ML17342B285
| ML17342B285 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/08/1988 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Murley T Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8804220027 | |
| Download: ML17342B285 (6) | |
Text
APR OS lS88 MORANDUM FOR:
Thomas E. Murley, Director Office of Nucl ear Reactor Regulation FROM:
SUBJECT:
J.
Nelson Grace, Regional Administrator BIWEEKLY STATUS REPORT ON TURKEY POINT The purpose of this memorandum is to advise senior NRC management of the status of the Turkey Point Project.
The enclosure discusses recent operating events and performance trends.
Enclosure:
Turkey Point Status Report (March 16 - April 1, 1988) cc w/encl:
J. Taylor, DEDRO S. Varga, NRR
.W. F.
Conway Acting Group Vice President Nuclear Energy Department P. 0.
Box 14000 Juno
- Beach, FL 33408-0420
~ Odom, Vice President Turkey Point Nuclear Plant P.O.
Box 029100 Miami, FL 33102
~J.
Baker, Plant Manager Turkey Point Nuclear Plant P. 0.
Box 029100 Miami, Florida 33102 harold F. Reis, Esq.
Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036
~n T. Butler, Esq-
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 cc w/encl:
(Continued on page 2)
V
Thomas E. Murley APR 0 8 1888 cc w/encl:
(Continued)
+ S. Environmental Protection Agency Region IV Regional Radiation Representative 345 Courtland Street, N.W.
Atlanta, Georgia 30308 torney General Department of Legal Affairs The Capitol Building Tallahassee, Florida 32301 4H'an Schubert, Public Health Physicist Manager Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida Twin Towers 2600 Blair Stone Road Tallahassee, Florida 32301 State Planning and Development Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Wrgio Pereira County Manager of Metropolitan Dade County Miami, Florida 33130
~ergovernmental Coordination and Review Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Martin H. Hodder, Esq.
1131 N.E. 86th Street Miami, Florida 33130 bcc w/encl:
(See page 3)
/
C p
Thomas E. Hurley APR 0 8 1398 bcc w/encl:
PKC Resident Inspector Document Control Desk State of Florida DRS Technical Assistant R I RII CChri tensen R zlenjak lson 4/$ /88 4/Q/88 4/
/88 RI H hl Re es rnst
'/$ /88 4/g/88 4Q /88
ENCLOSURE TURKEY POINT STATUS REPORT (March 16 - April 1, 1988) 1.
Plant Status Unit 3 was in mode 1.
Unit 4 was in mode 1.
2.
Facilit 0 erations Summar Both units were operating at 100% power.
On March 16,
- 1988, Unit 3 shut down due to noise coming from the "3D" Moisture Separator Reheater (MSR).
Upon inspection, it was discovered that the MSR's baffle plates (all HSRs) had cracked welds.
The licensee ~
conducted repairs and returned the unit to service on March 23, 1988.
On March 24,
- 1988, the unit was shut down due to high chlorides in the condenser and steam generators.
The licensee repaired a condenser tube leak and returned the unit to service on March 30, 1988.
3.
Items of Interest The independent management appraisal is nearing completion.
The final report is due April 18, 1988.
M. Ernst, the Deputy Regional Administrator, attended the senior evaluation team meeting with the FPL senior-level review board on March 23, 1988.
4.
NRC Staff Activities Durin the Period A working level meeting at Turkey Point with the licensee was held Harch 29 - April 1, 1988, to discuss the Revised Technical Specifications (TS).
The Electrical and Boration TSs were reviewed.
NRR informed the licensee that the Proof and Review copy will be issued June 10, 1988.
An Enforcement Conference on Emergency Preparedness issues is scheduled for April 21,
- 1988, at the Turkey Point site.
The next Management Meeting is scheduled for April 22, 1988, at the site.