.,.l VIRGI~i:A ELEbTRic AND PowE:i:t CoMPANY RICRMON:i>,V:i~GINIA 23.261 July '.14, -.19ao*

  • t.~r..

-~'L.

tt~ *T!..:-iiler~ D11;e(-:tor.*

rn:::~~:c.0.of )'~nao*c--**-n~* c,-(~

1.1:: ~b *""".,

.:.*~~~-.,t* *~*:-~t<-7 c*_i..-

_":"-5:.l J.

... J._o~,r~ttl.. t,;::\\L/"'*-*"

l~."

t)~-

-1~uc ltiar.. *-x~~eg-tl1a.to_iy. *co*rd1.1i.ss:ich wa~3hingt.;;t, D~ c~

20555_:

. SC-:r:ial: tfo;,, 6 LL lJO/RI IT: bz,\\;

    • r1o~k.et Eos.*'"....50-2~*0 5C~2~L
  • _ LiC¢ns<:.~ !~fo*s*:.* iJP1~...:3:i

.. DPR,;..37

  • )<'.nclosed* :i.s. the Monthly-Operating R::fr;ort foz ~*surr.y _

f'ow~r Statton Unft*

Nt1s.

  • 1* and.2_ [Or,the uonth of*....iu*ne.>1Q8(J.
  • .. * *" ""~f.2t:*y

~-r.~;--~]_y* :yotrr~~, *

  • -* / **:}:~riginal**:S.1g~ed.. Ey
/B.-~ *.a. *. SYLVIA.
.B *.. :R, *Sy°Jv,la

~..

. f./.

~.

1 <~

cc:** Hr.* 111.'ctor *stt-.:11.o;.*/~ir~ctbr, (lq:.¢.op:i(?.8*)

Off Jee* ot* InspE:~ctfon* and. Enfc)rc<in!ent

  • , ~.'.

~"Ir>.Tat;ies P; ovRei~iY.,. :61.:ie.~*tor. (l *copy)._

  • - Offic~.pf. Irisrec_ticn.* a:n<l:. Enforce.t'1srit* :.;..:. i'<.egion II.

... ".?

/16>o:i

'1/1

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VJRGIN.IA 23261 July 14, 1980 Mr. N. M. Haller, Director Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Haller:

Serial No. 613 NO/RMT:baw Docket Nos. 50-280 50-281 License Nos: DPR-32 DPR-37 Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. 1 and 2 for the month of June, 1980.

Very truly yours,

/Yl)(/_e__~

B. 7s;;:via Manager-Nuclear Operations and Maintenance Enclosure (3 copies) cc:

Mr. Victor Stello, Director (10 copies)

Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy)

Office of Inspection and Enforcement - Region II

    • 1

~\\

VIRGINIA ELECTRIC A..."l\\fD POWER COM.PANY SURRY POWER STATION MONTh"'LY OPERA.TING REPORT REPORT NO. 80-06 JUNE, 1980 APPROVED:

HA.i"\\fAGER

i CONTENTS Section Operating Data Report - Unit #1 1

Operating Data Report - Unit #2 2

Unit Shutdowns and Power Reductions Unit t,t1 (Corrected Copy) 3 Unit Shutdowns and Power Reductions Unit /fl 4

Unit Shutdowns and Power Reductions - Unit #2 5

Load Reductions Due to Environmental Restrictions Unit #1 6

Load Reductions Due to Environmental Restrictions Unit #2.

7 Average Daily Unit Power Level Unit #1 8

Average Daily Unit Power Level - Unit #2 9

Summary of Operating Experience 10 Amendments to Facility License or Technical Specifications 11 Facility Changes Requiring NRC Approval 12 Facility Changes That Did Not Require NRC Approval 12 Tests and Experiments Requiring NRC Approval 14 Test and Experiments That Did Not Requi;r:e NRG Approval 14 Other Changes, Tests and E..xper:i;ments 15 Chemistry Report 16 Description of All Instances Where Thermal Discharge Limits 17 Were Exceeded Fuel Handling 18 Procedure Revisions That Changed the Operating Mode Described In 20 The FSAR Description of Periodic Tests Which Were Not Completed Within The 21 Time Limits Specified In Technical Specifications Inservice Inspection 22 Reportable Occurrences Pertaining to Any Outage or Power Reduct::ions 23

Maintenance of Safety Related Systems During Outage or Reduced: Power 24 Periods - Unit #1 - Mechanical Maintenance

ii CONTENTS Section Maintenance of Safety Related Syste...lls During Outage or Reduced Power Periods -

Unit #2 - Mechanical Maintenance*

Maintenance of Safety Related Systems During. Outage or Reduced Power Periods - Unit #1 - Electrical Maintenance Hairitenance of Safety Related Systems During Oute..ge or Reduced Power Periods -

Unit 112 - Electrical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit /fl - Instrumen.t Mainten~nce Maintenance of Safety Related Systems.During* Outage or Reduced Power Periods -

Unit #2 -

Instrument Maintenance Health Physics Summary Procedure Deviations Reviewed by Station ~uclear Saf ecy and Operating Committee After Time Limits Specified in T.S.

26 29 31 34 36 38 39

1 -

O?ERl-.IING DATA RE?ORJ....,

DOCKET NO.

