Text
APR 19
>9B8
Docket Nos. 50-250,
50-251
License
Nos.
Florida Power and Light Company
ATTN:
Mr.
W.
F.
Conway
Acting Group Vice President
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC INSPECTION
REPORT
NOS. 50-250/88-05
AND 50-251/88-05
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
P.
G. Stoddart
on
March 21-25,
1988.
The inspection
included
a review of
activities authorized for your Turkey Point facility.
At the conclusion of the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Within the
scope
of the
inspection,
no violations
or deviations
were
identified.
In accordance
with Section 2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter, please
contact us.
Sincerely,
e
Enclosure:
Insp'ection
Report
cc w/encl:
(See
page
2)
Douglas
M. Collins, Chief
Emergency
Preparedness
and
Radiological Protection
Branch
Division of Radiation Safety
and Safeguards
8805030041
880419
ADOCK 05000250
9
~ +t
Florida Power and Light Company
cc w/encl:
J.
S.
Odom, Vice President
Turkey Point Nuclear Plant
C. J. Baker, Plant Manager
Turkey Point Nuclear Plant
L.
W. Bladow, Plant
gA Superintendent
J. Arias, Jr., Regulatory
and Compliance
Supervisor
G.
E. Edison, Project Manager,
Project
Directorate II-2, Division of Reactor
Projects,
bcc w/encl:
NRC Resident
Inspector
DRS Technical Assistant
Document Control
Desk
State of Florida
~ RI I
PSto dart
4/81 /88
RI I
4 i988
RII
RCr 1 enja&
4/ ~/88