ML18057A783

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1991 for Palisades Nuclear Plant
ML18057A783
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/28/1991
From: Handlovits S, Mlynarek M
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9103140124
Download: ML18057A783 (5)


Text

consumers Power POWERING MICHIGAN"S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 March 5, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of February 1991.

If you have any questions or concerns please feel free to contact me at (616) 764-8913, extension 0113.

Sincerely,

-w1CV"1 ~

MG Mlynarek Reactor Engineer CC:

DPHoffman, P26-117B TABuczwinski, Palisades ABDavis, USNRC JLKuemin, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades HRSnider, P21-129 Administrator, USNRC Document Control, 950*22*35*10/L File SMH91*005 A CMS ENERGY COMPANY

OPERATING DATA REPORT OPERATING STATUS:

1.

UNIT NAME Palisades

2.

REPORTING PERIOD:

910201-910228

3.

LICENSED THERMAL POWER (MWt) 2530.0

4.

NAMEPLATE RATING (GROSS MWe) 811.7

5.

DESIGN ELECTRICAL RATING (NET MWe) 805.D

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

    • 770
7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

    • 730
8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3-7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER DF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH)
17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE This Month 672.0 a.a 0.0 a.a a.a 0.0 0.0%

0.0%

0.0%

0.0%

0.0%

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

Refueling/Steam Generator Replacement Outage started September 15, 1990.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: March 14, 1991
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

DOCKET NO 5D-255 DATE 02-28-91 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 NOTES:

Yr-to-Date Cumulative 1416.0 168279.0 O.D 90201.1 a.a 86217.6 0.0 180752445.0 a.a 56636535.0 a.a 53298123.0 0.0%

51.2%

0.0%

51.2%

0.0%

48.1%*

0.0%

39.3%

0.0%

32.8%

Forecast Achieved

MONTH FEBRUARY 1991 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO -----=--'50~-=2 5~5 UNIT Palisades DATE __

0_3~/0_5~/9~1 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net)

1.

0

17.

0

2.

0

18.

0

3.

0

19.

0

4.

0

20.

0

5.

0

21.

0

6.

0

22.

0

7.

0

23.

0

8.

0

24.

0

9.

0

25.

0

10.

0

26.

0

11.

0

27.

0

12.

0

28.

0

13.

0

14.

0

15.

0

16.

0 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

REPORT MONTH FEBRUARY 1991 No.

Date Type 1 01 900915 s

1.
2.

F:

Forced S:

Scheduled Duration Reason2 (Hours) 672.0 B&C Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #

N/A

3.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

System Component Code4 Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Cause & Corrective Action to Prevent Recurrence N/A

5.

DOCKET NO UNIT DATE COMPLETED BY TELEPHONE Exhibit I - Same Source 50-255 Palisades 03/05/91 SMHandlovits (616)764-8913 e

\\,l:/

I

SUMMARY

OF OPERATING EXPERIENCE FOR FEBRUARY 1991 The Plant remained shutdown for steam generator replacement and refueling during the entire month of February.