50~280 DA'l'E 02 JUL 80 COM?LETED BY SUE D. DUNN

'J.'ELE?HONE 804-p35.J.,3184 O?ERA'l'ING ST A!I'US

1. i.JNIT NAME
2. RE?OF.TING ?ERIOD
3. Ll*':ENSED 'l'HERMAL POWER (UWT)
4. N.A'dEPLATE RA'J.'ING (GROSS M</E)
5. DESIGN ELECTRIC.4L RATING (NET MWE)
6. MAXIMUM DEPENDABLE C-4?A:::ITY (GROSS MWE)

. 7. Mfi.XIMUM DEPENDABLE CAPACITY (NE'l.' Mf'i'E)

B. IF CHANGES OCCUR IN CAPACITY R.4TINGS (J'.I'EMS 3 THROUGH *7) SINCE LAST RE?OiQ'. GIVE RE!<SONS SURRY UNIT 1 60180 TO 63080 2441 1****~*W**~*-~****qu~~~**1 847.5 !NOTES 822 l

740 104 M.4XIt*H!M DEP. C!iPACITY(GROSS+NET)

RATING CHANGED WE TO L.. 3 BLADING:

Ht:MOVED FROM BOTH LI.? ROTORS.

9. pQ,./E'R LEVEL TO WHICH RESTRICTED. IF fl.NY N /A (NET M~lE)
10. R~t.SONS FOR RES'I'RICTIONS *.IF ANY NfiA

'.!.'HIS MONTH YRr:'.I'O~D.4TE CUMTJLATIVE

  • 11. HOURS IN RE?ORTING PERIOD
12. NUMBER OF HOURS REACTOR W.4S CRITICAL
13. RE.4CTOR RESERVE SHUTDOWN HOURS
14. HOURS G&NER/..l'OR QN.,LINE'
15. UNIT PESERVE SHUTDOWN HOURS
16. GROSS TfiERN..4L ENERGY GENt.."'RATED (Mi./H)
11. GROSS i::LECTRICAL ENERGY GENERA'TSD (tef"wH)
18. NET ELE:CTRICAL ENERGY GENErrATED (lef'wH)
19. UNIT SERVICE FACTOR
20. UNIT h.V AILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NE'T)
22. uND.

1 CAPACl'l'Y FAC'l'OR WSING DER NET)

23. UNIT PORCED OUTAGE RATE
24. SHU'l'DOi/l'*iS SCHEDULED OVER NEXT 6 MONTH$

(TYPE.DATE.AND DURA'I'lON OF EACH)

25. IP SHUT DOi/N A'l.

1 END OP RE'POJ?I PERIOD.

ES'l'lM.fi!l'E DATE OF S'l.'ARJ'UP

26. TJNI'l'S IN 'l'EST STATUS

(?RlOR TO COMM8RCIAL OPERATION)

INI'J.'IAL CHl'J.'ICALITY lNl'.l'lf..L ELECTRIClTY C0!1NJ::HC1Ai.J UPl!:RATION no.a 4367.0 6595LO

105.1 2209.:f 40961. 3 o.o 182.5 3:J31.5

"/01() 5 2193.1 40098.1 0.0 183.S.

3136.2 1693185.0 5268805.* 0 929836:]1.0 501900. 0 1531.460.0 30311958.0 4'79886. 0 15L~58 86. 0 2SF72"785.0 91.4 cfc 50.2 cfo 60.8 o/c 91.4 c/o 54.4 c/o 66.5 c/o

94. 7 °/ 0 50.3 c/c 62 *. 0 c!o./

81.1 c/c 43.1 o/o 53.1 o/o 2,6 o/o 83.6 c/o 46.1 c/o os"1s~so 0 SIG RE?LACEMENT OU1'AGE REFUELING

<;; 1 YEAR.

E'ORECAST ACHIEVED

OPER.4'1.'ING Dld'A REPOR'l.'

OPERA'I.'ING STATUS

1. UNI1' NAME
2. RE?OPJ'IA'G PEP.IOD DOCKET NO.

DA'I!E COM?LE'.i.'ED BY TELEPHONE

~. LlCt:NSt:D THERMAL POWER (M'r/T)

4. NA11E?LATE RATING (GROSS !dWE)
5. DESIGN ELECTRICAL RATING (NET MWE)
6. M.4XIMU!d DEPENDABLE C.kPACITY (GROSS l.fllE)
7. M/,iIMiJM DEPENDABLE C.4P.ACITY (NET MWE)
8. IF CH.4NGES *OCCUR IN CA?ACI'l'Y RATINGS (ITC.'MS 3 THROUGH 1) SINCE LfiST RE?O[{f. GIVE P.EASONS so,,2s1 02 jUL BO SUED; DUNN 8Q4.. 35J"3184 SURRY UNIT 2 60180 TO 63080 2441 1***V**~**~*-~******~*0**1 g4:7. 5 I NOTE'S I.

s22 I

I s11 I

I Fl 5 I ; 1 * ;" *1'.-.,. *'.,. f- ~ 1-.r-i,,, **"'I* t -**tr 1-.'* I NIA

9. ?OwER LEVEL 'J.'O miICH RESTRICTED. IF ANY NIA (NET fl-ME)
10. REASONS FOR RES'J.'RICTIONS. IF ANY N f A
11. HOURS IN F.EPORfING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON..,LINE 1.5. UNIT RESERVE SHUTDO~IN HOURS
16. GROSS THERMAL ENERGY GENERA.TED (MllH) 1 'l. GROSS ELECTRICAL ENERGY GENERA.TED (MWH)
  • 1 ~

~!:l. NET ELECTRIC.4L ENERGY GENERATED (l.fwH)

19. UNIT SERVICE FACTOR
20. UNI'l.' AV /..ILABIDITY FACTOR
21. UNIT C.4PACITY F'ACTOR (USING MDC NET)
22. UNIT CAPACI'J.'Y.FACTOR (USING DER NET)
23. UNIT FORCED OU? AGE RA'l'E
24. SHU 1.l'DOf/NS SCHEDULED OVER NEXT 6 MON'l.'HS lTYPt;.Dl/1'8.AND DURATION OF EACH)
25. IF SHUT DOWN AP END OF REPORI' PERIOD.

