L-88-178, Forwards Select Sys Assessment Progress Summary for Mar 1988
| ML17342B280 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/11/1988 |
| From: | Conway W FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| L-88-178, NUDOCS 8804200372 | |
| Download: ML17342B280 (8) | |
Text
REGULA Y INFORMATION DISTRIBUTIO YSTEM (RIDS)
ACCESSION NBR: 8804200372 DOC. DATE: 88/04/11 NOTARIZED:
NO DOCKET ¹ FACIL: 50-250 Tuvkeg Point Plant>
Unit 3> Flovida Power and Light C
05000250 50 251 Turkey Point Planti Unit 4i Florida Power and Light C
05000251 AUTH. NAME AUTHOR AFFILIATION CONMAY> W. F.
Flov ida Power Cc Light Co.
REC IP. NAME RECIPIENT AFFILIATION Document Contv ol Branch (Document Control Desk)
SUBJECT:
Forwards Select Sjs Assessment Progress Summary Nor Mar 1988.
DISTRIBUTION CODE:
A001D COPIES RECEIVED: LTR
~
ENCL l
SIZE:
TITLE:
OR Submittal:
Gener a l Distv'i but i on NOTES:
RECIPIENT ID CODE/NAME PD2-2 LA EDISON' COPIES LTTR ENCL 1
0 1
1 REC IP IENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 5
5 INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEBT/MTB 9H NRR/DOEA/TSB 11 OGC 15-B-18 RES/DE/EIB EXTERNAL:
LPDR NSIC 1
0 1
1 1
1 1
1 0
1 1
1 1
NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/
AS/ILRB12 FIL 01 NRC PDR 1
1 1
1 1
1 1
1 1
1 1
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 18
lp]
I I
if, bg a
2
,Ci J
ff,'/~=j
~ >~6'f
<<'J" fJ
'll'I g h
Et
';i > "
I', 33k~
hl gl
~l,,,f "i,'!M if~fit'h i =,lf$ fJ 1
4
~ Wi 1 p I
~ 4
'3 l
11f 1c JP gfq., Mid i
P. O.
14000, JUNO BEACH, FL 33408.0420
>y4lljyz ApRIL 1 1 1988 L-88-178 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket. Nos.
50-250 and 50-251 Select S stem Assessment Pro ress Summar Attached please find the March 1988 progress summary of the Select System Assessment.
Should there be any questions regarding this information, please contact us.
Very truly yours, W. F.
o ay Acting Group Vice President Nuclear Energy WFC/SDF/gp Attachment cc:
Dr. Z. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8804200372 88041 1 PDR ADQCK 05000250 R
PDR SDF/010 ASS pD an FPL Group company
'C k
'll
SELECT SYSTEM REVIEW MARCH 1988 PROGRESS Desi Basis Reconstitutio Work continues on a
risk based assessment of historic Plant Changes/Modifications.
Reconstitution of design bases for Area Radiation Monitoring, Process Radiation Monitoring and Normal Containment Cooling (scoped to include the Normal Containment Coolers and CRDM Coolers) continues in accordance with the Integrated Schedule.
Design Basis Verification activities for the original fifteen Select Systems continue in accordance with the Integrated Schedule.
Safe En neerin Grou SEG The SEG has commenced review of the Area Radiation Monitoring, Process Radiation Monitoring and Normal Containment Cooling Systems to identify those items appropriate for punchlisting and further review and action.
Walkdowns Preparations have been initiated to perform Small Bore Piping and Tubing and P&ID walkdowns of outside containment 'portions of the Area Radiation Monitoring, Process Radiation Monitoring and Normal Containment Cooling systems.
These activities will proceed in accordance with the Integrated Schedule.
Other si ificant ro ress Evaluated Containment Spray (CS) valves for internal leakage with no unsatisfactory findings Reviewed CS System industry experience with no generic issues identified Replaced CS Pump Discharge Drain Valve 942W-U4 Evaluated need for replacing blind flanges on CS test valve and found to not be necessary Completed Appendix R valve operator modifications on Residual Heat Removal (RHR) System Removed Safety In]ection (SI) accumulator relief valve isolation valves Overhauled SI valves CV-850 E&F Worked various SI valves to correct seat leakage
Page 2 of 2 o
Repaired SI pump casing drain line o
Verified DC breaker labels conform to standard format