Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18094A584 + (08:34:04, 6 January 2025)
- ML18094A583 + (08:34:05, 6 January 2025)
- 05000272/LER-1989-026, :on 890618,controlled Shutdown Per Tech Spec 3.3.2.1 Occurred Due to Inoperable Sec.Caused by Equipment Failure.Failed Pc Boards Replaced & Sequence Timing Switch Reset + (08:34:09, 6 January 2025)
- 05000272/LER-1989-027, :on 890619,reactor Trip on Steam Generator 13 lo-lo Level Occurred Due to Closing of Valve 13MS167.Caused by Inadequate Design of Continuity Check Circuitry for MS167 Valves.Design Change Implemented + (08:34:11, 6 January 2025)
- ML18094A579 + (08:34:12, 6 January 2025)
- ML18094A578 + (08:34:15, 6 January 2025)
- ML18094A577 + (08:34:16, 6 January 2025)
- ML18094A576 + (08:34:18, 6 January 2025)
- ML18094A574 + (08:34:21, 6 January 2025)
- ML18094A573 + (08:34:22, 6 January 2025)
- ML18094A571 + (08:34:23, 6 January 2025)
- 05000272/LER-1989-025, :on 890609,discovered That Radiation Monitoring Sys Main Steamline Monitor Channels Drain Line Isolated Due to Closure of Valve.Caused by Inadequate Administrative Control.Design Change Program Revised + (08:34:28, 6 January 2025)
- ML18094A569 + (08:34:31, 6 January 2025)
- IR 05000272/1989011 + (08:35:04, 6 January 2025)
- ML18094A567 + (08:35:11, 6 January 2025)
- ML18094A565 + (08:35:13, 6 January 2025)
- ML18094A564 + (08:35:16, 6 January 2025)
- ML18094A563 + (08:35:17, 6 January 2025)
- ML18094A561 + (08:35:21, 6 January 2025)
- 05000272/LER-1989-024, :on 890609,safety Injection Concurrent W/ Reactor Trip Signal Occurred.Caused by Inadequate Drainage of Main Steamlines.Event Reviewed W/Maint Personnel & Procedures Modified + (08:35:53, 6 January 2025)
- ML18094A558 + (08:35:56, 6 January 2025)
- 05000272/LER-1989-023, :on 890603,unit Entered Operational Condition Having One Instead of Two source-range Channels Operable. Caused by Personnel Error.Event Reviewed W/Licensed Operators to Comply W/Procedural Requirements + (08:36:02, 6 January 2025)
- 05000272/LER-1989-022, ;on 890603,control Rod Shutdown Banks B & C Withdrawn Together Contrary to Tech Spec 3.1.3.2.2a.Caused by Personnel Error.Process by Which Tech Spec Amends Are Promulgated Under Review + (08:36:08, 6 January 2025)
- ML18094A555 + (08:36:10, 6 January 2025)
- ML18094A554 + (08:36:12, 6 January 2025)
- ML18094A553 + (08:36:14, 6 January 2025)
- ML18094A552 + (08:36:16, 6 January 2025)
- ML18094A550 + (08:36:18, 6 January 2025)
- ML18094A549 + (08:36:20, 6 January 2025)
- ML18094A548 + (08:36:22, 6 January 2025)
- ML18094A547 + (08:36:23, 6 January 2025)
- ML18094A546 + (08:36:26, 6 January 2025)
- ML18094A545 + (08:36:28, 6 January 2025)
- ML18094A543 + (08:36:30, 6 January 2025)
- ML18094A541 + (08:36:33, 6 January 2025)
- ML18094A540 + (08:36:34, 6 January 2025)
- ML18094A539 + (08:36:36, 6 January 2025)
- ML18094A538 + (08:36:38, 6 January 2025)
- ML18094A537 + (08:36:39, 6 January 2025)
- ML18094A536 + (08:36:40, 6 January 2025)
- 05000272/LER-1989-019-01, :on 890520,both Loops of RHR Sys Were Declared Inoperable Due to Gas Binding of RHR Pumps.Caused by Personnel Error.Use of Test Procedure Discontinued Until Completion of Review.Procedure Revised + (08:37:14, 6 January 2025)
- 05000272/LER-1989-019, Forwards Revised LER 89-019-00,correcting Dates of Original Issue & Occurrence + (08:37:38, 6 January 2025)
- 05000272/LER-1989-021, :on 890523,discovered That High Radiation Area Not Adequately Controlled as Required by Tech Spec 6.12.2. Caused by Personnel Error.Disciplinary Action Has Been Taken + (08:37:41, 6 January 2025)
- ML18094A530 + (08:37:44, 6 January 2025)
- ML18094A527 + (08:37:47, 6 January 2025)
- 05000272/LER-1989-020, :on 890520,false Flow Measurement Recorded During Steam Injection Full Flow Test Procedure SP(O)4.5.2H. Caused by Inadequate Procedural Guidance for Installation of Orifice Plates.New Procedure Initiated + (08:37:49, 6 January 2025)
- ML18094A525 + (08:37:51, 6 January 2025)
- ML18094A522 + (08:37:53, 6 January 2025)
- ML18094A521 + (08:37:54, 6 January 2025)
- ML18094A520 + (08:37:55, 6 January 2025)
- ML18094A519 + (08:37:56, 6 January 2025)