ENCLOSURE 1
NOTICE OF VIOLATION Florida Power and Light Company Turkey Point Unit 4 Docket No. 50-251 License No.
DPR-41 During the NRC inspection conducted on February 25, 1989 through March 31,
- 1989, a violation of NRC requirements was identified.
The violation involved the failure to meet the requirements of TS 6.8.1.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions",
( 1988),
the violation is listed below:
TS 6.8. 1 requires that written procedures and administrative policies shall be established, implemented and maintained that meet or exceed the requirements and recommendations of Section 5.1 of ANSI N18.7-1972.
ANSI N18.7-1972, Section 5.1.2, specifies that procedures shall be followed.
Operating Procedure 4-0P-047, CVCS-Charging and
- Letdown, requires valve 4-201B to be closed as its normal position.
Contrary to the
- above, on March 9, 1989, valve 4-2018 was found open, allowing reactor coolant system water to drain to the containment sump during reactor coolant system fill and vent.
This 'is' Severity Level IV Violation (Unit 4 only).
Pursuant to the provisions of 10 CFR 2.201, Florida Power and Light Company is hereby required
'to submit to this Office, within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply including:
( 1) Admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results
- achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.
Mhere good cause is shown, consideration will be given to extending the response time.
FOR THE NUCLEAR REGULATORY COMMISSION g~
A Reactor Projects Branch 2
Division of Reactor Projects Dated at Atlanta, Georgia this 26 day of April 1989 PDR 8905100043 89042 ADOCK 05000250 PDC