Ack Receipt of Util Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/88-32 & 50-251/88-32
ML17345A725
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/07/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8906190164
Download: ML17345A725 (2)


See also: IR 05000250/1988032

Text

AC CELE P>TED

DlS7'K Bt 'TI0%

DE8 04 iTRXT104

SY~Eg

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:8906190164

DOC.DATE: 89/06/07

NOTARIZED: NO

ACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C

50-251 Turkey Point Plant, Unit 4, Florida Power and Light C

AUTH.NAME

AUTHOR AFFILIATION

JULIAN,C.A.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

WOODY,C.O.

Florida Power

6 Light Co.

SUBJECT:

Ack receipt of util 890504 ltr informing NRC of steps

taken

to correct violations noted in IRs 50-250,50-251/88-32.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

~

ENCL P

SIZE

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vi&o ation Response

NOTES:

DOCKET

05000250

05000251

RECIPIENT

ID CODE/NAME

PD2-2

PD

INTERNAL: AEOD

AEOD/TPAD

NRR SHANKMAN,S

NRR/DLPQ/PQEB

NRR/DREP/EPB

10

NRR/PMAS/ILRB12

OE LI-EBg,J

02

ERNAL: LPDR

NSIC

COPIES

LTTR ENCL

RECIPIENT

ID CODE/NAME

EDISON,G

AEOD/DEIIB

DEDRO

NRR/DEST DIR

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NUDOCS-ABSTRACT

OGC/HDS2

RGN2

FILE

01

NRC PDR

COPIES

LTTR ENCL

NOPE 'IO ALL "RIES"

RECIPIENIS'LEASE

HELP US IO RHXKZ WASTE!

CXNI'ACI'IHE EGCUMENI'GVZROL DESK

ROOM Pl-37

(EXT. 20079) K) ELIMINATE KXlR NME PKR DIBTRZE7ZION

LXSTS FOR DOCUMENIS YOU DGNIT NEZDf

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

22

ENCL

Docket Nos. 50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power and Light Company

ATTN:

Mr. C. 0.

Woody, Acting

Senior

Vice President

Nuclear

P. 0.

Box 14000

Juno Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-250/88-32

AND 50-251/88-32

Thank you for your response

of May~ 4,

1989,

to our Notice of Violation issued

on April 4,

1989,

concerning

activities

conducted

at

your

Turkey Point

facility.

We

have

evaluated

your

response

and

found that it meets

the

requirements

of

10 CFR 2.201.

We will examine

the

implementation of your

corrective actions during future inspections.

We appreciate

your cooperation

in this matter.

Sincerely,

original signed

by

Caudle Julian

Caudle

A. Julian, Chief

Engineering

Branch

Division of Reactor Safety

cc:

K. Harris, Vice President

Turkey Point Nuclear Plant

J.

E. Cross,

Plant Manager

Turkey Point Nuclear Plant

L.

W. Bladow, Plant

gA Superintendent

K.

W.

Van Dyne, Regulatory

and Compliance

Supervisor

State of Florida

bcc:

G. E. Edison, Project Manager,

Project

Directorate II-2, Division of Reactor

Projects,

NRR

NRC Resident Inspector

EGjra d:td

Of+ 89

S906i90164

890607

PDR

ADOCK 05000250

9

PDC

ke

0

q(/89

RI I

Cput, 8aM

06/i /89