ML17342B305

From kanterella
Jump to navigation Jump to search
Forwards Enercov Svcs Inc, Independent Mgt Appraisal, Per EA-87-085,dtd 871019.Recommendations Currently Being Analyzed & Details of & Schedules for Implementation Will Be Forthcoming in Accordance W/Order.W/O Encl
ML17342B305
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/18/1988
From: Hudiburg J
FLORIDA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-88-181, NUDOCS 8804270258
Download: ML17342B305 (4)


Text

REGULA ~. Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR: 8804270258 DOC. DATE: 88/04/18 NOTARIZED: NO DOCKET FACIL: 50-250 Turkey Point Planti Unit 3i Florida Power and Light C 05000250 50-251 Turkeg Point Planti Unit 4i Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFF ILI'TION HUDIBURGi J. J. Florida Pacer 5 Light Co.

REC IP. NAME RECIPIENT AFFILIATION GRACEi J. N. Region Zi Ofc of the Director Appraisals

SUBJECT:

Forwards " Independent Mgt " per NRC Order EA 87-85 dated 871019. Recommendations currently being anal'ed.

Details of 5 schedules for implementation forthcoming in accordance e/Order.

DISTRIBUTION CODE: IE36D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Immediate/Confirmatory Action Ltr (50 Dkt-Other Than Emergency Prepar NOTES:

REC I P IENT COPIES REC IP IENT COP IES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA PD2-2 PD EDISON' INTERNAL: NRR/DOEA/EAB 11 RES/DE/E IB RGN2 FILE 01 RGN2/DRSS/FPRPR EXTERNAL: LPDR NRC PDR NSIC TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL

'J P.O. BOX 029100 MIAMI, F L 33102 FLORIOA POWER 8I LIGHT COMPANY April 18, 1988 L-88-181 Dr. J. Nelson Grace Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta St., N.W., Suite 2900 Atlanta, GA 30323

Dear Dr. Grace:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Inde endent Mana ement A raisal ENERCON .Services, Inc. has completed the Independent Management Appraisal of Florida Power & Light Company's (FPL) nuclear operation, and has submitted the final report to FPL.

In accordance with NRC Order EA 87-85, dated October 19, 3987. FPT had directed ENERCON to submit to the NRC Region Ii Administrator a copy of the report at the same time sent to FPL. ENERCON has advised FPL that they have complied it is with that direction. Enclosed is an additional copy of the report for docketing.

Florida Power & Light Company believes that ENERCON has performed a comprehensive appraisal, which has furnished the basis for many constructive recommendations to enhance the performance of Turkey Point as well as our overall nuclear organization. The recommendations are currently being analyzed, and the details of and schedules for implementation will be forthcoming in accordance with the Order.

If you have questions, please feel free to contact me.

Very truly yours, Chairman of the Board JJH/RJS/gp Attachment 8804270258 880018 \

P DR A DOCK 05000250 ~

P PDR

++8 C.

PEOPI,E... SERVING PE9PLE L,r,&d e~ DgP

cc: Mr. Victor Stello, USNRC Mr. James M. Taylor, USNRC Dr. Thomas Murley, USNRC Mr. Edward Jordan, USNRC Mr. Steven Varga, USNRC Mr. Herbert Berkow, USNRC Mr. Gordon Edison, USNRC Mr. Daniel McDonald, USNRC Mr. Edmond Tourigny, USNRC Mr. James Lieberman, USNRC Mr. Zack T. Pate, INPO Document Control Desk, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant