Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-7701, Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination + (06:25:57, 6 January 2025)
- ML18101A347 + (06:26:01, 6 January 2025)
- ML18101A346 + (06:26:01, 6 January 2025)
- ML18101A345 + (06:26:03, 6 January 2025)
- ML18101A342 + (06:26:03, 6 January 2025)
- ML18101A341 + (06:26:04, 6 January 2025)
- ML18101A339 + (06:26:05, 6 January 2025)
- 05000272/LER-1994-015-01, :on 941018,refueling Water Storage Tank Water Vol Level Less than Required.Transmitters Properly Adjusted & RWST Level Was Returned to within Specification + (06:26:07, 6 January 2025)
- IR 05000272/1994028 + (06:26:08, 6 January 2025)
- ML18101A335 + (06:26:10, 6 January 2025)
- 05000311/LER-1994-012-02, :on 941013,required Daily Calibr of Power Range Instrumentation Not Performed within Surveillance Interval Due to Personnel Error.Personnel Involved in Event Counseled & Procedure SC.OP-DD-ZZ-0D40(Z) Revised + (06:26:12, 6 January 2025)
- ML18101A330 + (06:26:13, 6 January 2025)
- ML18101A329 + (06:26:14, 6 January 2025)
- ML18101A327 + (06:26:15, 6 January 2025)
- ML18101A324 + (06:26:17, 6 January 2025)
- ML18101A320 + (06:26:18, 6 January 2025)
- ML18101A322 + (06:26:18, 6 January 2025)
- ML18101A318 + (06:26:19, 6 January 2025)
- IR 05000272/1994014 + (06:26:20, 6 January 2025)
- ML18101A315 + (06:26:22, 6 January 2025)
- ML18101A314 + (06:26:23, 6 January 2025)
- ML18101A313 + (06:26:23, 6 January 2025)
- 05000311/LER-1994-011-01, :on 940929,manually-initiated Reactor Trip Signal Following Unplanned Closure of MSIV21 & 22 MS167. Caused by Personnel Error.Appropriate Procedures Changed + (06:26:25, 6 January 2025)
- ML18101A311 + (06:26:27, 6 January 2025)
- ML18101A310 + (06:26:27, 6 January 2025)
- ML18101A308 + (06:26:28, 6 January 2025)
- ML18101A305 + (06:26:29, 6 January 2025)
- ML18101A306 + (06:26:29, 6 January 2025)
- IR 05000272/1994020 + (06:26:32, 6 January 2025)
- ML18101A303 + (06:26:33, 6 January 2025)
- ML18101A301 + (06:26:35, 6 January 2025)
- ML18101A299 + (06:26:39, 6 January 2025)
- ML18101A297 + (06:26:39, 6 January 2025)
- ML18101A295 + (06:26:40, 6 January 2025)
- ML18101A292 + (06:26:42, 6 January 2025)
- ML18101A290 + (06:26:43, 6 January 2025)
- ML18101A288 + (06:26:44, 6 January 2025)
- ML18101A287 + (06:26:45, 6 January 2025)
- ML18101A286 + (06:26:48, 6 January 2025)
- 05000272/LER-1993-014, :on 930722,determine 4 Kv Vital Bus Second Level Undervoltage Protection Dropout Setpoint Would Not Protect Motors.Detailed Study Showed Motors Would Have Performed Intended Safety Functions + (06:26:50, 6 January 2025)
- IR 05000272/1994019 + (06:27:17, 6 January 2025)
- ML18101A282 + (06:27:20, 6 January 2025)
- IR 05000272/1994025 + (06:27:21, 6 January 2025)
- ML18101A278 + (06:27:23, 6 January 2025)
- ML18101A274 + (06:27:24, 6 January 2025)
- ML18101A273 + (06:27:25, 6 January 2025)
- ML18101A271 + (06:27:26, 6 January 2025)
- ML18101A270 + (06:27:26, 6 January 2025)
- ML18101A268 + (06:27:27, 6 January 2025)
- ML18101A266 + (06:27:28, 6 January 2025)
- ML18101A264 + (06:27:29, 6 January 2025)
- ML18101A265 + (06:27:29, 6 January 2025)