Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17342B326 + (16:49:25, 7 January 2025)
- ML17342B325 + (16:49:27, 7 January 2025)
- TAC:60549 + (16:49:28, 7 January 2025)
- ML17342B323 + (16:49:30, 7 January 2025)
- ML17342B319 + (16:49:31, 7 January 2025)
- ML17342B316 + (16:49:33, 7 January 2025)
- ML17342B313 + (16:49:35, 7 January 2025)
- ML17342B307 + (16:49:36, 7 January 2025)
- ML17342B305 + (16:49:37, 7 January 2025)
- IR 05000250/1988003 + (16:49:38, 7 January 2025)
- 05000250/LER-1988-004, :on 880318,auxiliary Feedwater Pumps Actuated Due to Drop in Steam Generator Level.Caused by Reactor Control Operator Failure to Monitor Steam Generator Level. Operator Counseled Re Awareness of Actions + (16:49:41, 7 January 2025)
- ML17342B301 + (16:49:44, 7 January 2025)
- ML17342B300 + (16:49:45, 7 January 2025)
- ML17342B298 + (16:49:47, 7 January 2025)
- L-88-185, Responds to Violations Noted in Insp Repts 50-250/87-54 & 50-251/87-54.Corrective Actions:Surveillance Procedures 3/4-OSP-075.6 & 3/4-OSP-075.7 Revised to Correct Discrepancies in Consumption Rates + (16:49:48, 7 January 2025)
- ML17342B296 + (16:49:51, 7 January 2025)
- ML17342B294 + (16:49:59, 7 January 2025)
- ML17342B290 + (16:50:00, 7 January 2025)
- ML17342B289 + (16:50:02, 7 January 2025)
- L-88-183, Forwards Monthly Operating Repts for Mar 1988 & Corrected Feb 1988 Unit Shutdowns & Power Reductions Rept for Unit 4. Corrected Rept Provides Info on Outage That Was Omitted from Original Rept + (16:50:03, 7 January 2025)
- ML17342B286 + (16:50:06, 7 January 2025)
- ML17342B285 + (16:50:07, 7 January 2025)
- L-88-154, Forwards Summary Rept of Integrated Schedule Generated for Month of Mar 1988.Schedules Discussed in Rept Reflect Info as of Issuance Date of 880315.First Integrated Schedule Regulatory Rept Will Be Issued in May 1988 + (16:50:08, 7 January 2025)
- ML17342B283 + (16:50:12, 7 January 2025)
- ML17342B281 + (16:50:13, 7 January 2025)
- L-88-178, Forwards Select Sys Assessment Progress Summary for Mar 1988 + (16:50:14, 7 January 2025)
- L-88-156, Responds to IE Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Subj Breakers Not Used in Any Class IE Sys at Plant + (16:50:17, 7 January 2025)
- ML17342B277 + (16:50:21, 7 January 2025)
- ML17342B275 + (16:50:23, 7 January 2025)
- ML17342B271 + (16:50:24, 7 January 2025)
- IR 05000250/1987051 + (16:50:26, 7 January 2025)
- L-88-163, Special Rept:Nonfunctional Fire Barrier Penetration Not Returned to Functional Status within 7 Days.Caused by Mods Being Performed & Equipment Malfunction.Plant Continues to Implement Compensatory Measures as Applicable + (16:50:28, 7 January 2025)
- 05000250/LER-1988-003, :on 880308,containment Ventilation & Control Room Ventilation Isolation Occurred.Caused by Minor Electrical Transient Upon Failure of One Light Filament. Failed Dual Filament Bulb Replaced + (16:50:32, 7 January 2025)
- ML17342B265 + (16:50:35, 7 January 2025)
- L-88-150, Forwards Mgt Onshift Weekly Rept for Wk Starting 880321 + (16:50:36, 7 January 2025)
- ML17342B263 + (16:50:39, 7 January 2025)
- L-88-151, Forwards Results of Nonradiological Confirmatory Measurement Samples Analyzed During Insp Repts 50-250/88-06 & 50-251/88-06 + (16:50:43, 7 January 2025)
- ML17342B261 + (16:50:46, 7 January 2025)
- L-88-160, Forwards Description of 870116 Request to Amend Licenses DPR-31 & DPR-41 to Allow Refueling Shutdown Margin of 5% & Basis for Proposed Change,Per NRC Request + (16:50:47, 7 January 2025)
- ML17342B255 + (16:50:51, 7 January 2025)
- ML17342B254 + (16:50:52, 7 January 2025)
- L-88-157, Application for Amends to Licenses DPR-31 & DPR-41,revising Tech Spec 3.4.4 to Require Applicability in Modes 1,2,3 & 4 & Allow One CCW HX to Be Out of Svc for 72 H.Action Requirements Revised for Consistency + (16:50:53, 7 January 2025)
- IR 05000250/1988006 + (16:50:58, 7 January 2025)
- ML17342B248 + (16:51:00, 7 January 2025)
- L-88-142, Forwards Summary of mgt-on-shift Weekly Repts,Per NRC 871019 Order + (16:51:02, 7 January 2025)
- L-88-155, Forwards Further Progress Re USI A-46,Generic Ltr 87-02, Verification of Seismic Adequacy of Mechanical Equipment in Operating Reactors. Results of site-specific Value/Impact Analyses in Hand & Meet Will Be Scheduled + (16:51:04, 7 January 2025)
- ML17342B245 + (16:51:07, 7 January 2025)
- ML17342B244 + (16:51:09, 7 January 2025)
- ML17342B240 + (16:51:10, 7 January 2025)
- ML17342B238 + (16:51:13, 7 January 2025)
- TAC:67050 + (16:51:14, 7 January 2025)