Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18038B824 + (05:43:07, 7 January 2025)
- ML18038B823 + (05:43:08, 7 January 2025)
- ML18038B822 + (05:43:13, 7 January 2025)
- ML18038B821 + (05:43:15, 7 January 2025)
- ML18038B818 + (05:43:16, 7 January 2025)
- IR 05000259/1996012 + (05:43:18, 7 January 2025)
- ML18038B816 + (05:43:19, 7 January 2025)
- ML18038B815 + (05:43:21, 7 January 2025)
- ML18038B814 + (05:43:23, 7 January 2025)
- ML18038B812 + (05:43:24, 7 January 2025)
- ML18038B811 + (05:43:25, 7 January 2025)
- ML18038B809 + (05:43:26, 7 January 2025)
- ML18038B808 + (05:43:27, 7 January 2025)
- 05000296/LER-1996-008-03, :on 961217,loss of ECCS Division II Instrumentation Caused ECCS Equipment to Be Inoperable. Replaced Cleared Fuse & Shorted SCR + (05:43:32, 7 January 2025)
- 05000296/LER-1996-008, Forwards LER 96-008,providing Details Concerning Loss of Instrumentation Input Logic for Plants Division II ECCS Due to Cleared Fuse & Shorted Silicon Controlled Rectifier in Atu Inverter + (05:43:36, 7 January 2025)
- 05000296/LER-1996-007-04, On 961213,engineered Safety Feature Actuations Resulting from Inadequate Planning of step-text Work Order Occurred.Tripped Breaker Reset & LCO Condition Exited + (05:43:39, 7 January 2025)
- 05000296/LER-1996-007, Forwards LER 96-007-00 Re Unplanned Esf.Caused by Inadequate Planning of step-text Work Order That Did Not Fully Isolate Circuit Prior to Adding External Power Supply + (05:43:43, 7 January 2025)
- ML18038B801 + (05:43:46, 7 January 2025)
- ML18038B800 + (05:43:48, 7 January 2025)
- ML18038B798 + (05:43:49, 7 January 2025)
- IR 05000259/1996010 + (05:43:51, 7 January 2025)
- ML18038B796 + (05:43:52, 7 January 2025)
- ML18038B795 + (05:44:00, 7 January 2025)
- 05000296/LER-1996-006-03, :on 961106,loss of ECCS Div 1 Instrumentation Rendered ECCS Equipment Inoperable.Caused by Cleared Fuse in ECCS Div.Fuse Replaced & Addl Testing to Challenge Replacement Fuse Performed + (05:44:02, 7 January 2025)
- 05000260/LER-1996-008-02, :on 961101,MS SR Valves Exceeded TS Required Setpoint Limit as Result of Disc/Seat Bonding.Caused by Corrosion Bonding of SRV Pilot Interface.Replaced All Thirteen Ms SR Valve Pilot Cartridges + (05:44:10, 7 January 2025)
- 05000260/LER-1996-007-02, :on 961029,Unit 2 Scram on Turbine Control Valve Fast Closure Occurred Due to Loss of Excitation to Main Generator.Exciter Brushes Inspected & Replaced & Procedures Revised + (05:44:15, 7 January 2025)
- ML18038B789 + (05:44:17, 7 January 2025)
- ML18038B788 + (05:44:18, 7 January 2025)
- ML18038B786 + (05:44:19, 7 January 2025)
- ML18038B785 + (05:44:21, 7 January 2025)
- ML18038B784 + (05:44:22, 7 January 2025)
- ML18038B781 + (05:44:24, 7 January 2025)
- ML18038B782 + (05:44:24, 7 January 2025)
- ML18038B779 + (05:44:25, 7 January 2025)
- PNO-II-96-076, on 961031,Unit 2 Placed in Cold Shutdown Mode. Licensee Removing Four of SRVs to Be Sent Off Site for Setpoint Testing.Restart Date Will Be Determined Based on Evaluation of Test Results + (05:44:28, 7 January 2025)
- ML18038B777 + (05:44:29, 7 January 2025)
- 05000296/LER-1996-005-03, :on 960915,reactor Scrammed as Required by TSs Due to Trip of Reactor Recirculation Motor Generator Set 3A. Caused by Bus Bar in Generator Armature Circuit Failing. Collector Rings Were Replaced + (05:44:32, 7 January 2025)
- ML18038B772 + (05:44:34, 7 January 2025)
- IR 05000259/1996011 + (05:44:35, 7 January 2025)
- ML18038B769 + (05:44:38, 7 January 2025)
- 05000296/LER-1996-004-01, Forwards LER 96-004-01,clarifying Analysis of Event Section Which Div I & II ECCS Equipment Remained Operable for Automatic Initiation + (05:44:41, 7 January 2025)
- 05000260/LER-1994-010, :on 941005,loss of ECCS Division II Instrumentation Resulting from Blown Fuse in Atu Inverter. Caused by a Failed Capacitor.Blown DC Input Fuse Was Replaced + (05:44:43, 7 January 2025)
- 05000260/LER-1994-010-01, Forwards LER 94-010-01,clarifying Analysis of Event Section Which Division I & Division II ECCS Equipment Remained Operable for Automatic Initiation + (05:44:46, 7 January 2025)
- IR 05000259/1996006 + (05:44:47, 7 January 2025)
- IR 05000259/1996008 + (05:44:58, 7 January 2025)
- ML18038B759 + (05:45:07, 7 January 2025)
- IR 05000259/1996005 + (05:45:08, 7 January 2025)
- ML18038B757 + (05:45:10, 7 January 2025)
- ML18038B755 + (05:45:13, 7 January 2025)
- ML18038B754 + (05:45:13, 7 January 2025)
- ML18038B751 + (05:45:15, 7 January 2025)