Forwards IE Insp Repts 50-280/80-26 & 50-281/80-29 on 800709-10.No Noncompliance Noted
ML18139A491
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/05/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18139A492 List:
References
NUDOCS 8009180148
Download: ML18139A491 (2)


See also: IR 05000280/1980026

Text

In Reply Refer To:

RI *

-280/80-26

-'*""'50"=2's"1/80-29

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

AUG O 5 1~80

Virginia Electric and Power Company

ATTN: J. H. Ferguson

Executive Vice President-Power

P. 0. Box 26666

Richmond, VA 23261

Gentlemen:

  • ""?'} *--~-.:;d-* -. ----- -** !__

-

~d~

)

This refers to the inspection conducted by R. M. Compton of this. office on

July 9 through 10, 1980 of activities authorized by NRC Operating License Nos.

DPR-32 and DPR-37 .for the Surry facility, and to the discussion of our. findings

held with J. L. Wilson at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

en~losed insp~ction report .. Within these areas, the_i~spection consisted of

selective examinations of.procedures and representative *records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported unre-

solved items. The status of these items is discussed in the enclosed report:

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that .you make a written application within 20 days to this office to

withhold such information from public di1?closure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the repor-t will be placed in the Public Document Room.

  • 880~1,'0. ll/i

cp

,,

.. _________ ,. _____ .. ___ . _,. ........ ____ ---* .......... ___ ._ ...... ...

.. - : - *' -~ .... _ .

AUG O 5 1980

Virginia Electric and Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

~hem with you.

Enclosure:

Inspection Report Nos. 50-280/80-26

and 50-281/80-29

cc w/encl:

J. L. Wilson, Manager

Sincerely,

Y,~

I

Murp

Reactor Construction and Engineering