  • AVERA.GE DAILY UNIT FOWER LEVEL MO NIH April 1979 DAY AVERAGE DAILY POWER LEVEL 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Pg. 2 of 13 8.1-7.Rl (MWe-NET)

-1064 1109 482 0

0 0

0 0

0 0

0

o.

0 0

0 0

OOCKET NO. 50-272 UNIT Salem #1 DATE May 9 I 1979

  • CQ\\ilPLETED BY L. K. Miller TELEPHONE 609-365-7000 DAY AVERAGE DAILY POWER LEVEL (MWE-NET) 17 0

18 0

19 0

20.

0 21 0

22 0

23 0.

24 0

25 0

26 0

27 0

28 0

29 0

30 0

31 X507

i.* Unit Nane: __ s_a_l_e_m_#_l_. ----------

2.

Reporting' Pe..""icd:

Apr i 1 19 7 9

3. Licensed '!hemal Pa.er (Mit} :

3 3 3 8

4.

Nal!ll!Pl.ate Rating (Gmss.!fie) : _..;;1... 1_3_5 _____ _

s.

Design El.ect:rical R.at:inq (Net.!fie) :

1 0 9 0

6.. Maxilmlm Dependable capacity (Gross.!fie) : 112 4
7.

Maxilmlm* Dependable capacity* (Net.!fie) : __...1_0_7._.9..._ __ _

Notes:

~

ro.: __ 5_0_-_2_1_2 ____ _

CM.'E : _...;M""'a""'y-........ 9..1..-...l... g.._7......_g __

COMPIE1E)BY: __ L_._K_._M_i_*1_1_e_r __

TEIEPECNE: __

6_o_9_-__ 3_6_5_-_7_o_o_o __

x 507

8. If Changes Occllr in capacity Ratings (Itens NuirCer* 3 Thz:cugh 7) Since Last Report, Give Reason:

NONE

9.

Power Level. To Which* Restricted, If. Any (Net ?-fie):. ___

N_O_N_E-----~------~----

10.

Reasons For Restric'"..icns,. If Any: ----~O~N~E-=-----------------------

u. Hours In Ret=crtinq l?e..""icd
12. NlllIDer Of Hours Reactor Was, Critical
13. Reactor Rese?:Ve Shutdcwn Hours
14. Hours Generator On-Lina
15. Unit Reserve Shutdown Hours l6. Gross 'lbemal Energy Generated(_~)

l7.

Gross Electrical Energy Generated (MWH)

18.

Net Electrical EneJ:gy Generated(MrlH) 1.9.

rrni.t Service Fac"'..or

20. Onit Availability Factor This ltlnth 719 69.1 0

67.9 0

  • 200,095 66,820 59,716 9.4 9.4
21. Unit capacity Factor (Using MtC Net)
7. 7
22. Unit Capacity Factor (Using DER Net)
7. 6
23. Unit Forced Outage Rate 0

Year to Date 2,879 2,184.5 22.7 2,161.3 0

6,482,491 2,181, 770 2,084,321 75.1 75.1 67.1 66.4 2.99

24.

Shutdowns Scheduled over Next 6 Months (Type, Date, and Dlll:ation of Each):

Unit #1 Refueling 4/3/79 - 6/27/79 CUlmlla.ti ve 16,080 9,841.4 22.7 9,459.3 0

27,467,227 9,154,580 8,671,301 58.8 58.8 50.0 49.5 31.3

25. If Shut. Down At End of Report Period! Estimated Date of Startup: _____

6..._/..-2..... 7._/..;..79"'-----------

26.

Units In Test Status (Prior to-Camerc:ial Gperation) :

B-l-7.R23 of 13 Pg.

Forecast 9/30/76 11/01/76 12/20/76 Achieved 12/11/76 12/25/ 76 6/30/77

00.

DATE 79-189_

4/3/79 1

F: Forced s:

Scheduled Page 4 of 13 8-1-7.Rl TYP~

s 2

UNIT sHl111xi-INs AND PCMER mb:TIONS.

REPORl' MJlmtApril 197;9 ME:nm OF OORATIOO RFAsoN2 SlnnTIOO (IDJRS)

IXMN REACTOR 651.1 c

1 Reason:

A-Equiprent Faliure(Explain)

B-Maintenano:! or Test C-Refueling Litmsil:

EvENr iU!:Pc>Rl'. i 0-Regulatory Restriction E~rator Training & License Examination F-.ildministrative G-<:\\>erational Error(Explain)

II-other (Explain) j SYSTEM CXMPOOF.Nl' cooir' CODES RC FOELXX lt!thod:

1-Manual 2-Manual Scram.

3-Autanatic Scram.