ESTIMATE DATE OF STARTUP

26. UNITS IN J.'EST STATUS (PRIOR 'I.'0 COMMERCIAL OPERATION)

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCifi.L OPERATION THIS MONTH YR~TO~DATE CUf~JLATIVE no.o 4367.0 62831. 0 0.0 0.0 34499.9 0.0 o.o o.o 0.0 d.o 33996. 2 0.0 0.0 0.0 o.o 0.0 :/9194083.0 o.o o~o 25868.S!.}4.0 o.o o.o 24536505.0 0.0 0.0 54.1 r.f 0 0.0

{). 0.

54.1 *>/ 0 0.0 o.o 50.4 o/o 0.0 o.o 4'7.5 o/o 0.0

0. o.
20. ;1 0;. 0 7/10/80 FORECAST ACHIEVED
  • N11.

D:ll c 80-7 5-1-80 80-8 5-11-80 80-9 5-12-80 1-: forcctl S: Schrtlulc<l

('1/77) CORRECTED COPY UNIT SllUTDOWNS AND POWEil REDUCTIONS REI'OHT MONTll Mb.Y.. J <mo c_

v

'f, ;;

~

p,

~

... ::i

l :i:

~

Cl -

cG 260.9 D

1 F

1. 9 G

3 0

G 4

Reason:

/\\-Equipmcnl Failure (Explain)

B-t'>-bintcnancc or Test

  • C*Rcrucling D-Rcgulalory Rcstriclion Lli.:wscc Evc.:111 Rcporl U 80-018 E*Opcralor Training & License Examinaliun F*Ad 111! nlsl ra I ivc G-Opcratiunal Errur (Explain) 11-0lhcr (Explain)

J Method:

I -Manual 2-Manu<il Scram.

3-Auturnat ic Scram.

4-0lhcr (Explain)

IXJCKET NO.

UNIT NAME DATE COMPLETED BY TELEPllONE

'i0-28..._ __ _

_$.11rry Uu..L~

~4-1-9~

Sue D. Dunn (80!1) 357-3184-('a11~c & \\ilrrci.:I ivc

/\\c1iim 111 Prcvc111 ltc1:1lrrt:nl'e Continuation of shutdown for piplng restraint modification and turbine rotor inspection which began 2-19-80.

Reactor trip caused by feed flow/stenm flow mismatch with Lo S/G level signal while feeding S/G's in rnanua~ durlng escalation of power Inadvertent boration of primary system when "n" mixed bed dernineralizcr wns placed in service without verifying boron concentration oE effluent wns equalized with primary system boron concentration.

Ino<lvertant boratlon caused 6¢ to remain outside target band for greater than one hour 111 n i4 hour period necessitating power re-

,i,,,... t* -1..,n t-n < 'illJ_pow.c..LJ.1.il.t:iLl,kL_l'ZJ_tlLi.11 __

target ban~l for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Exhibil G

  • l11:.lrlll'litH1~

rllr Prrpa1a!i1111 11f D:ita Entry Sheets rur Licc11ser Event Rcpllrt \\l.Elti Fili* (Nl!IU c; 01(,\\)

E:-1\\iibit I* s~111r Suur,*1*

N11, Date 80-10 6-3-80 f-: Forced
  • s: Scheduled (IJ/7.7) UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH JUN:f., 1980 Lic:ensee E'lenl Report #

F 18.5 A

3 80-29/03L-0 Reason:

A-Equipment Failure (Explain) 13-Maintenancc or Test C -Refueling D-Rcgulatory Restriction E-Opcratnr Training & License Examination f--A<lminist rat ivc G-Operational Errur (Explain)

II-Other (Explain) 3 Method:

1-M:rn ual 2-Manual Scram.

3-Autumatic Scram.

4-0ther (Explain)

DOCKET NO.

50-280 UNIT NAME DATE COMPLETED BY TELEPHONE St.1rry UNIT 1 July 7, 1980 Sue D. Dunn J]Olt) 357-3184 Cause & Corrccl ivc Adion to Prevent Rccu rrence Experienced a turbine runba.ck, reac-tor trip-turbine trip and safety injection initiation upon loss of power to the I-IV Vital Bus.

Th~

loss of the I-IV Vital Bus was cnused by an** electrical fire in the sola transformer supplying pow-er to it.

4 5

Exhibit G *Instruct inns for Preparation of Data Entry Sheet~ ror Lkcnscc Event Report (LER) File (NUREG*

0161)

Exhibit I *Same Soun:l'

No.

Dale 80-6 6-1-80 2

F: Forced S: Scheduled (lJ/77) 5 UNIT SHUTOOWNS AND POWER REDUCTIONS REPORT MONtil jtJNtL t 980

<U

0.

I-s 720 Reason:*

D 1

A-Equipment Failure (Explain) 13-Maintenancc of Test C'-Refueling D-Regulatory Reslriction Lkcnscc Evcn,I Reporl /l E-Operatnr Training & License Examination r -Administrative G-Opera tional Error (Explain) 11-0lher (Explain)

~1cthod:

I -Manual 2-Manual Scram.

3-Automatic Scram.

4-0thcr (Explain)

DOCKET NO.

