Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17342B286 + (16:50:06, 7 January 2025)
- ML17342B285 + (16:50:07, 7 January 2025)
- L-88-154, Forwards Summary Rept of Integrated Schedule Generated for Month of Mar 1988.Schedules Discussed in Rept Reflect Info as of Issuance Date of 880315.First Integrated Schedule Regulatory Rept Will Be Issued in May 1988 + (16:50:08, 7 January 2025)
- ML17342B283 + (16:50:12, 7 January 2025)
- ML17342B281 + (16:50:13, 7 January 2025)
- L-88-178, Forwards Select Sys Assessment Progress Summary for Mar 1988 + (16:50:14, 7 January 2025)
- L-88-156, Responds to IE Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Subj Breakers Not Used in Any Class IE Sys at Plant + (16:50:17, 7 January 2025)
- ML17342B277 + (16:50:21, 7 January 2025)
- ML17342B275 + (16:50:23, 7 January 2025)
- ML17342B271 + (16:50:24, 7 January 2025)
- IR 05000250/1987051 + (16:50:26, 7 January 2025)
- L-88-163, Special Rept:Nonfunctional Fire Barrier Penetration Not Returned to Functional Status within 7 Days.Caused by Mods Being Performed & Equipment Malfunction.Plant Continues to Implement Compensatory Measures as Applicable + (16:50:28, 7 January 2025)
- 05000250/LER-1988-003, :on 880308,containment Ventilation & Control Room Ventilation Isolation Occurred.Caused by Minor Electrical Transient Upon Failure of One Light Filament. Failed Dual Filament Bulb Replaced + (16:50:32, 7 January 2025)
- ML17342B265 + (16:50:35, 7 January 2025)
- L-88-150, Forwards Mgt Onshift Weekly Rept for Wk Starting 880321 + (16:50:36, 7 January 2025)
- ML17342B263 + (16:50:39, 7 January 2025)
- L-88-151, Forwards Results of Nonradiological Confirmatory Measurement Samples Analyzed During Insp Repts 50-250/88-06 & 50-251/88-06 + (16:50:43, 7 January 2025)
- ML17342B261 + (16:50:46, 7 January 2025)
- L-88-160, Forwards Description of 870116 Request to Amend Licenses DPR-31 & DPR-41 to Allow Refueling Shutdown Margin of 5% & Basis for Proposed Change,Per NRC Request + (16:50:47, 7 January 2025)
- ML17342B255 + (16:50:51, 7 January 2025)
- ML17342B254 + (16:50:52, 7 January 2025)
- L-88-157, Application for Amends to Licenses DPR-31 & DPR-41,revising Tech Spec 3.4.4 to Require Applicability in Modes 1,2,3 & 4 & Allow One CCW HX to Be Out of Svc for 72 H.Action Requirements Revised for Consistency + (16:50:53, 7 January 2025)
- IR 05000250/1988006 + (16:50:58, 7 January 2025)
- ML17342B248 + (16:51:00, 7 January 2025)
- L-88-142, Forwards Summary of mgt-on-shift Weekly Repts,Per NRC 871019 Order + (16:51:02, 7 January 2025)
- L-88-155, Forwards Further Progress Re USI A-46,Generic Ltr 87-02, Verification of Seismic Adequacy of Mechanical Equipment in Operating Reactors. Results of site-specific Value/Impact Analyses in Hand & Meet Will Be Scheduled + (16:51:04, 7 January 2025)
- ML17342B245 + (16:51:07, 7 January 2025)
- ML17342B244 + (16:51:09, 7 January 2025)
- ML17342B240 + (16:51:10, 7 January 2025)
- ML17342B238 + (16:51:13, 7 January 2025)
- TAC:67050 + (16:51:14, 7 January 2025)
- ML17342B236 + (16:51:15, 7 January 2025)
- L-88-126, Annual Nonradiological Environ Monitoring Rept for 1987 + (16:51:16, 7 January 2025)
- ML17342B234 + (16:51:18, 7 January 2025)
- L-88-139, Confirms Agreement from 880315 Meeting That Operability of Intake Cooling Water/Component Cooling Water HXs Will Be Verified by Determining That Every Combination of HXs Capable of Removing Design Basis Heat Loads + (16:51:19, 7 January 2025)
- L-88-131, Comment on Proposed Rule 10CFR50,App J Re Primary Reactor Containment Leakage Testing for water-cooled Power Reactors. Util Endorses Addition of Mass Point Methodology to Acceptable Leakage Rate Calculational Methods + (16:51:22, 7 January 2025)
- ML17342B232 + (16:51:22, 7 January 2025)
- L-88-145, Discusses Nuclear Property Insurance Programs for Onsite Property Damage + (16:51:33, 7 January 2025)
- L-88-122, Forwards Summary of mgt-on-shift Weekly Rept for Wk Starting 880229,per NRC 871019 Order + (16:51:36, 7 January 2025)
- L-88-111, Withdraws 880115 Request for Relief from Offsite Organization Tech Specs to Implement Changes in Organization of Nuclear Energy Dept Because Util Decided to Maintain Tech Spec Organization & Submit License Amends + (16:51:38, 7 January 2025)
- ML17342B222 + (16:51:41, 7 January 2025)
- IR 05000250/1987048 + (16:51:42, 7 January 2025)
- IR 05000250/1987052 + (16:51:44, 7 January 2025)
- ML17342B218 + (16:51:46, 7 January 2025)
- ML17342B217 + (16:51:47, 7 January 2025)
- ML17342B215 + (16:51:49, 7 January 2025)
- L-88-115, Special Rept:Fire Barrier Penetration Breached for Longer than 7 Days & Other Fire Protection Impairment Noted.Caused by Number of Impairments Being Performed.Plant Continues to Implement Compensatory Measures + (16:51:51, 7 January 2025)
- ML17342B214 + (16:51:51, 7 January 2025)
- 05000251/LER-1988-003-01, :on 880207,shutdown of Unit from 100% Power Commenced Due to Exceeding Requirements of Tech Spec for Having Battery Charger 4S Out of Svc.Caused by Failure of Snubber Capacitor.Capacitor Replaced + (16:51:58, 7 January 2025)
- L-88-119, Responds to NRC Re Violations Noted in Insp Repts 50-250/87-08 & 50-251/87-08.Corrective Actions:Insp & Enhancement Program for Equipment Qualification Splices Initiated & Procedure Gmi 102.2 Revised + (16:52:00, 7 January 2025)
- ML17342B209 + (16:52:03, 7 January 2025)