Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17335A527 + (18:17:21, 7 January 2025)
- ML17335A520 + (18:17:23, 7 January 2025)
- ML17335A521 + (18:17:23, 7 January 2025)
- ML17335A519 + (18:17:24, 7 January 2025)
- 05000315/LER-1999-002, :on 990112,determined That RCS Pressurizer PORVs Had Not Been Tested,Per Ts.Caused by Inadequate Scheduling Controls Allowing Personnel Error.Surveillance Procedure Was Completed & Updated LER Will Be Submitted + (18:17:28, 7 January 2025)
- 05000315/LER-1999-001, :on 990106,noted That GE Hfa Relays Installed in EDGs May Not Meet Seismic Qualification.Caused by Operating Experience Info Incorrectly Dispositioned in 1985. Updated LER Will Be Submitted by 990405 + (18:17:31, 7 January 2025)
- IR 05000315/1998030 + (18:17:33, 7 January 2025)
- ML17335A508 + (18:17:35, 7 January 2025)
- IR 05000315/1998027 + (18:17:51, 7 January 2025)
- ML17335A505 + (18:17:53, 7 January 2025)
- ML17335A506 + (18:17:53, 7 January 2025)
- ML17335A503 + (18:17:55, 7 January 2025)
- ML17335A502 + (18:17:56, 7 January 2025)
- 05000315/LER-1998-060, :on 981231,identified That RT Sys Response Time Testing Did Not Comply with TS Definition.Caused by Inadequate Procedures.Corrective Actions Will Be Developed & Update to LER Will Be Submitted by 990415.With + (18:17:58, 7 January 2025)
- ML17335A500 + (18:17:58, 7 January 2025)
- IR 05000315/1998017 + (18:18:09, 7 January 2025)
- ML17335A497 + (18:18:10, 7 January 2025)
- 05000315/LER-1998-057, :on 981228,discovered That AFW Valves Were Not Tested IAW Inservice Testing Program.Caused by Failure to Recognize Design Bases Features Re Afws by Personnel. Updated LER Will Be Submittted by 990415.With + (18:18:12, 7 January 2025)
- 05000315/LER-1998-059, :on 981230,interim LER -single Failure in Containment Spray Sys Could Result in Containment Spray Ph Outside Design Occurred.Investigation Into Condition Continuing.Update Will Be Submitted by + (18:18:14, 7 January 2025)
- ML17335A494 + (18:18:15, 7 January 2025)
- ML17335A493 + (18:18:15, 7 January 2025)
- 05000315/LER-1998-052, :on 981128,no Analysis for NSR Sc Manual Loader for Tdafwp Could Be Found in Original Design.Cause Due to All Failure Modes Not Considered When Compressed Air Sys Originally Designed.Performed Review of Components + (18:18:20, 7 January 2025)
- 05000315/LER-1998-052-01, Forwards LER 98-052-01,re Potential Failure Mode for Air Operated Components Not Considered in Original Design. Interim LER Has Been Updated to Include Two Addl Instances of Same Failure Mode + (18:18:22, 7 January 2025)
- IR 05000315/1998023 + (18:18:31, 7 January 2025)
- ML17335A485 + (18:18:33, 7 January 2025)
- ML17335A486 + (18:18:33, 7 January 2025)
- ML17335A483 + (18:18:34, 7 January 2025)
- ML17335A484 + (18:18:34, 7 January 2025)
- PNO-III-98-025, on 980313,outage Extended Due to Util Decision to Melt 2.59 Million Pounds of Ice in Ice Condenser,Inspect Ice Condenser Components,Make Necessary Repairs & Fill Conndenser Baskets + (18:18:36, 7 January 2025)
- PNO-III-98-018, several Ice Condenser Problems Extended Outage.Two Units Shutdown Since Sept 1997 to Resolve Unrelated Issues Identified by NRC architect-engineering Insp + (18:18:38, 7 January 2025)
- PNO-III-99-003, on 990114,licensee Announced That Startup of Both Units Will Be Delayed While Expanded Engineering Reviews of Important Plant Sys Are Being Performed.New Restart Schedule Should Be Available in May + (18:18:40, 7 January 2025)
- ML17335A479 + (18:18:42, 7 January 2025)
- PNO-III-98-004, problems with Containment Hydrogen Skimming Lines & with Solid State Protection Sys Relays Delayed Startup from 980107 Until 980118.Licensee Discovered Cracks in Covers to 38 Master Relays + (18:18:44, 7 January 2025)
- PNO-III-97-086, on 971015,contract Worker Alarmed Radiation Monitor Upon Exiting Plant Radiologically Controlled Area. Identified Source of Contamination on Inside of Workers Shoe.Contamination Occurred Prior to Arrival on Site + (18:18:46, 7 January 2025)
- ML17335A476 + (18:18:48, 7 January 2025)
- IR 05000315/1998026 + (18:18:49, 7 January 2025)
- ML17335A473 + (18:18:51, 7 January 2025)
- 05000315/LER-1998-055, :on 981207,potential for Condition Outside of Design Bases for Rod Control Sys Was Noted.Caused by Calibration Error Coupled with Single Rod Failure.Condition Rept Investigation Is Ongoing + (18:18:52, 7 January 2025)
- 05000315/LER-1998-056, :on 981211,hot Leg Nozzle Gaps Resulted in Plant Being in Unanalyzed Condition.Analyses Are Being Performed by W to Resolve Problem.Updated LER Will Be Submitted by 990211.With + (18:18:55, 7 January 2025)
- ML17335A468 + (18:18:57, 7 January 2025)
- TAC:M99980 + (18:18:58, 7 January 2025)
- ML17335A467 + (18:18:59, 7 January 2025)
- 05000315/LER-1998-049, :on 981020,emergency Boron Injection Flow Path Was Inoperable.Caused by Original Design Deficiency. Engineering Evaluation of Event Is Continuing + (18:19:00, 7 January 2025)
- 05000315/LER-1998-054, :on 981202,discovered That at Least One MSSV Had Not Been Reset as Required by Ts.Engineering Is Continuing Review of Extent of Condition for Event.Updated LER Will Be Submitted by 990129.With + (18:19:03, 7 January 2025)
- ML17335A462 + (18:19:04, 7 January 2025)
- TAC:M94871 + (18:19:06, 7 January 2025)
- ML17335A461 + (18:19:06, 7 January 2025)
- ML17335A459 + (18:19:08, 7 January 2025)
- IR 05000315/1998021 + (18:19:34, 7 January 2025)
- ML17335A454 + (18:19:36, 7 January 2025)
- ML17335A452 + (18:19:37, 7 January 2025)
- ML17335A451 + (18:19:38, 7 January 2025)