50-281 UNIT NAME Surry_UfilT_l___

DATE July_7, 1980 COMPLETED llY rSk 0

1e.~

3

  • ~

5

~U, 7

.~D 3

J1 1~

8 4

TELEPHONE 1.8v1J.:

Cause & C'orm:I ive Ac.:I ion tu Prevent Recurrence Continuation of shutdown for refuel-ing and steam generator replacement, which began on 2-4-79.

Work still underway on piping restraint modi-f icntJons required prior to unit

recovery, 4

Exhibit G

  • lnstrut:tions for Preparation of Data Entry Sheets for Lkcnscc Event Report (LETO File (NUREG-0161)

Exhibit I

  • Same Sllllfl.'.~

LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. 1 MONTH:

J!UNE, 1980 DATE TIME HOURS LOADz MW REDUCTIONS 2 MW MWH.

REASON No tie during this re pc rting p.ei: :Lado MONTHLY TOTAL LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. 2 MONTH:

JUNE, 1980 DATE TI11E HOURS LOAD, MW REDUCTIONS, MW REASON Ncne during this repbrting peJ iod.

MONTHLY TOTAL

MQifll:

JUNE

~o 1

2 3

4 5

6 8

9 10 11 12 13 14 15 AVERAGE DAILY POWER LEVEL (MWE01NET) 660.9 6J'0.3 6 0. 0 6 ~2. 3 619.2 616.0 686.6 691. 9 695.8 695.4 694.4 693.9 693.3 686.9 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS

~CKET NO W

UNIT 50.. 2so SURRY I DATE J,,1... so COMPLETED BY SUE D. DUfilf:

DAY 16 11 18 19 20 21 22 23 24 25 26 28.

29 30 AVERAGE DAILY PO~ER LEV" (MWE~NET) 688.l.

695.1.

692.1 694.1 695. 3; 690. 0' 681.B'*

690.1 6 91. l' 690.0 689.1 688.1 ON THIS FORM. LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWEnNET FOR EACH DAY IN THE REPORTING MONTH. THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH R:EP.ORT9:1 ING MONTH. NOTE T#AT BY USING MAXIMUM DEPENDABiE CAPACITY FOR THE NET ELECTRICAL RATING OF THE UNLTq THERE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER EXCEEDS THE 100 °/ 0 LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES., THE AVERAGE DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT A:tJOMALY

e 9 -

e DOCKET N.0 50..,281 UNIT SURRY II DATE 1.1,,so COM?LETED BY *-sue n. :Dwm n~~Rh~~ R~lL~ ~Mli EQ~~E L~~~k fl. Q. !l.1!. Ii :

JUNE 80 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVE DAY (MWE.. NET)

DAY (MWEr.1NET) 1 o.o 16 o.o 2

o.o 1 i1 o.o 3

0.0 18 o.o 4

0.0 19

0. 0 '

5 o.o 20 o.o 6

o.o 21 o.o

7 o.o 22 o.o 8

o.o 23 o.o 9

o.o 24 o.o 10 o.o 25 o.o

_I 11 o.o 26 o.o 12 o.o 21 0.0 13 o.o 28 o.o 14 0.0 29 0.0 15 o.o 30 o.o DAILY UNIT POWER LEVEL FORM INSTRUCTIONS ON THIS FORM. LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWE*NET FOR EACH DAY IN.

THE REPORTING MONTH. THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORT~

ING MONTH. NOTE THAT BY USING MAXIMUM DEPENDABLE CAPACITY FOR THE NET ELECTRICAL RATING OF THE UNIT. THERE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER EXCEEDS THE 100 o/o LINE (OR THE RESTRICTE~-POWER LEVEL LINE). IN SUCH CAS~S. THE AVERAGE DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY

10

---~-

.UMMARY OF OPERATING EXPERIENCE JUNE, 1980 Listed below in chronological sequence by unit is a summary cf operating experiences for this month which required load reductions or resu:J..ted in sign-ificant non-load related incidents.

UNIT 1 June 1 June 2 June 3 June 4 June 30 IBUT 2 June 1 June 30 This reporting period begins with the unit at reduced power (97%) due to sodium carryover in the main steam system.

Increased reactor power to 98% at 0135.

Increased reactor power to 100% at 1345.

Experienced a turbine runback turbine trip reactor tr:itp and safety injection (SI) actuation at 0004.

The cause of the abtove trip and SI was an electrical fire in the sola transformer supp,1ying Vital Bus I-IV, Lost power to Vital Bus I-II at 0015 while at~empting to parallel BUSSES I-II and I-IV.

This resulted in a re-initiation of the SI system.

Returned the vital busses to narmaJ!. at 0944 with Vital Bus I-IV supplied by a sola transformer and Vita.l Bus I-II supplied from an inverter.

The reactor was taken cri~"ical at 1422 and the turbine generator was on the line at 1836.

The unit r.eached 100% power at 0600.

This reporting period ends with the unit at 100% power-This reporting period begins with the unit at cold shu:t:dawn with maintenance, piping.restraint modifications and design: changes continuing.

This reporting period ends with the unit at cold shutaown with maintenance, piping restraint modifications and_ desigµ.. changes continuing.

11 -

AHEIID?l!

TO FACILITY LICENSE OR TECHN-L SPECIFICATIOUS JUNE, 1980 None during this reporting period.

F AGILITY CHANGES REQUIRIUG,A NRC APPROVAL W

JUNE, 1980 None during this reporting period.

FACILITY CHANGES THAT DID NOT.REQUIRE NRG.APPROVAL;_

The following facility changes were implemented during the mo-.nth of June:

Design Changes

1.

