3.

l.

ONE emergency containment cooling unit may be out ot serv>ce t'or a period ot 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Prior to initiating maintenance the other TWO units snail be t~sted to demonstrate operability.

2.

ONE containment spray pump may be out or service provided it is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The ranaining containment spray pump shall be tested to demonstrate operability bet'ore initiating maintenance or the inoperable pump.

3.

Any valve in tne system may be inoperable provided r~pa>rs are completed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Prior to initiating repairs, all valves that provide tne duplicate function shall oe tested to demonstrate operability.

EMERGENCY CONTAINMENT FILTERING SYSTEM 5ec.ho~

g~ i~Wed a.

The reactor shall not be made critical, except ror low power physics tests unless:

1.

THREE emergency containment tiltering units are operable..

2.

At I valves, interlocks and piping assocfat~d with th~

~

above components and required tor post-accident operation, are operable.

b.

Ouri ng power operation:

l.

ONE unit may be fnoperable for a period ot 7 days it the other TWO are operable.

2.

Any valve in the system may be inoperable provided repairs are completed within 7 days.

Prior to initiating maintenance, all valves that provide the duplicate function shall be tested to demonstrate operability.

3.

If after 7 days the unit fs still fnoperable Specification 3.0. 1 applies to 3.4.3.b.

COMPONENT COOLING SYSTEM The re r shal l not, be made critical, e tur low power physics test less the tollowfng tions are met:

1.

THREE component coo ps are operable.

2.

.THREE compo cooling heat exc rs are operaole.

s~4-p~pe.s.1-1~

3.

valves, interlocks and piping associated above components are operablc.

the 880eai00VS 8ao~ae PDR

. ADOCN. 05000250 P

DCD 3.4-4 Amendments 83 5 77

3.4 En ineered Safet Features 3.4.4 Com onent Coolin Water S stem The component cooling water system shall be operable with:

a)

Three operable component cooling water pumps b)

Three operable component cooling water heat exchangers c) All valves, interlocks, and piping associated with the above components operable.

A licabilit :

Modes 1, 2, 3 and 4

Action:

2

~

3.

With one CCW pump inoperable, restore the pump to OPERABLE status within 7 days, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

With two CCW pumps inoperable, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> either restore one CCW pump to OPERABLE status and follow action statement 1 above for the other

pump, or restore both CCW pumps to OPERABLE
status, or be in at least HOT STANDBY within the next 6

hours and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

With one CCW heat exchanger inoperable, restore the heat exchanger to OPERABLE status within 72

hours, or be in at least HOT STANDBY within the next 6

hours and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

With any of the components specified in 3.4.4.c above inoperable, declare the associated component inoperable and follow the appropriate action statement for the respective component.

3.4-4a TCG.CCW

e

b.

Ouri ower operation, the requirenents or'.4.4 may be modi fied a

tated baal ow.

Ir the systen i s restored to meet the cond>

s ot 3.4.4.a wi tnin tt

>me per>od SPeCified, the reaC Shall be Pia in the hOt Shutacwn condition.

If the requ ents 3.4.4.a ar~ not Satisf>~d within an additiOnal 48 hO, the reaCtur Shall be plaCed in the cold snutdown c

tion. '> t>cation 3.0. 1 applies to 3.4.4.b.

l.

ONE, may be out of service for 7 days.

ONE additional pump and ONE heat exchanger may oe ou serv i ce for peri od oi 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

INTAKE COOLING MATER SYSTEM a.

The reactor shall not be made critical unless the following conditions are met:

].

THREE intake cooling water pumps and T'AO headers are operable.

2.

All valves, interlocks and piping associated with the operation of these

pumps, and requi red for post accident operation, are operable.

b.

Ouring power operation, the requirements of 3.4.5.a.,

above, may be modified to allow any one of the following components to be inoperable provided the remaining systems are in cont>nuous operation.

It the system is nOt reStared tO meet the requirementS Of 3.4.5.a.

within the. time period specified, the r aCtor shall be placed in the hot shutdown condition.

If the requirements or 3.4.5.a are not satistied wi tnin an addi t>onal 48 nours, the reac or shall be placed in the cold shutdown condition.

Speci rication 3.0. 1 applies to 3.4.5.b.

l.

One of the two headers may be out of service tor a period of 24 huurs.

2.

One intake cooling water pump may be out of service for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3. 4-5 Amendments 83 5 77

<<'+ >"

~ e Wq 4

f