Text
. ACCELERATED
X)IFTRIBUTION 'KMONSTRXTIO'.i '. SYSTEM, " '."
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION,NBR:8906050081
DOC.DATE: 89/05/08
NOTARIZED:
NO
DOCKET I
FACIL:QO-250 Turkey Point Plant, Unit 3, Florida Power
and Light C
05000250
50-251 Turkey Point Plant, Unit 4, Florida Power
and Light C
05000251
~
~
~
~
~
AUTH.NAME
AUTHOR AFFILIATION
CLINE,W.E.
Region
2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
CONWAY,W.F.
Florida Power
s Light Co.
SUBJECT:
Forwards
Insp Repts
50-250/89-15
& 50-251/89-15
on 890327-29
No violations noted.
D1STRIBUTION CODE:
IE02D
COPIES
RECEIVED:LTR
ENCL
t
SIZE:
TITLE: Safeguards
Inspection
Rpt/NOV Response
(50 DKT)-Contains
SGI or 2.790
1
NOTES:
RECIPIENT
ID CODE/NAME
PD2-2
LA
EDISON,G
COPIES
LTTR ENCL
1
0
1
0
RECIPIENT
ID CODE/NAME
PD2-2
COPIES
LTTR ENCL
1
0
INTERNAL: AEOD/DEIIB
NRR/DRIS
B 9D
F LE
02
1
0
1
1
1
1
NRR/DLPQ/PEB
10
1
1
NUDOCS-ABSTRACT
'1
0
RGN2
FILE
01
1
1
EXTERNAL: LPDR
1
0
1
0
NRC
1
0
NVZE ZO ALL.'KIDS" R1XZPIEÃZS:
PIZASE HELP US M REDOCE HASTE.', CONTACT 'IHE DOCXMKZ CGÃIBOL DESK,
RXN Pl-37
(EXT. 20079)
%0 EIiQGZAXH KKR TAHE FBCH DIST1GBUTICH
LI8IS KR DOCUMENIS YOU DGN~T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
12
ENCL
4
h'tiTERIAL 'iRP Ns'"'~"Eo H"R
CC'NTAltHAT!oi'r
Docket Nos.
50-250,
50-251
License
Nos.
Florida Power
and Light Company
ATTN:
Mr.
W.
F.
Conway
Senior Vice President
Nuclear
P.
0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC INSPECTION
REPORT
NOS. 50-250/89-15
AND 50-251/89-15
0
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
G.
A. Todd
on
March 27-29,
1989.
The
inspection
included
a
review of
activities authorized for your Turkey Point facility.
At the conclusion of the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
Inspection
Report.
'reas
examined
during
the
inspection
are
identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Within the
scope of the inspection,
no violations or deviations
were identified.
In accordance
with 10
CFR 2.790(d)
and
safeguards
activities
and
security measures
are
exempt from public disclosure.
Therefore,
the enclosure
to this letter with the exception
of the report cover page,
which presents
a
nonexempt
summary, will not be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
890605008i
5000250
Bc)0508
POOCH
pgU
8
OQtQtQN.g~~ ~
WfLNME. CUNE
William E. Cline, Chief
Nuclear Materials Safety
and
Safeguards
Branch
Division of Radiation Safety
and Safeguards
Encl osur e:
NRC Inspection
Report
cc w/encl:
(See
page
2)
COI,TA)NS 7~
ED HEREWITH
MATERIAL TRAIiISMITT
99 tl'JFQRf,IATIQg
Fl.ori da
Power and Light Company
cc w/encl
J.
S.
Odom, Vice President
Turkey Point Nucl ear
Plant
J .
E. Cross,
Plant Manager
Turkey Point Nucl ear Plant
L .
W. Bl adow, Plant
gA Superintendent
J . Arias, Jr.,
Regulatory
and Compliance
Supervi sor
State of Florida
bcc w/encl
G.
E. Edison, Project Manager,
Project
Directorate
I I-2, Divi s ion of Reactor
Projects,
NRC
Res ident Inspector
DRS Technical Assistant
Document Control
Desk
(RG02),
42-P
RI I
)1q
GTod: tj
05/0 /89
W) I~
EMcA1 ine
05/I( /89
R
MATERIALTRf'4Sh" iTTCD HEREWITH
COIiITAINS2.790 IIiFORAIATION>