UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555--0001 November 10, 1994 The Honorable William V. Roth, Jr.
United States Senate Washington, DC 20510
Dear Senator Roth:
I am responding to your memorandum of October 13, 1994, which forwarded a letter from Frederick Harpster, one of your constituents, regarding government oversight of Salem Nuclear Generating Station.
I can assure you and Mr. Harpster that the U.S. Nuclear Regulatory Commission (NRC) is closely monitoring plant operations at the Salem station. The NRC has three resident inspectors located at Salem whose sole responsibility is to assess plant safety. This resident staff is supplemented, as required, by inspectors from the NRC's Region I office in King of Prussia, Pennsylvania, and NRC Headquarters in Rockville, Maryland.
Because of recent performance issues, the NRC has increased regulatory attention to Public Service Electric and Gas Company's (PSE&G) operation and maintenance of the Salem Station.
The NRC has also taken_eDforcement action on several occasions to emphasize the importance that the NRC places ori ~ffective and safe operating practices, and proper adherence to regulatory requirements.
Most recently, on October 5, 1994, the NRC issued a proposed civil penalty of $500,000 following an April 7, 1994, event at Salem Unit 1.
This event occurred when marsh grass caused clogging of the circulating water system resulting in an automatic reactor shutdown and two automatic actuations of the safety injection system.
The proposed civil penalty was issued to emphasize the importance of aggressive management of the Salem station to ensure that (1) management expectations are established, effectively communicated, and followed by the station staff, (2) problems are promptly identified and corrected, and (3) operations supervisors maintain appropriate command and control. This event was the fourth significant event at the Salem station since 1991.
In response to the recent occurrences, one of which was cited by Mr. Harpster, PSE&G has been acting to replace or repair equipment that contributed to, or was a factor in, station performance problems and to correct operating practices that need improvement.
PSE&G has also reassigned or replaced supervisory and technical personnel in an effort to improve overall station performance.
The NRC, with its increased regulatory attention to Salem, will continue to monitor the results of these efforts.
-i November 1~994 The Honorable William V; Roth, Jr. I assure you that the NRC staff will continue to closely monitor plant operations and will not hesitate to take any necessary regulatory actions.
I trust this letter will satisfy your constituent's concerns.
DISTRIBUTION See attached list OFFICE PDI-2/LA PDI-2/PM NAME MO' Brien*
LOlshan*
DATE 11/02/94 11/02/94 OFFICE ADP NRR/D NAME RZi11111erman*
WRussel l*
DATE 11/04/94 11/04/94 OFFICIAL RECORD COPY Sincerely, Crlgina~ s~gru~Qj bl]
James M. Ta.yl@lf James M. Taylor Executive Director for Operations
- Previously Concurred PDI-2/D TECH ED*
DRPE/D*
JStolz*
MMejac*
SVarga*
11/02/94 10/25/94 10/24/94 EDO,..,. ~
OCA JTa~
~~/}(--
- ( 1cp94 1! l(rJ/94 DOCUMENT NAME
A:\\SA10560.GRN
~ -
Distribution: Letter to Senator William V. Roth. Jr.* Date:
Docket Fi~r< (50-2~2/311) w/incoming PUBLIC tAf,_ /h.C<J'"'"'-* n °1--tfs; EDO #10560 if EDO Reading JTaylor JMilhoan HThompson JBlaha WRussell/FMiraglia TTMartin, RI RZimmerman AThadani DCrutchfield PDl-2 Reading Cw/incoming)
SVarga JZwolinski JStolz OGC OPA OCA SECY #CRC-94-1058 NRR Mail Room (EDO #10560) w/incoming, 012G-18
-NOl son LDodley LOlshan w/incoming MO'Brien CAnderson, RGN-1
\\
- e EDO Principal Correspondence Control p
FROM:
DUE:
11/~/94 Sen. William v. Roth, Jr.
TO:
OCA FOR SIGNATURE OF :
- GRN **
Executive Director DESC:
ENCLOSES LETTER FROM FREDERICK HARPSTER RE SALEM NUCLEAR FACILITY DATE: 10/19/94 ASSIGNED TO:
CONTACT:
NRR Russell SPECIAL INSTRUCTIONS OR REMARKS:
NRR RECEIVED:
NRR ACTION:
NRR ROUTING:
OCTOBER 19, 1994 DRPE~::RGA AGL IA ANI ZIMMERMAN CRUTCHFIELD BOHRER.
EDO CONTROL: 0010560 DOC DT: 10/13/94 FINAL REPLY:
CRC NO: 94-1058 ROUTING:
Taylor Milhoan Thompson Blaha TTMartin, RI ACTION DUE TO NHR D!RECTOR'S OFFICE BY fk4 clt. '/(!,,
7
PAPER NUMBER:
ACTION OFFICE:
AUTHOR:
AFFILIATION:
ADDRESSEE:
LETTER DATE:
SUBJECT:
ACTION:
DISTRIBUTION:
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET CRC-94-1058 EDO SEN WILLIAM ROTH U.S. SENATE OCA Oct 13 94 LOGGING DATE: Oct 18 94 FILE CODE: IDR-5 SALEM SALEM NUCL~ FACILITY I
Signature of EDO OCA TO ACK, DSB SPECIAL HANDLING: NONE CONSTITUENT:
FREDERICK HARPSTER NOTES:
DATE DUE:
Nov 1 94 SIGNATURE:
DATE SIGNED:
AFFILIATION:
EDO --- 010560