Text
O WNSCORSin Electnc eomcoune 231 W. MICHIG AN, P.O. BOX 2046, MILWAUKEE, Wl 53201 (414)277-2345 VPNPD-87-133 NRC-87-34 March 31, 1987 Document Control Desk U.
S.
NUCLEAR REGULATORY COMMISSION Washington, D.
C.
20555 Attention:
Mr. George Lear, Director PWR Project Directorate No. 1 Gentlemen:
DOCKET NOS. 50-266 AND 50-301 TRANSMITTAL OF THE CONTROL ROOM DESIGN REVIEW
SUMMARY
REPORT POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed for your review is a copy of the Point Beach Nuclear Plant (PBNP) Control Room Design Review (CRDR) Summary Report.
Also enclosed are copies of the PBNP CRDR Program Plan, Revision 1, and Sections I and II of the Human Engineering Discrepancy (HED) forms.
Transmittal of these. documents is in fulfillment of the requirements of Supplement 1 to NUREG-0737 to perform a detailed CRDR and Item 2.b of Commission Order dated July 2, 1984 (as modified by NRC letter to Wisconsin Electric dated March 21, 1986) to submit a Summary Report by March 31, 1987.
Should you have any questions concerning the enclosed material, please let us know.
Very truly yours, (f
$5df C. W.
Fay Vice President Nuclear Power I
)
U Enclosures Copy to NRC Regional Administrator, Region III NRC Resident Inspector b
g%
8704030298 G70331 PDR ADOCK 05000266 p
\\
']
{O Wisconsin Electnc eom coww 231 W. MICHIGAN.P.O. BOX 2046. MILWAUKEE,WI S3201 (414)277-2345 VPNPD-87-133 NRC-87-34 March 31, 1987 Document Control Desk U.
S.
NUCLEAR REGULATORY COMMISSION Washington, D.
C.
20555 Attention:
Mr. George Lear, Director PWR Project Directorate No. 1 Gentlemen:
DOCKET NOS. 50-266 AND 50-301 TRANSMITTAL OF THE CONTROL ROOM DESIGN REVIEW
SUMMARY
REPORT POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 cQ h
)
Enclosed for your review is a copy of the Point Beach Nuc' lear Plant (PBNP) Control Room Design Review (CRDR) Summary Report.
Also enclosed are copies of the PBNP CRDR Program Plan, Revision 1, and Sections I and II of the Human Engineering Discrepancy (HED) forms.
Transmittal of these documents is in fulfillment of the requirements of Supplement 1 to NUREG-0737 to perform a detailed CRDR and Item 2.b of Commission Order dated July 2, 1984 (as modified by NRC letter to Wisconsin Electric dated March 21, 1986) to submit a Summary Report by March 31, 1987.
Should you have any questions concerning the enclosed material, please let us know.
Very truly yours,
(/
lG v C.
W. ray Vice President Nuclear Power Enclosures N
Copy to NRC Regional Administrator, Region III NRC Resident Inspector s