ML17342B275

From kanterella
Jump to navigation Jump to search
Confirms 880421 Enforcement Conference to Discuss Emergency Preparedness Issues,Per 880325 Telcon
ML17342B275
Person / Time
Site: Turkey Point  
Issue date: 04/08/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
Shared Package
ML17342B276 List:
References
NUDOCS 8804200276
Download: ML17342B275 (3)


Text

REGULATORY'NFORMATION DISTR IBUTIO YSTEM (RIDS)

ACCESSION NBR: 8804200276 DOC. DATE: 88/04/08 NOTARIZED:

NO FACIL: 50=250 Tur key Point Pl'ant.

Unit 3i Florida Poeer and Light C

50-251 Turl,ey Point Planti Unit 4. Florida Poeer and Light C

AUTH. NAME AUTHOR AFFILIATION GRACE> J. N.

Region 2i Ofc of the Director RECIP. NAME, RECIPIENT AFFILIATION CONWAYI W. F..

Florida Poeer 4 Light Co.

DQCVET

=Pi 05000250 05000253

SUBJECT:

Confirms 880421 enforcement conference to discuss-emergency preparedness issuesI per 880325 tel con.

DISTRIBUTION CODE:

IE45D COPIES RECEIVED: LTRi ENCL f SIZE; Ck + OL TITLE:

Summary of Significant Meeting eith Lic'ensee (Part 50)

NOTES:

RECIPIENT ID CODE/NAME PD2-2 LA COPIES LTTR ENCL 1

0 RECIPIENT ID CODE/NAME EDISONP G COP IES LTTR ENCL 1

1 INTERNAL: AEOD/DOA DEDRQ NRR/DREP/EPB 10 OGC/RQED RES/DE/EIB 1

1 1

1' 1

1 1

1 1

AEOD/DSP /TP*B NRR/DLPG/GAB 10 PMA ILRB12 REG FILE 02 FILE 01 1

1 1

1 1

1 1

1 EXTERNAL:

LPDR NSIC 1

1 1

1 NRC PDR 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 15 ENCL 14

1 APR 0 8 1988 Docket Nos. 50-250, 50-251 License Nos.

DPR-31, DPR-41 Florida Power and Light Company ATTN:

Mr. W. F.

Conway Acting Group Vice President Nuclear Energy Department

'. 0.

Box 14000 Juno

Beach, FL 33408 Gentlemen:

SUBJECT:

ENFORCEMENT CONFERENCE - TURKEY POINT DOCKET NOS. 50-250 AND 50-251 This confirms the telephone conversation between Mr. P.

Pace of your staff and Mr. H. Christensen of my staff on March 25,

1988, concerning an enforcement conference to be conducted at the Turkey Point facility on April 21, 1988, at 1:00 p.m.

The purpose of this meeting is to discuss the recent events (Emergency Preparedness issues) at the Turkey Point facility.

Should you have any questions regarding these arrangements, we will be pleased to discuss them with you.

1 Sincerely, cc:

J.

S.

Odom, Vice President Turkey Point Nuclear Plant C. J. Baker, Plant Manager Turkey Point Nuclear Plant L. W. Bladow, Plant QA Superintendent J. Arias, Jr., Regulatory and Compliance Supervisor bcc:

(See page 2)

J. HP".,;! r~;.~r J.

Nelson Grace

'egional Administrator 8804200276 880408 PDR ADOCK 05000250 G

PDR

Florida Power and Light Company APR 08

$988 bcc:

NRC Resident Inspector DRS Technical Assistant G.

E. Edison, Project Nanager, Project Directorate II-2 Division of Reactor Projects, NRR Document Control Desk State of Florida R I C rist sen:er 04/ '88 RII RI RII RII Cr enja" ilson ehl eyes rnst 04/

/88 04'88 4f7 /88

. 4/7/88 04/ F88