Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000272/1988004 + (09:00:28, 6 January 2025)
- ML18093A800 + (09:00:29, 6 January 2025)
- 05000272/LER-1988-006, :on 880318,10CFR50 App R Cable Design Deficiency Identified.Caused by Design Error.Cable Will Be re-routed During Next Refueling Outage.Roving Fire Watch Will Be Continued Until Completion of Repair + (09:00:30, 6 January 2025)
- ML18093A798 + (09:00:32, 6 January 2025)
- 05000272/LER-1988-005-01, :on 880307,identified Tech Spec Surveillance 4.7.8.1.2.a,sealed Source Leak Check Not Performed within 6 Months from Prior Surveillance.Caused by Inadequate Administrative Controls Associated W/Computer Sys + (09:00:33, 6 January 2025)
- 05000272/LER-1988-005, Forwards LER 88-005-00 + (09:00:35, 6 January 2025)
- ML18093A792 + (09:00:37, 6 January 2025)
- ML18093A791 + (09:00:37, 6 January 2025)
- ML18093A789 + (09:00:42, 6 January 2025)
- ML18093A788 + (09:00:43, 6 January 2025)
- ML18093A787 + (09:00:44, 6 January 2025)
- ML18093A783 + (09:00:48, 6 January 2025)
- ML18093A782 + (09:00:49, 6 January 2025)
- PNO-I-88-038, on 880330,reactor Manually Tripped Following Loss of Turbine Generator Hydraulic Control Oil Pumps.Util Will Remain Shutdown for 2 Wks to Repair Steam Generator Tube Leakage.State of Nj Notified + (09:00:50, 6 January 2025)
- ML18093A780 + (09:00:51, 6 January 2025)
- ML18093A777 + (09:00:52, 6 January 2025)
- ML18093A776 + (09:00:53, 6 January 2025)
- IR 05000272/1988005 + (09:00:55, 6 January 2025)
- ML18093A773 + (09:00:56, 6 January 2025)
- ML18093A772 + (09:00:57, 6 January 2025)
- ML18093A771 + (09:00:58, 6 January 2025)
- ML18093A770 + (09:00:58, 6 January 2025)
- ML18093A769 + (09:01:00, 6 January 2025)
- ML18093A763 + (09:01:02, 6 January 2025)
- ML18093A767 + (09:01:02, 6 January 2025)
- ML18093A760 + (09:01:04, 6 January 2025)
- ML18093A754 + (09:01:05, 6 January 2025)
- ML18093A757 + (09:01:05, 6 January 2025)
- 05000272/LER-1988-004-01, :on 880222,change from Mode 3 to Mode 2 Conducted W/Containment Hydrogen Analyzer Technically Inoperable Due to Missed Environ Qualification Surveillance. Caused by Ineffective Administrative Control + (09:01:07, 6 January 2025)
- ML18093A750 + (09:01:08, 6 January 2025)
- ML18093A749 + (09:01:09, 6 January 2025)
- ML18093A748 + (09:01:10, 6 January 2025)
- ML18093A747 + (09:01:11, 6 January 2025)
- 05000272/LER-1988-003-02, :on 880224,reactor Trip Occurred on False intermediate-range High Flux Signal.Caused by Personnel Error.Maint Mgt Completed Review of Circumstances Surrounding Event.Individual Counseled + (09:01:12, 6 January 2025)
- 05000272/LER-1988-002-03, :on 880218,control Room Indication Identified to Register Approx 5 F Above Wide Range RCS Indication. Caused by Mfg Not Identifying Component Design Mod in Specs + (09:01:14, 6 January 2025)
- ML18093A743 + (09:01:15, 6 January 2025)
- ML18093A741 + (09:01:17, 6 January 2025)
- ML18093A740 + (09:01:19, 6 January 2025)
- ML18093A739 + (09:01:20, 6 January 2025)
- ML18093A738 + (09:01:22, 6 January 2025)
- ML18093A734 + (09:01:23, 6 January 2025)
- ML18093A736 + (09:01:23, 6 January 2025)
- ML18093A733 + (09:01:24, 6 January 2025)
- ML18093A728 + (09:01:26, 6 January 2025)
- 05000311/LER-1988-003, :on 880208,Tech Spec Table 3.3-12 Action 27 Not Complied With.Caused by Personnel Error Associated W/ Inadequate Communications & Training.Operations Dept Mgt Reviewed Event & Procedures Will Be Modified + (09:01:27, 6 January 2025)
- ML18093A721 + (09:01:29, 6 January 2025)
- ML18093A719 + (09:01:30, 6 January 2025)
- 05000272/LER-1988-001-02, :on 880211,diesel Generator Day Tanks Found Not Properly Anchored to Supporting Steel Foundation.Cause Not Determined.Tanks Weld Anchored to Wide Flange Steel Beam Foundation on 880212 + (09:01:31, 6 January 2025)
- ML18093A717 + (09:01:32, 6 January 2025)
- IR 05000272/1987030 + (09:01:33, 6 January 2025)
- PNO-I-88-027, on 880307,util Announced Election of Jf Paquette as President & Chief Operating Officer & Director of Company & CA Mcneill as Executive Vice President Effective on 880314 + (09:01:39, 6 January 2025)