Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000220/LER-1986-007, :on 860415,during Refueling Outage Acurex Fuel Zone Level Indication Instrumentation Found Inaccurate by 15 to 20 Inches in Nonconservative Direction.Ge to Correct Software & Acurex Instrumentation Recalibr + (20:00:39, 7 December 2024)
- ML20205P551 + (20:00:40, 7 December 2024)
- ML20205P549 + (20:00:41, 7 December 2024)
- ML20205P550 + (20:00:41, 7 December 2024)
- JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With + (20:00:42, 7 December 2024)
- ML20205P548 + (20:00:42, 7 December 2024)
- ML20205P546 + (20:00:44, 7 December 2024)
- 05000304/LER-1988-007-11, :on 881008,operators Received Urgent Failure Alarm from Rod Control Circuitry & Found Blown Fuse Indicator Popped.Caused by Procedural Deficiency.Components to Be Analyzed & Procedures Revised.W/Undated Ltr + (20:00:46, 7 December 2024)
- ML20205P544 + (20:00:47, 7 December 2024)
- ML20205P543 + (20:00:47, 7 December 2024)
- ML20205P540 + (20:00:50, 7 December 2024)
- ML20205P539 + (20:00:51, 7 December 2024)
- ML20205P538 + (20:00:52, 7 December 2024)
- ML20205P537 + (20:00:52, 7 December 2024)
- AECM-88-0208, Responds to NRC Re Violations Noted in Insp Rept 50-416/88-19.Corrective Actions:Training Sessions Held & Caution Labels Installed on Power Panels Feeding Isolation Valves + (20:00:53, 7 December 2024)
- ML20205P536 + (20:00:53, 7 December 2024)
- IR 05000424/1986028 + (20:00:54, 7 December 2024)
- ML20205P529 + (20:00:55, 7 December 2024)
- IR 05000321/1987005 + (20:00:56, 7 December 2024)
- ML20205P525 + (20:00:56, 7 December 2024)
- ML20205P524 + (20:00:57, 7 December 2024)
- ML20205P522 + (20:00:59, 7 December 2024)
- ML20205P523 + (20:00:59, 7 December 2024)
- ML20205P519 + (20:01:00, 7 December 2024)
- ML20205P521 + (20:01:00, 7 December 2024)
- ML20205P517 + (20:01:01, 7 December 2024)
- L-99-055, Forwards Disk Containing Annual Exposure Rept for 1998. Attachment 1 Is Description of File Structure of Transmitted Data.Without Disk + (20:01:02, 7 December 2024)
- ML20205P515 + (20:01:02, 7 December 2024)
- AECM-88-0211, Forwards Updated Svc List for Util Correspondence & Requests That WT Cottle Be Primary Addressee + (20:01:03, 7 December 2024)
- ML20205P512 + (20:01:04, 7 December 2024)
- ML20205P509 + (20:01:04, 7 December 2024)
- ML20205P508 + (20:01:05, 7 December 2024)
- ML20205P505 + (20:01:07, 7 December 2024)
- 05000336/LER-1986-002-01, :on 860417,C-E Investigation Determined That Acceptance Criteria Nonconservative for Meeting RCS Flow Limiting Condition for Operation.Caused by Procedural Inadequacy.Procedural Change Made + (20:01:10, 7 December 2024)
- ML20205P503 + (20:01:11, 7 December 2024)
- NLS8800476, Application for Amend to License DPR-46,deleting 1,000 Psig Pressure Permissive from MSIV Closure Scram Trip Setting & Making Miscellaneous Editorial Corrections.Fee Paid + (20:01:12, 7 December 2024)
- ML20205P497 + (20:01:14, 7 December 2024)
- ML20205P498 + (20:01:14, 7 December 2024)
- ML20205P496 + (20:01:15, 7 December 2024)
- ML20205P495 + (20:01:16, 7 December 2024)
- ML20205P494 + (20:01:16, 7 December 2024)
- ML20205P493 + (20:01:17, 7 December 2024)
- ML20205P492 + (20:01:17, 7 December 2024)
- 05000354/LER-1986-005-01, :on 860416,during Fuel Load,Discovered Filtration,Recirculation,Ventilation Sys Inoperable.Caused by Personnel Error.Review of Addl Training Requirements Initiated + (20:01:19, 7 December 2024)
- ML20205P490 + (20:01:20, 7 December 2024)
- ML20205P488 + (20:01:24, 7 December 2024)
- ML20205P487 + (20:01:25, 7 December 2024)
- ML20205P484 + (20:02:48, 7 December 2024)
- ML20205P483 + (20:02:50, 7 December 2024)
- ML20205P481 + (20:02:52, 7 December 2024)
- ML20205P480 + (20:02:52, 7 December 2024)
- ML20205P476 + (20:02:55, 7 December 2024)