Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000255/1990022 + (13:52:21, 6 January 2025)
- ML18057A787 + (13:52:23, 6 January 2025)
- ML18057A784 + (13:52:24, 6 January 2025)
- ML18057A783 + (13:52:25, 6 January 2025)
- ML18057A781 + (13:52:26, 6 January 2025)
- TAC:79444 + (13:52:27, 6 January 2025)
- ML18057A779 + (13:52:28, 6 January 2025)
- 05000255/LER-1990-001-02, :on 900109,reactor Manually Tripped Following Loss of Main Feedwater Flow.Cause Not Conclusively Determined.Moisture Separator & Reheater Relief Valves Replaced.W/Undated Ltr + (13:52:31, 6 January 2025)
- ML18057A774 + (13:52:32, 6 January 2025)
- ML18057A772 + (13:52:33, 6 January 2025)
- TAC:74037 + (13:52:33, 6 January 2025)
- IR 05000255/1991004 + (13:52:36, 6 January 2025)
- ML18057A769 + (13:52:38, 6 January 2025)
- ML18057A768 + (13:52:44, 6 January 2025)
- ML18057A767 + (13:52:45, 6 January 2025)
- ML18057A766 + (13:52:46, 6 January 2025)
- ML18057A765 + (13:52:47, 6 January 2025)
- 05000255/LER-1991-001, Application for Amend to License DPR-20,changing Tech Specs to Clarify Operating Requirements for Instrumentation & Control Sys & Instrument Accuracy Re wide-range Channel to Resolve Inconsistencies in LER 91-001 + (13:52:50, 6 January 2025)
- ML18057A762 + (13:52:52, 6 January 2025)
- ML18057A761 + (13:52:52, 6 January 2025)
- ML18057A758 + (13:52:54, 6 January 2025)
- 05000255/LER-1991-005, :on 910125,when Technicians Removed Power from Radiation Monitor RIA-1805,monitor Deenergized,Causing Left Channel Containment Isolation.Caused by Inappropriate Work Instructions.Drawings Changed + (13:52:55, 6 January 2025)
- ML18057A756 + (13:52:56, 6 January 2025)
- ML18057A755 + (13:52:57, 6 January 2025)
- 05000255/LER-1990-018, :on 900930,flow Rates for Each of Two Primary Coolant Sys Hot Legs Less than Acceptance Criteria of 250 Gpm.Caused by Short Disk Guides & Inefficient Drainage.Hot Leg Check Valves Replaced + (13:52:59, 6 January 2025)
- ML18057A752 + (13:53:00, 6 January 2025)
- ML18057A749 + (13:53:01, 6 January 2025)
- 05000255/LER-1991-004, :on 910105,containment Airlock Leakage Resulted in Excessive Leak Rate During Testing.Caused by Lack of Preventive Maint Procedures.Viewing Port Disassembled & Gasket Replaced + (13:53:02, 6 January 2025)
- ML18057A740 + (13:53:03, 6 January 2025)
- ML18057A735 + (13:53:03, 6 January 2025)
- ML18057A734 + (13:53:05, 6 January 2025)
- IR 05000255/1991002 + (13:53:06, 6 January 2025)
- ML18057A731 + (13:53:08, 6 January 2025)
- 05000255/LER-1991-003, :on 901219,determined That on 900520 & 0617 Emergency Diesel Generators Auto Start Initiating Circuits Had Not Been Tested Prior to start-up.Caused by Procedural Inadequacy.Tech Spec Test Procedures Developed + (13:53:09, 6 January 2025)
- 05000255/LER-1991-002, :on 901228,cable Splice on Containment Penetration Connector Inside Containment for Reactor Head Vent Valve Improperly Installed.Caused by Inadequate Mod or Design Control.Splices Reworked + (13:53:10, 6 January 2025)
- ML18057A725 + (13:53:12, 6 January 2025)
- ML18057A724 + (13:53:13, 6 January 2025)
- ML18057A723 + (13:53:14, 6 January 2025)
- IR 05000255/1990039 + (13:53:19, 6 January 2025)
- ML18057A715 + (13:53:21, 6 January 2025)
- ML18057A712 + (13:53:22, 6 January 2025)
- ML18057A714 + (13:53:22, 6 January 2025)
- ML18057A711 + (13:53:23, 6 January 2025)
- ML18057A710 + (13:53:24, 6 January 2025)
- TAC:76436 + (13:53:25, 6 January 2025)
- ML18057A708 + (13:53:26, 6 January 2025)
- ML18057A705 + (13:53:27, 6 January 2025)
- ML18057A701 + (13:53:27, 6 January 2025)
- ML18057A693 + (13:53:28, 6 January 2025)
- ML18057A689 + (13:53:29, 6 January 2025)
- ML18057A688 + (13:53:30, 6 January 2025)