REGULATO INFORMATION DISTRIBUTION TEM (RIDS)
ACCESSIOi" NBR: 8805020140 DQC. DATE: 88/04/21 NOTARIZED:
NO FACIL: 50-250 Turkey Point Plant>
Unit 3> Florida Power and Light C
50-251 Turkey Point Plant>
Unit 4> Florida Power and Light C
AUTH. NAME AUTHOR AFFILIATION GRACE> J. N.
Region 2>
Ofc of the Director REC IP. NAME RECIPIENT AFFILIATION HUDIBURG> J. J.
Florida Power 4 Light Co.
SUBJECT:
Informs util of near tet m plans to assess results from independent mgt appraisal program. Request that util make appropriated arrangements for NRC visit on 880502.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED: LTR J ENCL 0 SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
DOCKET 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 PD CQP IES LTTR ENCL RECIPIENT ID CODE/NAME EDISON> G COP IES LTTR ENCL INTERNAL:
AEOD NRR MORISSEAU> D NRR/DLPG/GAB 10 NRR/DREP/EPB 10 NRR/DR IS DIR 9A
~P~t TEBSQMAN> J WRY EILM 02 RGN2 FILE 01 DEDRO NRR/DLPG/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS/ ILRB12 QGC 15-B-18 RES/DRPS DIR 1
1 1
2 1
1 1
EXTERNAL:
TOTAL NUMBER OF COP IES REQUIRED:
LTTR 22 ENCL
April 21, 1988 Docket Nos.
50-250 50-251 PTorida Power and Light Company
~ATTN:
J.
J.
Hudiburg Chief Executive Officer 9250 West Flagler Street Miami, Florida 33102 Gentlemen:
This is to inform you of our near-term plans to assess the results from your Independent Management Appraisal Program.
Comments on your plans for this program (submitted in response to NRC Order EA 87-85 of October 19, 1987) were previously provided to you in my letter dated December 6, 1987.
Our assessment of the results from the independent appraisal wi 11 begin immediately since the report, resulting from the work of your independent contractor (ENERCON Services),
has been submitted to the NRC.
The NRC will assess whether the ENERCON Independent Management Appraisal of the Turkey Point Plant and FP&L was sufficient in scope,
- depth, and thoroughness to provide a high level of assurance that the remaining significant problems adversely affecting Turkey Point performance, together with the underlying (root) causes, have been identified and accurately described.
The results of the above assessment the need for additional evaluations evaluation of Turkey Point and FP&L, areas requiring further evaluation.
Bethesda on December 15, 1987, that evaluation of Turkey Point and FP&L ENERCON report.
Those former plans plans.
will then be used by the NRC to determine by FP&L or an independent NRC diagnostic including the technical and organizational We had indicated to you in a meeting in the NRC would conduct a diagnostic at some time following receipt of the have now been superseded by the above The NRC assessment of the ENERCON report wi 11 be led by the Office for Analysis and Evaluation of Operational Data (AEOD) and the effort will be supported by the Offices of Nuclear Reactor Regulat'ion (NRR) and Region II.
We anticipate that an NRC team of about eight people will need to visit the offices of ENERCON for a review of the records that form the basis for the report and to interview individuals that contributed to the report.
This visit is expected to take place the week of May 2, 1988.
You are requested to make the appropriate arrangements for this visit.
E 8805020140 880421 PDR ADOCK 05000250 P
PDR y 0
Florida Power and Light Company April 21, 1988 If you have any questions or desire additional clarifications on our review of the ENERCON evaluation, please contact either Edward Jordan or R.
Lee Spessard of AEOD.
Sincerely, cc:
F.
Conway, Acting Group Vice President, Nuclear
~
~
~
Energy 'Department J.
Dickey, Vice President
~
~
~
Nuclear Energy S.
Odom, Vice President turkey Point Nuclear Plant v'C J.
Baker, Plant Manager Turkey Point Nuclear Plant L.
W. Bladow, Plant QA J
Superintendent J. Arias, Jr.,
Regulatory and Compliance Supervisor bcc: +P.
E.
Edison, Project Manager, NRR
~~NRR Resident Inspector DRS Technical Assistant State of Florida Document Control Desk Original Signed by e son race Regional Administrator Distribution:
EOD R/F EIIB R/F Stel lo Taylor T ehm OMartin Taylor
+Liberman BHayes
~
~
~
~
AMTroskoski JNGrace GLainas JRoe
/JPartlow Edison Berkow Reyes JHeltemes
/LSpe'ssard
~
~
MHSniezek MDRubin HNovak Allison Bailey vgFr eeman X Lloyd
/Perch
<QSul 1 ivan
<AHowell
~
~
~
~
NAME :HBailey:eh
- SDRubin
- RLSpessard
- CJHel temes: JNGrace:
JH Sniezek: EL Jordan DATE:04/12/88: 04/12/88: 04/12/88: 04/ /88: 04/12/88: 04/12/88: 04/12/88 I
NAME :JNGrace
~
~
0 DATE :04/2 I/88