Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17345A140 + (16:48:32, 7 January 2025)
- ML17345A138 + (16:48:34, 7 January 2025)
- L-88-190, Rev 1 to Turkey Point Plant Unit 3 Cycle XI Startup Rept + (16:48:35, 7 January 2025)
- 05000251/LER-1988-004-02, :on 880408,Tech Spec Table 3.5-2 Requirements Exceeded.Caused by Failure of Relays 327TX/4A2 & 327TX/4A2 in Undervoltage Protection Scheme for 4A 480 Volt Load Ctr. Relays Replaced & Tested + (16:48:38, 7 January 2025)
- L-88-127, Requests Extension of Issuance of Revised Engineering Evaluation for Unit 3 to 2 Months Following 4 Month Performance Test of Component Cooling Water HX Continuous Tube Cleaning Sys + (16:48:39, 7 January 2025)
- ML17345A134 + (16:48:41, 7 January 2025)
- L-88-207, Responds to NRC 871030 Request for Licensee Plan for Complying w/10CFR50,App G,Section V.C Re Fracture Toughness Requirements & Recommendations That Util Surveillance Program Revised & Integrated Analysis Provided + (16:48:42, 7 January 2025)
- L-88-203, Special Rept:Nonfunctional Fire Barrier Penetration Not Returned to Functional Status within 7 Days.Caused by Implementation of Plant Mods & Equipment Malfunction. Compensatory Measures Implemented as Applicable + (16:48:44, 7 January 2025)
- ML17345A130 + (16:48:47, 7 January 2025)
- ML17345A127 + (16:48:48, 7 January 2025)
- L-88-192, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/87-54 & 50-251/87-54.Corrective Actions:Gauges to Be in Svc During Off Normal/Emergency Condition Instead of Being Isolated & Procedure Onop 0208.11 Revised + (16:48:49, 7 January 2025)
- IR 05000250/1988005 + (16:48:56, 7 January 2025)
- ML17345A091 + (16:49:00, 7 January 2025)
- ML17345A055 + (16:49:02, 7 January 2025)
- ML17345A052 + (16:49:03, 7 January 2025)
- EPID:L-2017-LLR-0141 + (16:49:05, 7 January 2025)
- ML17345A046 + (16:49:05, 7 January 2025)
- ML17345A014 + (16:49:06, 7 January 2025)
- ML17342B421 + (16:49:10, 7 January 2025)
- ML17342B415 + (16:49:11, 7 January 2025)
- IR 05000445/2017404 + (16:49:12, 7 January 2025)
- ML17342B409 + (16:49:13, 7 January 2025)
- ML17342B404 + (16:49:16, 7 January 2025)
- ML17342B388 + (16:49:18, 7 January 2025)
- ML17342B386 + (16:49:19, 7 January 2025)
- ML17342B343 + (16:49:20, 7 January 2025)
- ML17342B329 + (16:49:22, 7 January 2025)
- ML17342B328 + (16:49:23, 7 January 2025)
- ML17342B326 + (16:49:25, 7 January 2025)
- ML17342B325 + (16:49:27, 7 January 2025)
- TAC:60549 + (16:49:28, 7 January 2025)
- ML17342B323 + (16:49:30, 7 January 2025)
- ML17342B319 + (16:49:31, 7 January 2025)
- ML17342B316 + (16:49:33, 7 January 2025)
- ML17342B313 + (16:49:35, 7 January 2025)
- ML17342B307 + (16:49:36, 7 January 2025)
- ML17342B305 + (16:49:37, 7 January 2025)
- IR 05000250/1988003 + (16:49:38, 7 January 2025)
- 05000250/LER-1988-004, :on 880318,auxiliary Feedwater Pumps Actuated Due to Drop in Steam Generator Level.Caused by Reactor Control Operator Failure to Monitor Steam Generator Level. Operator Counseled Re Awareness of Actions + (16:49:41, 7 January 2025)
- ML17342B301 + (16:49:44, 7 January 2025)
- ML17342B300 + (16:49:45, 7 January 2025)
- ML17342B298 + (16:49:47, 7 January 2025)
- L-88-185, Responds to Violations Noted in Insp Repts 50-250/87-54 & 50-251/87-54.Corrective Actions:Surveillance Procedures 3/4-OSP-075.6 & 3/4-OSP-075.7 Revised to Correct Discrepancies in Consumption Rates + (16:49:48, 7 January 2025)
- ML17342B296 + (16:49:51, 7 January 2025)
- ML17342B294 + (16:49:59, 7 January 2025)
- ML17342B290 + (16:50:00, 7 January 2025)
- ML17342B289 + (16:50:02, 7 January 2025)
- L-88-183, Forwards Monthly Operating Repts for Mar 1988 & Corrected Feb 1988 Unit Shutdowns & Power Reductions Rept for Unit 4. Corrected Rept Provides Info on Outage That Was Omitted from Original Rept + (16:50:03, 7 January 2025)
- ML17342B286 + (16:50:06, 7 January 2025)
- ML17342B285 + (16:50:07, 7 January 2025)
- L-88-154, Forwards Summary Rept of Integrated Schedule Generated for Month of Mar 1988.Schedules Discussed in Rept Reflect Info as of Issuance Date of 880315.First Integrated Schedule Regulatory Rept Will Be Issued in May 1988 + (16:50:08, 7 January 2025)