Forwards Crdr Summary Rept, Rev 1 to Crdr Program Plan & Sections I & II of Human Engineering Discrepancy Forms,Per Suppl 1 to NUREG-0737 & Commission 840702 Order
ML20205P512
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/31/1987
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Lear G
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20205P518 List:
References
CON-NRC-87-34, RTR-NUREG-0737, RTR-NUREG-737 VPNPD-87-133, NUDOCS 8704030298
Download: ML20205P512 (4)


Text

O WNSCORSin Electnc eomcoune 231 W. MICHIG AN, P.O. BOX 2046, MILWAUKEE, Wl 53201 (414)277-2345 VPNPD-87-133 NRC-87-34 March 31, 1987 Document Control Desk U.

S.

NUCLEAR REGULATORY COMMISSION Washington, D.

C.

20555 Attention:

Mr. George Lear, Director PWR Project Directorate No. 1 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 TRANSMITTAL OF THE CONTROL ROOM DESIGN REVIEW

SUMMARY

REPORT POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed for your review is a copy of the Point Beach Nuclear Plant (PBNP) Control Room Design Review (CRDR) Summary Report.

Also enclosed are copies of the PBNP CRDR Program Plan, Revision 1, and Sections I and II of the Human Engineering Discrepancy (HED) forms.

Transmittal of these. documents is in fulfillment of the requirements of Supplement 1 to NUREG-0737 to perform a detailed CRDR and Item 2.b of Commission Order dated July 2, 1984 (as modified by NRC letter to Wisconsin Electric dated March 21, 1986) to submit a Summary Report by March 31, 1987.

Should you have any questions concerning the enclosed material, please let us know.

Very truly yours, (f

$5df C. W.

Fay Vice President Nuclear Power I

)

U Enclosures Copy to NRC Regional Administrator, Region III NRC Resident Inspector b

g%

8704030298 G70331 PDR ADOCK 05000266 p

PDR

\\

']

{O Wisconsin Electnc eom coww 231 W. MICHIGAN.P.O. BOX 2046. MILWAUKEE,WI S3201 (414)277-2345 VPNPD-87-133 NRC-87-34 March 31, 1987 Document Control Desk U.

S.

NUCLEAR REGULATORY COMMISSION Washington, D.

C.

20555 Attention:

Mr. George Lear, Director PWR Project Directorate No. 1 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 TRANSMITTAL OF THE CONTROL ROOM DESIGN REVIEW

SUMMARY

REPORT POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 cQ h

)

Enclosed for your review is a copy of the Point Beach Nuc' lear Plant (PBNP) Control Room Design Review (CRDR) Summary Report.

Also enclosed are copies of the PBNP CRDR Program Plan, Revision 1, and Sections I and II of the Human Engineering Discrepancy (HED) forms.

Transmittal of these documents is in fulfillment of the requirements of Supplement 1 to NUREG-0737 to perform a detailed CRDR and Item 2.b of Commission Order dated July 2, 1984 (as modified by NRC letter to Wisconsin Electric dated March 21, 1986) to submit a Summary Report by March 31, 1987.

Should you have any questions concerning the enclosed material, please let us know.

Very truly yours,

(/

lG v C.

W. ray Vice President Nuclear Power Enclosures N