DC/77-27 Installation of Sight Glasses in RCS High Point Vent Snool Pieces Unit 1 & 2 This change -entails _the installation of sight glasses which will allow the operators the opportunity to determine more readily when the RCS loop is full and free of any air or entrapped g~sses.

Sunnnary of Safety Evaluation

[

During full-power or hot shutdown cond.itiOns this modification;- will have no effect upon the plant or any safety related equipment. At cold shutdown the safety margin is enhanced along with the reliability of the RCS vent system.

2.

DC/78-09 Domestic Water and Drains SGR Decon Building 1 & 2 This modification adds domestic water to the new decon. building and pipes waste ~ater from sink and shower drains to the contaminated waste drains permitting the use of this building for decontamination of containment workers during steam generator outages.

Summarv of Safety Evaluation No changes to Technical Specifications or the F.S.A.R. are precipitated with this design change.

3.

DC/78-30 Security System Tie-in at 480V Load Center 1 & 2 This design change provides for the security system requirements by using the 480V load centers to supply the electrical needs.

Sinc.e the loads were notl-s-c::.£-ety-related they are fed from normal load centers.

Summary of Safety Evaluation This modification will* not affect the station op*erators on: the operation of any safety related equipment.

  • ,***. Far;:ility Changes That D'Not Require NRG Approval (Cont.ed)
4.

DC/79-S22 Containment Sump and Steam Dump Isolation on SI Unit 1 & 2 This modification changes the actuation of TV-MS-109/110/209/2,0 from CLS Hi Hi to Safety Injection.

To prevent possible contamination of Secondary systems and hot-well in the event3 of major tube leakage.

Summary of Safety Evaluation This design change improves the containment isolation system and will further enhance safe operation of the plant.

5.

DC/80-41 Instrument Air/Service Air Soft Seated Valves This design change replaces the present bronze to bronze seated valves with those of bronze to composition surfaces in an effort to reduce the leakage problem previously experienced.

Summary of Safety Evaluation The replacement valves are of superior quality and weigh less than those originally installed.

In this case the safety of the system will be enhanced and the seismic load-ing of the lines will be altered conservatively.

J

TESTS AND EXPERIMENTS REQUIRING NRC APPROVAL

~

_JUNE, 1980 None during this reporting period.

ST-78 TEST AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL UNIT 2 Engineered Safety Features Functional Test was completed on June 12, 1980.

This test performed a system-level initiation of the ESF systems as near emergency conditions as practicable.

Function of actuated equipment was demonstrated along with emergency power supply load capacity.

9 OTHER CHANGES. TESTS AND EXPFTS JUNE, 1980 None during this reporting per.iod.

-~ '

e SURRY POWER STATION CHErHSTRY REPOR'l; JIINF:

' 19_filL T. S. 6. 6. 3 __ d PRIMARY COOLANT UNIT NO. 1 UNIT NO.

2 ANALYSIS MAXIMUM MINIMUM AVERAGE -

MAXIMUM M~IMUM

AVERAGE Gross Radioact., µCi/ml
5. 77E-1

/,..

i:;Ql<'-?

Ii ? r:;11... 1 f..

i=.Li.1<'-?

?nl<-?

?

M~l<'.?

Suspended Solids, ppm n 1 n.n

n. 1 n 1 n n
    • 2.30E-1 6.20E-1
1. 77E-2 I-131/1-133

.5398

.2678

.3909 Hydrogen, cc/kg 48.2 26.3 39.5 Lithium, ppm

.1. 7*

0.* 21*

0.99 Boron-10, ppm +

70.17*

12.35 22.53 441. 784.

388.668 415: 219 Oxygen:-16, ppm

.ooo

.000

.000 2.8

.1 1.4 Chloride, ppm

<.05

<.05

<.05

<.05

<.05

<.05 pH @ 25°C 7.76 6.50 7.34 5.80 4.75 4.97

+ Boron-10 = Total Boron x 0.196 NON-RADIOACTIVE CHEMICAL RELEASES 2 POUNDS T.S. 4.13.A.g'l Phosphate

-o-Boron 790 Sulfate SJ~

Chromate

.o~

50% NaOH 1050 Chlorine* Remarks: *Added 1700 Q:rams of L.OH to lflRCS on 6-13-80

  • Reflects Boration.that occurred due to l!lRX trip on 6-3-80
    • Reflects 6-3-80 fllRX triP Added 8 Q:allons. of N_H * :between 6-26-80 and 6-28-80 to #2RRR

~ '"I (1)

The*se 1 on,.,1-c

,..,.i=.-.chemicals should ni-<>sent" nn m<dnr ;:idver!'le ~nvirnnmen+-<>1 :;~~... ~-r--_

17 -

DESCRIPTION OF ALL INSTANCE~ERE.

W THERHAL DISCHARGE LHUTS WERE1-cEEnED JUNE, 1980 On June 3, 1980, the temperature change at the station discharge exceeded 3°F per hour when Unit No. 1 reactor tripped on a loss of power to Vital Bus I-IV.

This event was allowable in accordance wit:h Technical Specification 4.14

  • UNIT 1 FUEL HMIDLIHG JUNE, 1980 None during this reporting period.

UNIT 2

. -1'.9' FUEL HAUDLIUG JUNE, 1980 None during this reporting period.

f.

20 -

OCEDURE REVISIONS THAT CHANGED~

ERATING MODE DESCRIBED IN THE WAR JUNE, 1980 None during this reporting period.

