ML17342B281

From kanterella
Jump to navigation Jump to search
Confirms 880422 Mgt Meeting to Discuss Status of SALP Improvements & Other Issues,Per 880325 Telcon.Proposed Agenda Encl
ML17342B281
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/08/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
Shared Package
ML17342B282 List:
References
NUDOCS 8804200552
Download: ML17342B281 (3)


Text

ACCESSION NBR FAC IL: 50-250 50-251

  • UTH. NAME GRACEI J. N.

REC IP. NAME CONWAYI W. F.

REGULAT Y INFORMATION DISTRIBUTIO

'YSTEM (RIDS) 8804200552 DOC. DATE: 88/04/08 NOTARIZED:

NO Turkey Point Plant.

Unit 3. Florida Power and Light C

Turkey Point Planti Unit 4I Florida PoUJer and Light C

AUTHOR AFFILIATION Region 2I Ofc of the Director RECIPIENT AFFILIATION Florida Power 5 Light Co.

DOCKET 0500025".

0500025.'UBJECT:

Confirms 880422 mgt meeting to discuss status of S*LP impr ovements 8c other issuesI per 880325 telcon.

DISTRIBUTION CODE:

IE4SD COPIES RECEIVED: LTR I

ENCL 3

SIZE: ~CO +

TITLE:

Summary of Significant Meeting with Licensee (Par t 50)

NOTES:

REC IP IENT ID CODE/M*ME PD2-2 LA INTERNAL: AEOD/DQA DEDRO NRR/DREP/EPB 10 OGC/RQED RES/DE/EIB COPl'ES LTTR ENCL 1

0 1

1 1

1 1

1 1

1 1

RECIPIENT lD CODE/NAME EDISONI G

  • EOD/DSP/TPAB NRR/DLPG/GAB 10 RPPUI~A R B 12 G F IL 02 RGN2 FILE 01 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 EXTERNAL:

LPDR NSIC 1

1 1

1 NRC PDR TOTAL NUMBER OF COPIES REQUIRED:

LTTR 15 ENCL 14

APR 0 8 19SS Fl rida Power and Light Company

~

~

~

TN:

Mr.

W.

F.

Conway Acting Group Vice President Nuclear Energy Department P. 0.

Box 14000 Juno

Beach, FL 33408 Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING ARRANGEMENTS - MANAGEMENT MEETING TURKEY POINT DOCKET NOS. 50-250 AND 50-251 This confirms the telephone conversation between Ms. S. Ferrell, FPSL Corporate licensing, and Mr. H. 0. Christensen of my staff on March 25, 1988, concerning a

management meeting to be conducted at the Turkey Point site on April 22,

1988, at 8:30 a.m.

We requested this meeting to discuss the status of SALP improvements and other issues.

A proposed agenda is enclo'sed.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely,

Enclosure:

Proposed Meeting Agenda cc w/encl:

+ S.

Odom, Vice President Turkey Point Nuclear Plant

~ J.

Baker, Plant Manager Turkey Point Nuclear Plant M W. Bladow, Plant gA Superintendent Q. Arias, Jr., Regulatory and Compliance Supervisor J.

Nelson Grace Regional Administrator 8804200552 880408 PDR ADDCK,05000250 G

PDR

~

~

bc w/encl:

C Resident Inspector

~ E. Edison, Project Manager, Project Directorate II-2, Division of Reactor

Projects, NRR DRS Technical Assistant Document Control Desk State of Florida RI I

R I RII RI RII C ris ensen R rlenjak ilson e, eyes ms t 4/

/88 4/p/88 4/$ /88 4/g/88

'/Q~/Sly 4/7/88

NRC/FPL MANAGEMENT MEETING AGENDA PTN NAB First Floor Conference Room 8:30 AM to 12:00 noon April 22, 1988 Time Item Presenter 8:30 a.m.

8:45 a.m.

9:00 a.m.

9:30 a.m.

9:45 a.m.

10:00 a.m.

10:30 a.m.

11:00 a.m.

Opening Remarks Plant Status Management on Shift

- Progress Report

- Status of Open Items Engineering

- Status of SALP Improvements Technical Specifications Break Training

- Status of SALP Improvements Security

- Status of SALP Improvements QIP Team

- Mean Time Between Failure J,

S.

Odom M. L. Ernst -

NRC C. J.

Baker L.

W. Pearce D. A. Chancy J. Arias T. A. Finn J.

G. West W. R. Williams 11:45 a.m.

Closing Remarks J.

S.

Odom M. L. Ernst -

NRC 12:00 noon Lunch