UNITED STATES t NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 May 12, 1989 Docket Nos.
50-250 and 50-251 Mr. C. 0. Woo+, Acting Senior Vice President-Nuclear Nuclear Energy Department Florida Power and Light Company P.O.
Box 14000 Juno Beach, Florida 33408-0420
Dear Mr.'oo@:
SUBJECT:
FINAL DRAFT - REVISED TECHNICAL SPECIFICATIONS TURKEY POINT UNITS 3 AND 4 (TAC NOS. 63038,
- 63039, 65816 AND 65817)
The purpose of this letter is to transmit the remaining sections of the Final Draft of the Revised Technical Specifications (RTS) for Turkey Point Units 3 and 4, along with a number of individual page changes to our previous transmit-tal dated March 14, 1989.
The enclosure includes Sections 3/4.4.9 and B 3/4.4.9 related to Pressure/
Temperature Limits, which were omitted from the March 14, 1989 document.
The enclosure also includes Sections 3/4.8 and B 3/4.8 related to Electrical Power Systems.
The latter sections have resulted from the NRC staff review of your submittal dated November 28, 1986 as revised December 20, 1988 and January 24, 1989.
Please note that there are a number of deviations from Standard Technical Specifications (STS) in Section 3/4.8 that we have found acceptable on an interim
- basis, but which we will reconsider at a later date, as described below.
A major revision to Sections 3/4.8 and B 3/4.8 will be required upon completion of the Emergency Power Enhancement Program (EPEP) in which two new diesel generators, as well as many related modifications, are being added.
Your TS submittal at that time should be based on STS and should take the form of a markup of the Proof and Review version of STS.
We do not consider the licensed TS which will exist at that time to be a proper starting point for incorporating TS revisions resulting from the EPEP.
We believe there are additional improve-
=ments in Sections 3/4.8 and B 3/4.8 that can be made in the spirit of conversion to STS without incurring plant-specific operating hardships or equipment modifi-
- cations, and we plan to address them in our review of your TS submittal associated with the EPEP.
The enclosure to this letter should be incorporated into the Final Draft of the RTS that was provided to you on March 14, 1989 for review and certification.
The instructions in our letter of March 14, 1989 similarly apply to this enclosure.
As agreed with your staff, your review and certification of the RTS is expected about June 8, 1989.
89052202i5 8905<2 PDR ADOCI( 05000250 P
PDC Pi,
Mr. C. 0.
Woo@
May 12, 1989 Finally, we note that the conversion of the electrical TS has now come apace with the conversion of the rest of the TS, and it is time to merge the electrical TS into the overall RTS.
Accordingly, with this letter we are closing TACs 65816 and 65817 for the electrical TS.
Future correspondence on the conversion of electrical TS to STS should reference TACs 63038 and 63039.
Sincer ely, Original signed by
Enclosure:
As stated cc w/enclosure:
See next page Gordon E. Edison, Sr. Project Manager Project Directorate I I-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation DISTRIBUTION NRC II Local PDRs PDII-2 Rdg. File SVarga, 14/E/4, w/o enclosure
- GLainas, 14/H/3, w/o enclosure HBerkow GEdison DMi 11 er OGC (for info. only)
- EJordon, MNBB-3302, w/o enclosure BGrimes 9/A/2, w/o enclosure ACRS(10 CRoon, 11/F/23, w/o enclosure CHoxie, ll/F/23, w/o enclosure JCalvo, 11/F/23, w/o enclosure REmch, 11/F/23, w/o enclosure BWilson, RII PFrederickson, RII AToalston, 8/D/19, w/o enclosure JKnight, 8/D/19, w/o enclosure
- FRosa, 8/D/19, v(/o enclosure
[TAC 63038/39, 66816/17]
PQ, LA:PDI I-2 PM: PDI I-2 DMi1 ler 4
GEdi son:bd 05/)gJ89 05/(~9 SL 05//W89 gf~~
D:PDII-2 HBer kow 05/I+89
a if 'r.
a
~P Mr a
M II M
}
It I
'M I
M ft I,I I ltt I
a, I
s 1
~
n
,M }f a
M t
P M
I M ~
M M
a
, }
Mr
I V
S
~
I P
la
'I M I!
ta P
t II V
I
}
c
'M,~i!
r m
%Ma M
a", ~
a ta
l n
Mr. C. 0.
Woody Florida Power and Light Company Turkey Point Plant CC:
Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center
- Miami, F 1ori da 33131-2398 Mr. K.
N. Harris, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Resident Inspector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Office Box 57-1185 Miami, F lorida 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Ta1 lahassee, F 1ori da 32399-0700 Intergovernmental Coordinati on and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tal lahassee, F lorida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Ta1 1ahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida
-32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102