Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18079A330 + (11:10:12, 6 January 2025)
- PMNS20180346, Notice of Forthcoming Meeting Between the U.S. Nuclear Regulatory Commission and Honeywell Metropolis Works + (11:10:13, 6 January 2025)
- ML18079A327 + (11:10:13, 6 January 2025)
- ML18079A326 + (11:10:14, 6 January 2025)
- ML18079A324 + (11:10:15, 6 January 2025)
- ML18079A325 + (11:10:15, 6 January 2025)
- ML18079A323 + (11:10:16, 6 January 2025)
- ML18079A322 + (11:10:17, 6 January 2025)
- ML18079A321 + (11:10:18, 6 January 2025)
- ML18079A315 + (11:10:19, 6 January 2025)
- ML18079A314 + (11:10:20, 6 January 2025)
- 05000272/LER-1979-039-03, /03L-0 on 790416:unit Inadvertently Entered Mode 6 When Work Was Begun to Remove Reactor Head.Caused by Maint Supervisor Not Verifying That RCS Had Been Brought Up to Refueling Status + (11:10:21, 6 January 2025)
- 05000272/LER-1979-039, Forwards LER 79-039/03L-0 + (11:10:23, 6 January 2025)
- 05000272/LER-1979-038-03, /03L-0 on 790417:ground Fault on Station Power Transformer 21 Resulted in Loss of Transformers 1,11 & 21. Caused by Failed Cable in Pothead Supplying Transformer. Failed Cable & Pothead Replaced + (11:10:25, 6 January 2025)
- 05000272/LER-1979-038, Forwards LER 79-038/03L-0 + (11:10:26, 6 January 2025)
- ML18079A305 + (11:10:31, 6 January 2025)
- ML18079A304 + (11:10:32, 6 January 2025)
- ML18079A302 + (11:10:33, 6 January 2025)
- ML18079A303 + (11:10:33, 6 January 2025)
- 05000272/LER-1979-037-03, /03L on 790416:source Range Nuclear Instrumentation Channel N-32 Indication Became Erratic. Caused by Disconnected Shield on Source Range High Voltage Drawer Connector.Drawer Connection Reworked + (11:10:34, 6 January 2025)
- 05000272/LER-1979-037, Forwards LER 79-037/03L-0 + (11:10:36, 6 January 2025)
- ML18079A296 + (11:10:38, 6 January 2025)
- ML18079A294 + (11:10:39, 6 January 2025)
- ML18079A292 + (11:10:41, 6 January 2025)
- ML18079A291 + (11:10:43, 6 January 2025)
- ML18079A290 + (11:10:44, 6 January 2025)
- ML18079A288 + (11:10:47, 6 January 2025)
- ML18079A289 + (11:10:47, 6 January 2025)
- ML18079A285 + (11:10:50, 6 January 2025)
- ML18079A286 + (11:10:50, 6 January 2025)
- ML18079A283 + (11:10:52, 6 January 2025)
- ML18079A284 + (11:10:52, 6 January 2025)
- ML18079A282 + (11:10:53, 6 January 2025)
- ML18079A281 + (11:10:55, 6 January 2025)
- ML18079A280 + (11:10:56, 6 January 2025)
- ML18079A279 + (11:10:57, 6 January 2025)
- ML18079A277 + (11:10:58, 6 January 2025)
- ML18079A274 + (11:11:02, 6 January 2025)
- ML18079A273 + (11:11:09, 6 January 2025)
- ML18079A272 + (11:11:11, 6 January 2025)
- ML18079A265 + (11:11:12, 6 January 2025)
- ML18079A264 + (11:11:13, 6 January 2025)
- ML18079A260 + (11:11:15, 6 January 2025)
- ML18079A258 + (11:11:17, 6 January 2025)
- ML18079A257 + (11:11:19, 6 January 2025)
- 05000272/LER-1979-011-01, /01X-2 on 790116:RMS Channel Which Had Alarmed & Cleared Had Been Reset at Control Console But Not at RMS Panel.Caused by Procedure Inadequacy.Procedure Changed Initiated to Clarify Functions + (11:11:22, 6 January 2025)
- 05000272/LER-1979-011, Forwards LER 79-011/01X-2 + (11:11:24, 6 January 2025)
- ML18079A253 + (11:11:25, 6 January 2025)
- ML18079A250 + (11:11:26, 6 January 2025)
- 05000272/LER-1979-034-03, /03L-0 on 790331:Loop 12 Steamline Pressure 100 Psig Less than Loop 11.Caused by Failed Comparator Module. Comparator Calibr & Channel Setpoints Verified + (11:11:27, 6 January 2025)
- ML18079A248 + (11:11:29, 6 January 2025)
- 05000272/LER-1979-034, Forwards LER 79-034/03L-0 + (11:11:30, 6 January 2025)