4-other (Explain)

DOCKET NO, 1 5 0- 2 7 2

~~~~~~~~~

  • UNIT 1N.l\\ME:

Salem U DATE:

May 9, 1979 COMPI,ETED BY:

L. K. Miller TEI.EPllONE: 6 09-3 6 5-7 00 0 XS 0 7 CAUSE AND CORREx:l'IVE ACTION TO PREVENI' REOJRRENCE Annual refueling outage.

4 A.

B.

Exhibit G - Iristructions for Preparation of Data Entry Sheets for Licensee Event Report(IBR) File (NUREG-0161)

I i

5 Exhibit 1-Salle Source LOAD REDUCTION CONTINUATION OF PREVIOUS.

OurAGE.

,MAJOR PLANT. MODI-ATIONS REPORT MONTH April 1979

  • DCR NO.

PRINCIPLE SYSTEM lED-0523 Vital Bus Diff.Protection lPD-0137 N. I. Source

  • DESIGN CHANGE.REQUEST 8 Range

~CKET NO.: ~5_0_-_2_7_2~~~~~

~T NAME:

Salem #1 DATE:

May 9, 1979 COMPLETED BY: L. K. Miller TELEPHONE: 609-365-7000 X507 SUBJECT Remove relays until a qualified substitute is available.

Install a high voltage alarm.

Page 5 of 13

DOCKET NO.:

50-272 Mf.JOR PLANT MODIFlllATIONS REPORT MONTH Ap. 1979.

_;;,...;._~---~~~~~-

~IT NAME:

salem #1 DATE:

May 9, 1979

  • DCR NO.

lEC-0523 lPD-0137 10CFRSO. 59.

COMPLETED BY:

L. K. Miller TELEPHONE: 609-365-7000 X507 SAFETY EVALUATION This change will prevent possible misoperation of the bus diff.

relay during earthquake.

4KV vital buses will be protected by the bus overhead relay.

This change is only temporary.

A modification of the system will be provided as soon as possible.

Safety related equipment will not be affected.

Paae 6 of 13

DOCKET. NO. :

50-272 RELA.D uA* NAME:

Salem #1 *

SUMMARY

OF SAFETY MAINTENANCE Maintenance DATE:

May 9, 1979 DEPARTMENT April 1979 COMPLETED BY:

L. K. Miller REPORT MONTH TELEPHONE:

609-365-7000 X507 WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO.

MD3004 Valve, 14RH027 Bonnet steam leak.

Replaced gasket.

009150 Valve, 10MS055 Stem steam leak.

Repacked stem.

010161 Valve, lOSJOOl Stem and oonnet leaks.

Repacked stem, replaced gasket.

010177 Valve, 10SJ002 Stem leak.

Repacked stem.

010532 Valve, 14MS131 Stem leak.

Repacked stem.

010665 Valve, 10PS009 Stem leak.

Repacked stem.

010666 Valve, 10PS022 stem leak.

Repacked stem.

010810 Instrument, Indication reads 4% low.

Calibrated.

1LA3977.

900966 Fan, crdm.vent.

Fan ~- failed.

Replaced fan.

901263 Support, Reactor Fabricate.

Fabricated.

flux thimble.

901303 Cooler, 12 Fan Coil Replacement cooler.

Completed.

Unit motor oil.

902521 Filters, 11 Aux.

Replace filters.

Filters replaced.

Bldg. Vent RGH.

I 902558 Instrument, Install in new :EU,el Installed 36 plugs.

New thfroble plug assemblies.

device.

' \\

I I

I

. Page 7 of l~_.'

. \\

DOCKET NO. :. 50""'."272

SUMMARY

OF SAFETY RELA& MAINTENANCE DEPARTMENT Maintenance NAME:

DATE:

Salem #1 May 9, 1979 REPORT MONTH April 1979 COMPLETED BY: L. K. Miller WORK ORDER NO.

902627

. 902696

..' 903522 903555 903653 903680 903708 903822

. ~903830 904117 904140 904521 TELEPHONE: 609-365-7000 X507 EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION Breaker, 11 Pri-mary wtr pump 460VAC *.

Breaker does not open from Replaced breaker.

control room.

Pump, 13 component Check and repair seals

  • cooling.

14, service-Water, Screen.

~ -

Strainer, 15 Serv.

Water pump.

Heating coil, 12 Aux. Bldg.

  • supply
  • fan.

Will not run.

Drive shaft packing gland leak.

Leaks.

Fan, 11 switchgear Will not operate.

Room supply.

Strainer, 12 Serv. Broken shear key.

Water Pump.

Exhangers, lube oil Inspect Lube oil cooler heat.

zincs.

valve, 16swo10.

Fiange leakp:

  • Pump, 13 Charging Cylinder head is leaking.

Strainer, 14 Serv. Replace shear key.

Water Pump.

Pump, 13 Serv. Wtr. Repack.

Replaced WJrn parts.

Blew:iown line, calibrated switch 1PD2734.

Installed new shaft, mtr. nount.

. Coil repaired.

Unjamned dampers.

Replaced shear key.

Replaced all zincs.

Tightened* flange

Replaced shoes, shear key.

Repacked.

