~I Public Service Electric and Gas Company Steven E. Miltenberger Vice President -

Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609 339-4199 Nuclear Operations March 25, 1988 NLR-N88050 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

RESPONSE TO COMBINED INSPECTION REPORT 50-272/87-37 AND 50-311/87-37 SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric and Gas Company (PSE&G) has r~ceived the subject inspection report dated January 25, 1988.

The inspection report requests that.PSE&G address the following concerns:

  • 1.

The apparent lack of temperature control of samples provided to in-line chemical instrumentation.

2.

Acceptance criteria for comparison of in-line and laboratory readings of the same parameter.

Our response detailing the planned corrective actions and their anticipated completion dates is provided in the attachment.

Should you have any questions, please do not hesitate to contact us.

Attachment 8804010180 880325 PDR ADOCK 05000272 Q

DCD Sincerely,

Document Control Desk 2

C Mr. D. c. Fischer USNRC Licensing Project Manager Mr. R. w. Borchardt USNRC Senior Resident Inspector Mr. w. T. Russell, Administrator USNRC Region I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 03-25-88 J

ATTACHMENT A. Your letter dated January 25, 1988 transmitted a concern in regards to Salem Generating Station's sample temperatures for in-line instrumentation failing to meet ASTM recommended controlled standard of 25 + 1 degrees centigrade.

At present, both the steam generator blowdown and the condensate pump in-line instrumentation fail to meet this criteria.

The steam generator blowdown lines are provided with a sample heat exchanger, however, due to the high temperature variance of the cooling (component cooling) water and the lack of good cooling flow control capability the 25 + 1 degree standard cannot be obtained.

Currently, condensate pump-in-line instruments have no temperature conditioning capabilities.

CORRECTIVE ACTIONS:

PSE&G is currently investigating solutions to the temperature compensation problem.

A Minor Design Change Request (MDCR) is being developed to install packaged temperature control units that w{ll provide the capability to heat or cool circulating water.

This circulating water would then be used to condition the sample temperature to 25 + 1 degree centigrade.

This MDCR is expected to be completed by-December, 1988, as it requires some significant plant changes.

A new secondary laboratory with temperature conditioning capability is currently under evaluation.

Under current design the new laboratory would have sample conditioning panel designed to condition 46 sample streams.

PSE&G is continuing *t-0 investigate other options.

If an acceptable design can be found that allows for a more timely installation, it may be implemented in place of packaged temperature control units

  • ATTACHMENT (cont'd)

Concern was also expressed over the fact that the procedures for intercomparison of in-line and laboratory.instrument readings did not provide acceptance criteria.

These intercomparisons are used to check that the continuous indication process monitors are performing properly.

Presently, a review of the laboratory results is performed to verify that the process monitor's data is reasonable.

CORRECTIVE ACTIONS:

1.

Data collection of in-line monitor vs. laboratory results was implemented on January 15, 1988.

2.

Intercomparison acceptance criteria has been drafted and is presently being evaluated.

3.

Final acceptance criteria will be implemented by June 30, 1988.

--I