ML17342B329

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/88-05 & 50-251/88-05 on 880321-25.No Violations or Deviations Noted
ML17342B329
Person / Time
Site: Turkey Point  
Issue date: 04/19/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
Shared Package
ML17342B330 List:
References
NUDOCS 8805030041
Download: ML17342B329 (3)


See also: IR 05000250/1988005

Text

APR 19

>9B8

Docket Nos. 50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power and Light Company

ATTN:

Mr.

W.

F.

Conway

Acting Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-250/88-05

AND 50-251/88-05

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

P.

G. Stoddart

on

March 21-25,

1988.

The inspection

included

a review of

activities authorized for your Turkey Point facility.

At the conclusion of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter, please

contact us.

Sincerely,

e

Enclosure:

Insp'ection

Report

cc w/encl:

(See

page

2)

Douglas

M. Collins, Chief

Emergency

Preparedness

and

Radiological Protection

Branch

Division of Radiation Safety

and Safeguards

8805030041

880419

PDR

ADOCK 05000250

9

DCD

~ +t

Florida Power and Light Company

cc w/encl:

J.

S.

Odom, Vice President

Turkey Point Nuclear Plant

C. J. Baker, Plant Manager

Turkey Point Nuclear Plant

L.

W. Bladow, Plant

gA Superintendent

J. Arias, Jr., Regulatory

and Compliance

Supervisor

G.

E. Edison, Project Manager,

Project

Directorate II-2, Division of Reactor

Projects,

NRR

bcc w/encl:

NRC Resident

Inspector

DRS Technical Assistant

Document Control

Desk

State of Florida

~ RI I

PSto dart

4/81 /88

RI I

4 i988

RII

RCr 1 enja&

4/ ~/88