ML18101A335

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-272/94-28 & 50-311/94-28 on 941017-21.No Violations Noted
ML18101A335
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/15/1994
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
Shared Package
ML18101A336 List:
References
NUDOCS 9411220055
Download: ML18101A335 (3)


See also: IR 05000272/1994028

Text

November 15, 1994

Mr. Leon R. Eliason

  • Chief Nuclear Officer & President

Nuclear Business Unit

Public Service Electric and Gas Company

P. 0. Box 236

Hancocks Bridge, New Jersey 08038

SUBJECT:

COMBINED INSPECTION NOS. 50-272/94-28 AND 50-311/94-28

Dear Mr. Eliason: -

This letter refers to the safety inspection conducted by Ms. Laurie Peluso of

this office on October 17-21, 1994 of activities authorized by NRC License

Nos. DPR-70 and DPR-75, at the Salem Generating Station, Hancocks Bridge, New

Jersey and to the discussions of our findings held by Ms. Peluso with Messrs.

Cellmer and Morroni and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are important to public .health and

safety, and are described in the NRC Region I Inspection Report which is

enclosed with this letter. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, excellent implementation of radioactive

liquid and gaseous effluent control programs performed by the Chemistry

  • Department was observed.

In addition, we reviewed the progress being made by

your staff to resolve problems with the radiation monitoring system (RMS) and

with the air balance in the Fuel Handling Building and the Auxiliary Building.

We will continue to follow your resolution of .these issues.

No radiological

safety concerns or violations of NRC requirements were observed.

Your cooperation with us in this matter is appreciated.

Docket Nos. 50-272

50-311

9411220055 941115

PDR

ADOCK 05000272

0

PDR

Sincerely,

Original Signed By;

James H. Joyner

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards *

OFFICIAL RECORD COPY

'

_,

, __

Mr. L. R. Eliason

2

Enclosure:

NRC Region I Combined Inspection Report Nos. 50-272/94-28 and

50-311/94-28

cc w/encl:

J. J. Hagan, Vice President-Operations/General Manager-Salem Operations

S. LaBruna, Vice President - Engineering and Plant Betterment

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

R. Hovey, General Manager - Hope Creek Operations

F. Thomson, Manager, Licensing and Regulation

J. Robb, Director, Joint Owner Affairs

A. Tapert, Program Administrator

A. Giardino, Acting Manager, Quality Assurance

B. Hall, Acting Manager, Nuclear Safety Review

R. Fryling, Jr., Esquire

M. Wetterhahn, Esquire

P. J. Curham, Manager, Joint Generation Department,

Atlantic* Electric Company

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

State of New Jersey

State of Delaware

O?FlCiAL RECORD COPV_.

Mr. L. R. El i a son

3

Distribution w/encl:

K. Abraham, PAO (2)

PUBLIC

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Region I Docket Room (with concurrences)

Kay Gallagher, DRP

Distribution w/encl: (Via E-Mail)

L. 01 sh an, NRR

W. Dean, OEDO

J. Stolz, PDI-2, NRR

M. Shannon, ILPB

M. Callahan, OCA

DOCUMENT NAME:

A:942828.SAL

To receive 11 copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE

RI:DRSS

NAME

Jang

DATE

11/ {) /94