I'

.:/ ESCRIPTION OF PERIODIC TESTS H WERE NOT COMPLETED WITHIN THE T IMITS SPECIFIED IN TECHNICAL SPECIFICATIONS JUNE, 1980 P.T. 22.5 Unit 1 & 2 Visual Inspection of Hydraulic Shock Suppressors was not completed an Unit 2 when scheduled (4~3-80). The test requires a visual inspection of 9 snubbers on Unit 2 which have not yet been converted to seal material compatible w"i.th the operating environment every 31 days.

The snubbers were inspected and found operable on May 6, 1980, four days beyond the 25% grace period permitted by Technical Specifica-tion, 4. 0 P.T. 24.4A Unit 1 & 2 Visual Inspections of Hydraulic Shock Suppressors was not completed on Unit 2 when scheduled (5-11-80).

The test requires a visual inspection of 9 snubbers on Unit 2 which have not yet been converted to seal material compatible with the operating environment every 31 days.

The snubbers were inspected and £ound operable on May 21, 1980, three days beyond the 25% grace period permitted by Technical Specifica-tion 4.0 P. T. 34 Unit J. & 2 Visual Inspections of Hydraulic Shock Suppressors was not completed on Unit 2 when scheduled (05-29-80).

The test requires a visual inspection of 9 snubbers on Unit 2 which have not yet been converted to* seal material colllpa:tible with the operating environment every 31 days.

The snubbers were inspected and found operable on June 6, 1980, four days beyond 25% grace period permitted by T1~chnical. Specification 4. 0 *

... *.. -:1

22 e

INSERVICE INSPECTION e JUNE, 1980 Visual inspections on the Unit 1 & 2 hangar modificati9ns and installation are in progress.

23 -

e REPORTABLE OCCURRENCES PERIA ~

~G TO

  • ANY OUTAGE OR POWER REDD IONS JUNE, 1980 None during this reporting period.

24-Maintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT #1 Mechanical Maintenance l

25-No maintenance was performed on safety related systems during outages or reduced power periods.

26.,.

Maintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT 112 Mechanical Maintenance

Dff'J':Mf;Gf/

1 JUL 80

  • 10:59 AM l'AGF.' 1 UNH'2* 1,(01)00 (MA1N7'SNANCF,' OE' SM'F.1'Y m:J,A'l'IW SYS7'f,'MS VURlNG OU1'AGr: OR /lf,'llUCt"LI f'OWl'.'ll ffHJOIJS)

Hr:1'Sl'.'/iVl11' SYS COMP HARKNO SllMMAh'Y WKl'f,'Rf u

f.111 7'01'/JWN1'M I

06/021ao 1NS1'R f/CVr2936

!JI APllRAM llUP1'UR8 Sl R1i:PLACE lib'GULliTOll 2

0011161131 101t OG/03/BO HI l'UMP 2*l'W'*P*3A OTJ7'BOAUD PACKING Lf.4K 1NS1'ALf.J-,'V 1'EfLON PACKING 2

0011100*13 2 119 Oo/03/.80 VIRSf;/,

EE'*E'Gw2 7'AKr: /i'F."QIJIFIW llEAlllNG 7'00K

/lf~'IJ/Jl l/1'."1.1 /lf;'ADitVGS 2

005211600 2911 06/011/BO Sl VAl,VE' ltV *2R*15A Vf.'flCU:NCY F'/JNCI/ /,lS1' JU-,'MOV F./.I UAU 2

0021'J1 1111G 1*15 01)/011/.80

/IC VALVE 1SOLA1'10N VAJ,V ES 1*1c1m:Nr:v l'ACKlNG 2

00111G1113 11 116 06/0*l/BO IA rJf'ING 2nI An621 REPAIR BROKEN Alli LINE llEl'AIRW LINE 2

00*12111020 en

.e 06/011/BO RM MONITOR RM259l260 LOW fWW ALARM 1 NS1'Af,LliD Nhll PUMP 2

005050150 552 06)011/60 RS VAJ,VE 2*RS**ll1 REPACK AND CLEAN FIX VALVE ADJ. PACKING 2

00515082/

3 06/o*oeo

/IS VAl,VE 2*RS**l5 Eif.'l'ACK AND CLl'.'AN nx VALVE AV.!. PACKING 2

005150620 3

Oo/.0*1/BO liS V Af,VE 2.115.115 Rf,'l'ACK ANV CLF:AN nx VAJ;vr. AIM. PACKIN<;

2 005150829 3

OCi/011/110 RS VALVE 2.RS. 11"1 REPACK AND CLE'AN E'lX VA/,Vli' ADJ. I'ACKlNG 2

005150030 3

06/011/ao RS VAINE 2nNSn118 Rfl'I'ACK AND cu:AN nx VAl,VE ATM. l'ACJ(J NG 2

005150631 3

01;/0*1/00

/IS V A/,V F, 2.rcs.119 Rf:PACK ANV CLf.'AN FlX VAJ;VE AM. I'ACJ(JNG 2

005150832 3

06/011/RO RS VAT.VE 2*//SnSO REl'AC/( AND CLEAN nx VAi.VE ALIJ. I'ACKING 2

005150033 3

06/0*1/BO RS V/IDVE 2*SRSn52

. Rf."rACK ANV cu:AN E'l X V A/;V F, AM. I'ACKING 2

005151126 3

06/011/BO HS VA/,VE 2nllS"53 Rf.'l'ACK AND CLEAN nx VALVE: AH/. l'ACKlNG 2

005151129 3

06/0 11/00

/IS VALVE 2.Rs.. s*1 lifff'AC K ANL> CLE.4N nx VAl;VE ADJ. I' AC KING 2

005151130 3

06)0*1/RO RS VALl'E 2.11s~ss li'E'F'ACK /,N/.l CLF:AN FIX VALVE ADJ, PACKING 2

005151131 3

06/011/rlO RS MOV MOV*RS~256A ALI<lN f'LANGES I'lfl' f:'J;F,'XI7'AJ;t;IC GASKE1'+BOL7'f.'D Ul' 2

