List of results
- ML17345A725 + (16:32:39, 7 January 2025)
- L-89-205, Forwards Rev 15 to Topical QA Rept, Dtd 890608.Changes Do Not Reduce Commitments Made in Program Previously Accepted by NRC + (16:34:30, 7 January 2025)
- ML17345A724 + (16:34:30, 7 January 2025)
- L-89-195, Special Rept Re Breached Fire Barriers & Other Fire Protection Sys Impairments.Fire Protection Impairment 2458, Opened 890420,to Repair Penetration Seal,Still Being Worked. Plant Continues to Implement Compensatory Measures + (16:34:33, 7 January 2025)
- ML17345A717 + (16:34:33, 7 January 2025)
- L-89-194, Forwards Justification for Continued Operation of Plant, While NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification Issues Being Resolved + (16:34:35, 7 January 2025)
- IR 05000352/2017502 + (16:34:37, 7 January 2025)
- L-89-189, Forwards Apr 1989 Progress Summary of Select Sys Assessment + (16:34:38, 7 January 2025)
- IR 05000250/1989025 + (16:34:42, 7 January 2025)
- ML17345A707 + (16:34:43, 7 January 2025)
- IR 05000250/1989015 + (16:34:44, 7 January 2025)
- ML17345A701 + (16:34:46, 7 January 2025)
- 05000250/LER-1989-009, :on 890519,design Inadequacy in App R Safe Shutdown Analysis Identified by Util Engineers.Caused by Design Inadequacy.Fire Watches Established for Unit 4 & Will Be Established for Unit 3 + (16:34:48, 7 January 2025)
- ML17345A699 + (16:34:49, 7 January 2025)
- L-89-187, Discusses Integrated Schedule Category a Items,Per 860812 Confirmatory Order.Remaining Items to Be Performed Include, Air Start Motor Upgrade & Select Sys Walkdown Nonconformance Repts on P&Ids + (16:34:50, 7 January 2025)
- IR 05000250/1989013 + (16:34:53, 7 January 2025)
- ML17345A693 + (16:34:54, 7 January 2025)
- ML17345A691 + (16:35:02, 7 January 2025)
- L-89-175, Responds to Violations Noted in Insp Repts 50-250/89-07 & 50-251/89-07.Corrective Actions:Engineering Evaluation Conducted to Evaluate Acceptability of Ring Settings for Pressurizer Safety Valves.Ring Settings Acceptable + (16:35:03, 7 January 2025)
- ML17345A689 + (16:35:05, 7 January 2025)
- ML17345A687 + (16:35:07, 7 January 2025)
- 05000251/LER-1989-002-02, :on 890412,train a Safeguards Actuation Occurred.Caused by Reactor Control Operator Not Providing Sufficient Instructions to Prevent Safety Sys Actuations. Instruction Added to Std Clearance + (16:35:09, 7 January 2025)
- L-89-181, Monthly Operating Repts for Apr 1989 for Turkey Point Units 1 & 2 & St Lucie Units 1 & 2 + (16:35:10, 7 January 2025)
- ML17345A678 + (16:35:13, 7 January 2025)
- ML17345A677 + (16:35:15, 7 January 2025)
- ML17345A676 + (16:35:16, 7 January 2025)
- ML17345A675 + (16:35:18, 7 January 2025)
- ML17345A673 + (16:35:19, 7 January 2025)
- ML17345A672 + (16:35:20, 7 January 2025)
- IR 05000250/1989019 + (16:35:22, 7 January 2025)
- ML17345A669 + (16:35:24, 7 January 2025)
- ML17345A668 + (16:35:25, 7 January 2025)
- 05000250/LER-1988-027, :on 881006,mechanic Found to Be Contaminated When Exiting Containment Bldg.Specific Cause Unidentified. Addl Temporary Controls Implemented & Area Mopped + (16:35:27, 7 January 2025)
- L-89-178, Responds to Violations Noted in Insp Repts 50-250/88-32 & 50-251/88-32.Corrective Actions:Valves Relabeled W/More Durable Permanent Tags.Planning Supervisors Instructed Not to Code Out Plant Work Orders If No Work Performed + (16:35:28, 7 January 2025)
- ML17345A663 + (16:35:31, 7 January 2025)
- L-89-176, Responds to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. NDE of Unit 4 Identified No Crack Indications.Nde of Unit 3 Will Be Completed During Cycle 12 Refueling,Currently Scheduled to Begin in Nov 1989 + (16:35:32, 7 January 2025)
- ML17345A658 + (16:35:36, 7 January 2025)
- ML17345A657 + (16:35:44, 7 January 2025)
- ML17345A656 + (16:35:45, 7 January 2025)
- ML17345A654 + (16:35:47, 7 January 2025)
- ML17345A651 + (16:35:47, 7 January 2025)
- ML17345A649 + (16:35:51, 7 January 2025)
- ML17345A647 + (16:35:53, 7 January 2025)
- L-89-143, Forwards Integrated Schedule Monthly Summary Rept for Mar 1989 + (16:35:54, 7 January 2025)
- L-89-153, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/89-06 & 50-251/89-06.Corrective Actions:Procedure OP 14004.1 Revised to Correct Applicable Step Numbers & Util Analyzing Clearance Order Process + (16:35:57, 7 January 2025)
- ML17345A643 + (16:36:00, 7 January 2025)
- 05000250/LER-1989-008, :on 890320,heat Trace Circuits 8A & 8B on Suction Lines of Boric Acid Transfer Pump Declared Out of Svc.Possibly Caused by Leaking Isolation Valve.Isolation Valve Disassembled for Insp + (16:36:02, 7 January 2025)
- SBK-L-17204, Response to Request for Additional Information Regarding License Amendment Request Related to Alkali-Silica Reaction (CAC No. MF8260; EPID L-2016-LLA-0007) + (16:36:05, 7 January 2025)
- L-89-141, Forwards Mar 1989 Progress Summary of Select Sys Assessment, Per NRC 860812 Order + (16:36:07, 7 January 2025)
- L-89-154, Special Rept:On 890312,16 & 27 Fire Protection Impairments Opened for Repairs & Not Returned to Functional Status within 7 Days,Per Tech Spec 3.14.5.b.Discrepancies Identified by Fire Door Surveillance Being Evaluated + (16:36:10, 7 January 2025)
- L-89-161, Special Rept:On 890322,condenser Air Ejector High Range Noble Gas Monitor Removed from Svc in Order to Performed Maint & Became Inoperable for Greater than 7 Days.Monitor Scheduled to Be Returned to Svc Prior to Restart of Unit + (16:36:12, 7 January 2025)