Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18081B014 + (10:50:51, 6 January 2025)
- PNO-I-79-028A, on 791205,news Media Attributed Shutdown to Repair of Secondary Plant Steam Valve Packing Gland Leaks & Problem W/Secondary Circulating Water Condensor Cooling Pump.Reconfirms Cause as Diesel Generator Seismic Restraint + (10:50:51, 6 January 2025)
- 05000272/LER-1979-080-03, /03L-0:on 791227,during Normal startup,1E 4/kV Group Bus Was Lost While Attempting to Switch from Station Power to Auxiliary Power Transformer,Causing Loss of Reactor Coolant Pump 12.Operating Instruction Modified + (10:50:53, 6 January 2025)
- 05000272/LER-1979-080, Forwards LER 79-080/03L-0 + (10:50:54, 6 January 2025)
- 05000272/LER-1979-079-03, /03L-0:on 791230,during Startup Operations, Radwaste Sys Tank Level Indicated Less That 350,000 Gallons. Caused by Failure of Level Indicating Circuit.Pressure Gauge Mounted at Tank for Temporary Local Indication + (10:50:56, 6 January 2025)
- 05000272/LER-1979-079, Forwards LER 79-079/03L-0 + (10:50:58, 6 January 2025)
- ML18081B006 + (10:50:59, 6 January 2025)
- ML18081B004 + (10:50:59, 6 January 2025)
- ML18081B003 + (10:51:00, 6 January 2025)
- ML18081B002 + (10:51:00, 6 January 2025)
- ML18081A999 + (10:51:01, 6 January 2025)
- ML18081A998 + (10:51:02, 6 January 2025)
- ML18081A996 + (10:51:02, 6 January 2025)
- ML18081A995 + (10:51:03, 6 January 2025)
- ML18081A993 + (10:51:04, 6 January 2025)
- ML18081A991 + (10:51:05, 6 January 2025)
- ML18081A989 + (10:51:06, 6 January 2025)
- IR 05000311/1979028 + (10:51:07, 6 January 2025)
- ML18081A986 + (10:51:08, 6 January 2025)
- IR 05000272/1979030 + (10:51:09, 6 January 2025)
- ML18081A983 + (10:51:10, 6 January 2025)
- IR 05000272/1979027 + (10:51:16, 6 January 2025)
- ML18081A980 + (10:51:18, 6 January 2025)
- ML18081A979 + (10:51:19, 6 January 2025)
- ML18081A977 + (10:51:22, 6 January 2025)
- ML18081A975 + (10:51:23, 6 January 2025)
- ML18081A973 + (10:51:24, 6 January 2025)
- ML18081A972 + (10:51:25, 6 January 2025)
- 05000272/LER-1979-077-03, /03L-0:on 791224,during Startup,Breaker 11ASD tripped,de-energizing 4 Kv Vital Bus 1A & Supplied Plant Loads.Caused by Failure of Components in Logic Circuit.Five Logic Boards & One Relay Replaced + (10:51:26, 6 January 2025)
- 05000272/LER-1979-078-03, /03L-0:on 791226,during Startup Operation,Control Room Operator Attempted to Start Containment Fan Coil Unit in High Speed.High Speed Breaker Tripped.Caused by Improper Closing Sequence of Two High Speed Breakers + (10:51:31, 6 January 2025)
- 05000272/LER-1979-078, Forwards LER 79-078/03L-0 + (10:51:33, 6 January 2025)
- 05000272/LER-1980-001-03, /031-0:on 800101,axial Flux Difference Determined to Be Outside Target Band.Caused by Signal Output Failing High.Signal Isolator Was Replaced & Axial Flux Difference Monitor Recalibr + (10:51:35, 6 January 2025)
- 05000272/LER-1979-036, Supplemental LER 79-036/01X-1:on 790410,while in Mode 5 for Refueling,Station Notified of Apparent Design Deficiency. Differential Relay for 4 Kv Vital Buses May Not Meet Design Seismic Qualifications.Caused Not Stated + (10:51:36, 6 January 2025)
- 05000272/LER-1980-001, Forwards LER 80-001/03L-0 + (10:51:38, 6 January 2025)
- ML18081A954 + (10:51:41, 6 January 2025)
- ML18081A953 + (10:51:42, 6 January 2025)
- CAC:MF9872 + (10:51:43, 6 January 2025)
- ML18081A948 + (10:51:45, 6 January 2025)
- 05000272/LER-1978-075, Supplemental LER 78-075/03X-1:on 781130,while Containment Entry in Progress,Inner Door of Air Lock Elevation 130 Ft Would Not Fully Open.Caused by Failed Cam Roller on Inner Door Operating Mechanism.Cam Roller Replaced + (10:51:46, 6 January 2025)
- 05000272/LER-1979-001, Supplemental LER 79-001/03X-1:on 790102,during Normal Operations,Containment Fan Coil 12 Shifted to Slow Speed. Operator Noticed No Indication of Svc Waterflow.Caused by Burned Out Coil in Solenoid Valve SV-624.Coil Replaced + (10:51:48, 6 January 2025)
- ML18081A940 + (10:51:49, 6 January 2025)
- ML18081A939 + (10:51:50, 6 January 2025)
- ML18081A936 + (10:51:51, 6 January 2025)
- ML18081A937 + (10:51:51, 6 January 2025)
- ML18081A934 + (10:51:52, 6 January 2025)
- ML18081A931 + (10:51:53, 6 January 2025)
- ML18081A930 + (10:51:54, 6 January 2025)
- 05000272/LER-1979-076-03, /03L-0:on 791220,while Taking Chemical & Vol Control Sys Holdup Tank 11 Off Recirculation & Putting Tank 12 on Recirculation,Recirculation Pump Was Not Changed, Causing Tank Deformation.Design Mods Implemented + (10:51:55, 6 January 2025)
- ML18081A927 + (10:51:59, 6 January 2025)
- 05000272/LER-1979-076, Forwards LER 79-076/03L-0 + (10:52:00, 6 January 2025)
- ML18081A923 + (10:52:01, 6 January 2025)