Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18139A505 + (02:24:28, 6 January 2025)
- ML18139A503 + (02:24:33, 6 January 2025)
- 05000280/LER-1980-014-03, /03L-0:on 800816,w/reactor Critical,Discovered Level in Refueling Water Storage Tank & Cat Below Min Set by Tech Specs.Caused by Excessive Makeup to B SI Accumulator W/O Refilling + (02:24:37, 6 January 2025)
- 05000280/LER-1980-055-03, /03L-0:on 800816,during Performance of PT 15.2, MOV-FW-151A Failed to Indicate in Closed Position. Investigation Showed Valve in Open Position.Probably Caused by Mechanical Failure of Valve Operator + (02:24:42, 6 January 2025)
- ML18139A499 + (02:24:43, 6 January 2025)
- ML18139A498 + (02:24:44, 6 January 2025)
- ML18139A497 + (02:24:45, 6 January 2025)
- ML18139A495 + (02:24:46, 6 January 2025)
- ML18139A494 + (02:24:46, 6 January 2025)
- IR 05000280/1980026 + (02:24:48, 6 January 2025)
- ML18139A491 + (02:24:49, 6 January 2025)
- ML18139A490 + (02:24:50, 6 January 2025)
- ML18139A488 + (02:24:51, 6 January 2025)
- ML18139A486 + (02:24:52, 6 January 2025)
- ML18139A483 + (02:24:53, 6 January 2025)
- ML18139A484 + (02:24:53, 6 January 2025)
- ML18139A482 + (02:24:57, 6 January 2025)
- 05000280/LER-1980-041-03, /03L-0:on 800625,pipe Stress re-analysis Indicated Baseplate Anchor Bolts on Hanger H-2 on Line 12 Inch -CC-27- 121 & Hanger H-9 on Line 12 inch-CC-33-121 Overstressed. Mods to Anchor Bolts Complete + (02:24:59, 6 January 2025)
- 05000280/LER-1980-043-03, /03L-0:on 800703,during Normal Operation,Condenser Inlet Valve MOV-CW-106C Would Not Close When Operated from Control Room.Caused by Broken Studs Allowing Motor Stator to Back Out + (02:25:01, 6 January 2025)
- ML18139A478 + (02:25:02, 6 January 2025)
- ML18139A470 + (02:25:02, 6 January 2025)
- ML18139A469 + (02:25:03, 6 January 2025)
- ML18139A468 + (02:25:08, 6 January 2025)
- PNO-II-80-098, on 800603,unit Tripped When Fire Disabled One of Four Instrument Buses.Plant in Hot Shutdown While Licensee Replaces Transformer & Dilutes Boron Concentration for Restart.Licensee Issued Press Release + (02:25:13, 6 January 2025)
- ML18139A465 + (02:25:14, 6 January 2025)
- ML18139A464 + (02:25:18, 6 January 2025)
- ML18139A460 + (02:25:20, 6 January 2025)
- ML18139A459 + (02:25:23, 6 January 2025)
- ML18139A458 + (02:25:24, 6 January 2025)
- ML18139A457 + (02:25:25, 6 January 2025)
- ML18139A456 + (02:25:26, 6 January 2025)
- ML18139A455 + (02:25:27, 6 January 2025)
- 05000281/LER-1980-008-03, /03L-0:on 800623,while Performing Periodic Test 26.1,found Air Ejector Monitor Alarm Setpoint Above Tech Spec Requirement.Caused by Instrument Drift.Alarm Setpoint Recalibr + (02:25:28, 6 January 2025)
- 05000281/LER-1980-008, Forwards LER 80-008/03L-0 + (02:25:30, 6 January 2025)
- ML18139A451 + (02:25:31, 6 January 2025)
- ML18139A449 + (02:25:32, 6 January 2025)
- ML18139A448 + (02:25:33, 6 January 2025)
- ML18139A446 + (02:25:33, 6 January 2025)
- ML18139A445 + (02:25:34, 6 January 2025)
- ML18139A444 + (02:25:36, 6 January 2025)
- ML18139A443 + (02:25:37, 6 January 2025)
- ML18139A442 + (02:25:38, 6 January 2025)
- ML18139A441 + (02:25:39, 6 January 2025)
- ML18139A440 + (02:25:42, 6 January 2025)
- IR 05000280/1980016 + (02:25:45, 6 January 2025)
- ML18139A438 + (02:25:47, 6 January 2025)
- ML18139A436 + (02:25:50, 6 January 2025)
- 05000280/LER-1980-039-01, /01T-0:on 800626,potential Discovered for Boron Concentration Nonconservatism During Dilution Accident W/Rcs at Reduced Vol.Analysis of Boron Dilution at Cold & Hot Shutdown Being Evaluated by Reactor Vendor + (02:25:52, 6 January 2025)
- 05000280/LER-1980-039, Forwards LER 80-039/01T-0 + (02:25:54, 6 January 2025)
- ML18139A430 + (02:25:56, 6 January 2025)
- ML18139A427 + (02:25:57, 6 January 2025)