0052110"12 3 tr/

N)

-....J 06/011/80 RS MOV MOV*liSn2566 AJ;IGN f'LANGb'S I'U1' f'J,EXI7'ALLlC lN AND MADE UP f'LNG 2

005240'/211 115 06/0*1/BO

. OS O'l'HER AIR LINf; NO'l' llOOKF,D ur Rb'PLACED AIR UNE 2

0060111159 110 06/0lt/BO vs FIL7'8R 2.vs~F.11 FIW'UIS NEELIS 7'0 BE CllANGED CllANGED E'LL7'b'/IS 2

9082'!01115 66'/3 06/05/60 RC VALVE HCVr2519B 2 80£1.'S MISSING BOL7'S INS1'ALLED 2

0011152235 696 06)05/80 RC TA.NI<.

2*11C~E*2 MANllAY LEAKING REPLACE.'D GASKET 2

0052810115

~6 I'

I 06/05/80 DA VALV8 2*DA.. 200B THIP VALVE llAS BLOCKAGE RF:E'LUSl/Ell LINE 2

006021510 2

05/09/80 frll VALVE I/CV *2142 V Af,V E LEAKS BY RE.'PLACED VALVE INTb'RNAf,S 2

0050112201 152

%/10f80

/IS

/IX 2+RSnEn1B lNS1'ALL RUIJBE/I GASKET IN52'ALUW RUllBE/I GASKE'.l'S 2

0052911101 216 bllh0/60. RS f/X 2*SRS.,En1C INS7'ALL liUBBER Gl.S;'(E'f INS1.'ALLED R/JIJJJ[;'/I GASKETS 2

0052911102 216 06)12/60 EiS PUMP 2.ns~r.2n VEE'lCH'NCY lllNCH LI.52' CllF.:CKE:V READ ou~* ON SllAf2' 2

005291331 3~

061111)ao RS

/IX 2*RS*En1D INS'l'ALL RUBB8R GASKU JN.57'ALLEi1 GASKE2'S+PERFORMED PI' 2

005291 1103 360 06/lll)RO 1.4 Pl PING IA LINE BROKF:N Rb'f-'Al/llW AI/I LINF:

2 006130'!30 30

' I 013/16180 RM I'IJMP RMS*259J2GO REBUIL1.' PUMP llE/Jf/l M' PU/1P 2

006061516

~

06)16/60 VS l'UMI!

1*VS"P*1C

~XCESSIVE.. PACKING LF:AK ON PMP RBl'AlflfW f,F,,~/i

'l 006010130 20 OG)li/60 Cl/

VliLVE li(_:V*21B6 l'ACKING LEAK REPACKF;V VALVE 2

003211201 1q Ofj/.1/)60 RC VAl,V~

f*2*1t25 iSOLATION VALVE'S LEAK Rf.'PA18ELI LEAK 2

00*1111530 6

o6ne~ao f,'E VIESEL EDG*2 CLBA.V 01~ BA1'1f SIGH.'I: GLASSEt; CLF.:ANW FJL'I'ERS 2

0061111300 2i 06/.t9~p9 c11 PUflf' i~fu~r~w.

_f'(!Ml' !!A.5 Sf..'AL

/jf~!l/l R£'PA:ff1F:v ruNP 2

9011191009 8110 oano1ao HS

/IX L'VNNAV2' 9VUE fJllH'h71 M'AK i'ONNTl'CU' 2'/JIJll' ;,il!f;lf.~' MAK MONUOR 2

0031'/Qfj09

~51 06/.20)80 8£1 VALVE E't:*BV*202C 1100'1' VALVt NEEDS REPACIUNG

!iEPlt\\: KF:Ll VADV £'

2 0011101'133 113 06}20)il0 RS l'lF'1NG m;.256A AM HANGER ADJUS'l't'll I/ANGER 2

006111600 21 06)20/..~0 HS l-'1/'lNG irs-2568 AL*,/ HANGf,'R AllJUS2'fl'D llANIJER 2

00&111802 21 06122180 cs PlF'lNG 2"C/kl.:2 Vl.'i(:ONNECT*RF:CONNF..'C2' l/ECONNF,"C7'f;D LINE 2

001t2qo535 305 OG/22/60 cs VAJiVE 2,c5~12

. LEAKS 2'1/ROUGH MPl'lW VISCt-f/E.'l'ACKF:D 2

0050314112 290 o6n_upo 51 l-'MP ~tr!!

2~,sI~P41 l!/V(:OUl'liF; M(f/'QR f(U)l.J i?UN!'- *.

UNCOUI'LF:P ~f0'./'011

2.

QOl.\\1~09~0 2~1 Oli/23/uO cc VA/1Vb.'

llV*l.'Cw21W

£81tf(!i IJY IJUl!i88f.'N/Jf,f,/)f LArrFm VJ;V SEA2'+DISC 2

005030959 153 06/2*1)il0 MS VALVE 2~MS*3'1B REQ liOfiK E'OR Lf:Ali 2'IGl/7'NE:SS VOJLI MR 200G1B0009 COVERS 2'1115 MR 2

0031609011 0

06)211/BO cc VALVE 7'VrC.'C*20!1A lilH l'lLC!./' VLV Nl','8VS CLEANING REPLACJ'.: Sb'A1'S 2

0052015'10 5119 r *i JI u

,;);;..

