Not Satisfy Intent of Tech Spec 3.3.2, ESF Actuation Sys Instrumentation. Monitor Returned to Svc + (00:57:34, 8 December 2024)
- ML20204G932 + (00:57:35, 8 December 2024)
- 05000331/LER-1984-037, :on 840929,reactor Scrammed on hi-hi Intermediate Range Monitor Signals from Channel E & F. Cause May Be Attributed to Spurious Electrical Noise.Review of Design & Installation Performed + (00:57:37, 8 December 2024)
- ML20204G928 + (00:57:38, 8 December 2024)
- ML20204G924 + (00:57:39, 8 December 2024)
- ML20204G919 + (00:57:40, 8 December 2024)
- ML20204G920 + (00:57:40, 8 December 2024)