ML18057A688

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1990 for Palisades Nuclear Plant
ML18057A688
Person / Time
Site: Palisades 
Issue date: 12/31/1990
From: Handlovits S, Mlynarek M
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9101100159
Download: ML18057A688 (5)


Text

r

~,

-. ;,,A.*

consumers Power POW ERi Nii M.ICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 January 2, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of December 1990.

If you have any questions or concerns please feel free to contact me at (616) 764-8913, extension 0113.

Sincerely, MG Mlynarek Reactor Engineer CC:

DPHoffman, P26-117B TABuczwinski, Palisades ABDavis, USNRC JLKuemin, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades HRSnider, P21-129 Administrator, USNRC Document Control, 950*22*35*10/L File SMH91*001 r----: --

-""'-*---*=-.. ----..

--~----....

. 910110015~' 9012:-=:1 __..

PDR ADOCK.. 0500(>255.

R PDR 10000~

A CMS ENERGY COMPANY

\\

0

.J

  • OPERATING STATUS:
1.

UN IT NAME

2.

REPORTING PERIOD:

OPERATING DATA REPORT Palisades 901201-901231

3.

LICENSED THERMAL POWER (MWt) 2530.0

4.

NAMEPLATE RATING (GROSS MWe) 811.7

5.

DESIGN ELECTRICAL RATING (NET MWe) 805.0

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

    • 770
7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

    • 730
8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3-7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH)
17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0%

0.0%

0.0%

0.0%

0.0%

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

Refueling/Steam Generator Replacement Outage started September 15, 1990.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: March 6, 1991
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

DOCKET NO 50-255 DATE 12-31-90 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 NOTES:

Yr-to-Date Cumulative 8760.0 166863.0 5143.l 90201.1 5075.2 86217.6 10137072.0 180752445.0 3212350.0 56636535.0 3008095.0 53298123.0 57.9%

51. 7%

57.9%

51.7%

47.0%

48.5%*

42. 7%

39.7%

5.4%

32.8%

Forecast Achieved

I~ 1 AVERAGE DAILY UNIT POWER LEVEL MONTH DECEMBER 1990 DAY AVERAGE DAILY POWER LEVEL (MWe Net)

1.

0

2.

0

3.

0

4.

0

5.

0

6.

0

7.

0

8.

0

9.

0

10.

0

11.

0

12.

0

13.

0

14.

0

15.

0

16.

0 INSTRUCTIONS:

DAY

17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.

DOCKET NO ___

50_-~25~5 UNIT Palisades DATE ----=Oc..:..l '--'/ 0=2,_,/ 9=--=-1 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

REPORT MONTH DECEMBER 1990 No.

Date Type1 05 900915 s

1.
2.

F:

Forced S:

Scheduled Duration Reason2 (Hours) 744.0 B&C Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refue 1 i ng D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Dther (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #

1 N/A

3.
4.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Dther (Explain)

System Code4 Component Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Cause & Corrective Action to Prevent Recurrence N/A

5.

DOCKET ND UNIT DATE COMPLETED BY TELEPHONE Exhibit I - Same Source 50-255 Palisades 01/02/91 SMHandlovits (616}764-B913

~

SUMMARY

OF OPERATING EXPERIENCE FOR DECEMBER 1990 The Plant remained shutdown for steam generator replacement and refueling during the entire month of December.