Page 8 of 13

DOCKET NO.:

50-272

SUMMARY

OF SAFETY RELA.a MAINTENANCE UN-NAME:

Salem #1.

DATE:

May 9, 1979 DEPARTMENT Maintenance COMPLETED BY:

L. K. Miller REPORT MONTH April 1979 TELEPHONE:

609-365-7000 X507 WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO.

904713 Pump, 13 Serv.

Packing leaks.

Repacked.

~'.'later.

905063 Valve, 12CV156.

Collar moves with stem.

Replaced bonnet, diaphragm.

'page 9 of 13

DOCKET NO.:

50-272 SID-iMARY OF SAFETY RELA.a MAINTENANCE DEPARTMENT Perfonnance UN-NAME:

DATE:

Salem #1 May 9, 1979 L. K. Miller REPORT MO~TH April 1979 COMPLETED BY:

TELEPHONE:

609-365'"-7000 X507

[WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO.

I i

PD-4938 Instrument, Indication swinging.

Replaced R'ID.

i 1TE0411B.

009118 Instrument, Canputer reads high.

Reinsulated frayed wire.

~:

1TE0452B.

900368 Instrument, SSPS CB2A 28VDC Brkr for NIS Replaced bulbs.

Train A.

Control tripped.

I 900369 Instrument, Source Source ranges N32, N31 Hi Cleaned connectors, replaced

. - Range N32.

Diff.

0-ring.

900464 Instrument, Out of calibration.

Calibrated.

1R003.

900495 Exchanger, 14 + 15 Unstable flows thru heat Repaired solenoid valve.

Fan coil unit exchanger.

heater.

902535 Annunciator, 1C026 Will not reset with Unit Limit switch properly set.

Water flow trouble. in Hi speed.

902678 Instruments, Ch. 2 reads Hi canpared to Canpleted Cal. Functional Check.

Channel 2 pressur-other two channels.

izer level.

903539 Instrument, -

Failed.

Cleaned connector.

1PA2397.

903735 Screen, 11 Service Will not run in auto or Recalibrated.

i Water pump trvl.

manual.

903744 Valve Operator, Will not open from console.

Replaced diaphragm.

11GB004.

Page 10 of 13

DOCKET NO * :

50-272 suMM.iRY OF SAFETY RELA& MAINTENANCE DEPARTMENT Perfonnance

~----------~

UN-NAME :_..;;Sa;.;;;;;;;;.lem;;;;....::.#.;;;.l ______ _

DATE:

May 9, 1979 REPORT MONTH April 1979 COMPLETED BY:

L. K. Miller

~----------~

TELEPHONE:

609-365-7000 X507

~WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO.

\\

904150 Instrument, Reads low.

Recalibrated.

l'IM0432A.

904151 Instrument, 1FM532F _Steam Flow spikes high.

Replaced capacitors.

904593 Annunciator, 12 No IDw Flow alann at Calibrated.

Serv. Wtr. Low 2000GPM.

Flow.

\\,

! I I !1 I !

1:.

I'.,

Page 11 of 13

SALEM UNIT I OPERATING

SUMMARY

APRIL 1979 4-1 100% Reactor power all day.

4-2 100% Reactor power all day.

4-3 0001 - Started load reduction for refueling.

1930 -

Reactor tripped from 9% power.

4-4 thru 4-30 Refueling Outage.

Page 12 of 13

e*

REFUELING INFORMATION MONTH:

April 1979 DOCKET NO.:

50-272 UNIT: Salem #1 DATE: May 9, 1979 COMPLETED BY: L. K. Miller TELEPHONE:609-365-7000 X507

1.

Refueling information has changed from last month:

YES X

NO ---

2.

Scheduled date of next refueling:

March 29, 1980

~~~~~~~~~~~--~~~~~~

3.

Scheduled date for restart following refueling:

May 25, 1980

4.

A.

Will Technical Specification changes or other license

  • amendments be required'?

YES' NO ---

NOT DETERMINED TO-DATE~-A~p~r~i~l..__1~9~7~9~-

B.

Has the reload* fuel design been reviewed by the Station Operating Review Committee?

YES NO x ---

If no, when is it scheduled'?

February 1980

5.

Scheduled date(s) for submitting proposed licensing action:

February 1980 I.f Required 6..

Important licensing* considerations.associated with refueling:

NONE*

7.

Number of Fuel Assemblies:

  • A.

In-core 193 B.*

In Spent Fuel Storage

  • O

~~~--~~--~~~~~~-

8. *
  • Present licensed spent fuel storage capacity:.

2 64

~~~--~~--~--------

Future spent fuel storage capacity:

1 170

~~=---=--""""---~--~------

9.

Da.te*of last refueling that can be. discharged-to the spent fuel pool assuming the present licens.ed capacity:

April 1982 Page 13 of 13 8-l-7.R4