Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18093B063 + (08:55:10, 6 January 2025)
- RAIO-0418-59373, LLC Supplemental Response to NRC Request for Additional Information No. 110 (Erai No. 8932) on the NuScale Design Certification Application + (08:55:11, 6 January 2025)
- 05000272/LER-1988-013-02, :on 880812,several Penetration Seals Did Not Conform to Correct Color or Cell Structure as Recommended by Silicone Foam Mfg to Provide Necessary Fire Protection. Caused by Inadequate Procedural Guidance + (08:55:14, 6 January 2025)
- ML18093B058 + (08:55:16, 6 January 2025)
- ML18093B057 + (08:55:17, 6 January 2025)
- ML18093B056 + (08:55:17, 6 January 2025)
- PNO-I-88-091, on 880831,Unit 1 Tripped from Full Power as Result of Main Turbine Trip.Cause Unknown.Unit 2 Tripped from Full Power Due to High Steam Generator (SG) Level Resulting from SG Feed Regulating Valve Failing Open + (08:55:19, 6 January 2025)
- ML18093B053 + (08:55:21, 6 January 2025)
- ML18093B052 + (08:55:23, 6 January 2025)
- ML18093B050 + (08:55:24, 6 January 2025)
- ML18093B047 + (08:55:25, 6 January 2025)
- 05000311/LER-1988-016-01, :on 880730,reactor Trip Occurred.Caused by Equipment Problems Associated W/Vital Instrument Bus C Inverter.Design Change to Delete Specified Reactor Trip Logic Initiated + (08:55:27, 6 January 2025)
- ML18093B045 + (08:55:29, 6 January 2025)
- WO 18-0011, 1 to Updated Safety Analysis Report, Fire Protection Evaluation for HAZ Assessment of Structural Steel Integral to Fire Boundary, M-663-00017A, Att G5 to Att H + (08:55:31, 6 January 2025)
- ML18093B040 + (08:55:38, 6 January 2025)
- ML18093B039 + (08:55:39, 6 January 2025)
- ML18093B038 + (08:55:43, 6 January 2025)
- ML18093B037 + (08:55:44, 6 January 2025)
- ML18093B036 + (08:55:46, 6 January 2025)
- ML18093B031 + (08:55:49, 6 January 2025)
- ML18093B033 + (08:55:49, 6 January 2025)
- ML18093B030 + (08:55:51, 6 January 2025)
- ML18093B028 + (08:55:52, 6 January 2025)
- ML18093B027 + (08:55:53, 6 January 2025)
- ML18093B026 + (08:55:54, 6 January 2025)
- ML18093B025 + (08:55:57, 6 January 2025)
- 05000311/LER-1988-015-01, :on 880726,component Cooling HX 21 Declared Inoperable Due to Svc Water Leakage from Downstream Piping Resulting in Inoperability of HX 22.Caused by Equipment Problems.Leakage Repaired + (08:55:59, 6 January 2025)
- ML18093B023 + (08:56:02, 6 January 2025)
- 05000272/LER-1988-012-02, :on 880712,Tech Spec 3.7.9 Noncompliance Involving Missing Snubber Downstream from 1SJ13 Valve Occurred.Caused by Inadequate Administrative Control Over Design Change Work.New Snubber Installed + (08:56:04, 6 January 2025)
- ML18093B021 + (08:56:07, 6 January 2025)
- ML18093B020 + (08:56:08, 6 January 2025)
- ML18093B019 + (08:56:09, 6 January 2025)
- ML18093B017 + (08:56:12, 6 January 2025)
- ML18093B016 + (08:56:13, 6 January 2025)
- ML18093B015 + (08:56:16, 6 January 2025)
- ML18093B014 + (08:56:19, 6 January 2025)
- ML18093B013 + (08:56:22, 6 January 2025)
- ML18093B012 + (08:56:24, 6 January 2025)
- ML18093B011 + (08:56:25, 6 January 2025)
- ML18093B010 + (08:56:27, 6 January 2025)
- IR 05000272/1988014 + (08:56:32, 6 January 2025)
- ML18093B008 + (08:56:34, 6 January 2025)
- ML18093B007 + (08:56:35, 6 January 2025)
- ML18093B006 + (08:56:36, 6 January 2025)
- ML18093B004 + (08:56:37, 6 January 2025)
- ML18093B003 + (08:56:38, 6 January 2025)
- ML18093B002 + (08:56:39, 6 January 2025)
- IR 05000272/1988012 + (08:56:41, 6 January 2025)
- ML18093A999 + (08:56:42, 6 January 2025)
- ML18093A996 + (08:56:43, 6 January 2025)
- 05000272/LER-1988-020, :on 861108,Tech Spec Surveillance 4.7.7.1.a Not Completed within Specified Time.Caused by Personnel Error.Supervisors Counseled About Failure to Take Necessary Steps to Ensure Performance of Surveillance + (08:56:48, 6 January 2025)