I~*

DEf'l'=NECll 1 JUL BO UNI7'2* llOUBO (MAIN1'ENANCE OE' SAl:'E'l'Y RfiL!i7'ED SYSTEMS DU/ilNG OU'l'AGB' 011' REDUCED POWER Pt:RIOVS)

TiE1'S/i'RVVT SYS COUP MARKNO SIJHMARlf WKPERE' u

06)211/60 llE COMPRESS 2

COMPRESSOR DOES N01' PUMP RfiPLACEll llEAD GASKfi7' 2

06)25}80 Sl VAi.Vb' 2*81.,119 V Al,V E //AS SCORED S7'EM POLISl/f!,'D SllAF'7' 2

r:

06/25/BO MS VAf,V~:

2.Ms.e-r LAP IN SEA1' LAPPED VALVE l1IS+SEA7' 2

06/25/BO MS VAT.VE 2*MS*120 LAP IN SEA'l' LAI'Pf:D/MACllINE DISC+S/i'A1' 2

06!25/~0 MS VALVE 2*MS*15B LAI' IN SEA1' LAPPELl+MACHINE DISC+SB'A7' 2

06/25/80 MS VAl~VE 2*MS*3'18 LAP lNSE.47' SEA7.'+DISC WAS LAPPED 2

06/25/60 f W VALVE 2*Hl*23B lil':PAIR llANDW//EEL AND S1'EM REPf,AC/W GASKF.'l' 2

06/25/BO CH VAJ;Vb' 2*C//.,191 GRINNEL VA[,V/i,' LfiAKS

  • COMPJ~E2'ED 2

06)25/80 Cll VALVE:

2nC//n189 GRINNB'L VALVE L8AKS COMT'f,F,'.f'IW 2

06/25/80 RS

/IX 2*RS~E*1A ll0L7' Nli'IJDS 2'IGll'l'EN

'l'IGll1'b'N BOL2' 2

06/25/90 SI/

PIPING 2.sw.5*1 BOW' MISSING REPLACED UOLT 2

05/25/BO 51./

VALVE 2*SW*68 S1'b'N /If!, N'l' S1'RAIG//2'1i'NELl S'l'EM 2

f' 06/25/80 CH MOV MOV *SI.. 2 2'10/l PACKlNG L!i'AKS AL1JUS1' rACKING 2

05}26/dO Sl Pl PING 2*SI*32 U UOW' DI/OKEN COMPLE1'ED 2

06)26}90 CH VALVE FCV42113A PACKING LEAK A7' VALVE ADJUS'l'l!.'D PACKING 2

f' 06f26/80 SI VAE 2*SI*112 PACKING Lf,'AK COMl'LE1'ED REPACKF.D VALVE 2

06/26/RO SI VA/,VE' 2nSI*111 PACKING LF:AK COMPLE1'ED li't:PACKED VALVE 2

05/26/BO SI VALVE 2*SI*101 PACKl'NG LEAK REMOV!!.'D oi PACkiNG+REl'LACED ili'.i'li NEY 2

('

oGnGJBO SI VAf,Vf.'

2.sr.121 PACKING LEAK R!i'PACKED VALVb' 2

06/.26/80 SI VALVAE 2*Sh116 rACKING LEAK REPACKED VALVE 2

06/25/80 RS PUMP 2*RS*P*1A llISCONNEC7' PUMP COUPLING R/!.'INS7'ALT.ED PUMP 2

(

06/.26/80 RS F'UNP 2~RS11Po1B DISCONNb'C7' PUMP COUPLING RE'INS1'AL1k:D PUMP 2

. 06/26)00 51{

VALVE MOV*SW*205A

... LEAKS 'J.'HROUGH AL'JUS1'1i'D SEATS TES2' SA7' A7' IJ5PSI SA7' 2

06/26}90 MS VALVE 2nMS.,3n LAP IN Sf;A1' ALL INSPECT ION WERE SA7'1Sf:'AC7'0RY 2

f' 06/26/90 CH PUMP l*Cll*PPW WILL NO'l' £1f!,'VE'LOP llEAD REINS7'AUBIJ l'Ul4f' IN S'IS1'EM 2

OG/26Jd0 BR YA[,V8 llCV*BRn106A f{f,'PAIR F.'LANGf','

NfJI f'LANGt' GASK/!.'T+l'ACKING 2

OG/.26/BO IA v A1;n*

NOUN7' SOLf,'NOW VALVES INS2'AJ;r, VAJ;VE ON llANGB'l/S 2

f*

06t26/00 Cl/

VALVE:

2*Cll~6B REPLACE Dllil'llRAGM REPLACF;D BONNb'l' ASSEMBU:Y 2

OG/2/180 81 YAI;VE' 2*SI*B6 PACKING LF:AK REPACKED VALVE:

2 06/21 /BO SI VA[,VE 2-.5i -1311 PACKING Lli'AK REPACll.F;D VALVE:

2

{'*

0Gl21teo f/H PUMP 2*Rll*Pd8.

LEAKING GASKE7' C 0Ml'LB'2'/W 2

06J29/80 EE VALVE 2.. EG*12 AlR !ZAK PACKING TIGl/2'EN PACKING NUT 2

06}30)00 SS VAl;vE

!l'V "ss.2osA soumow CONS2'AN'l'ii BL£'b'DS AIR VOiiJ CONPLE.l'W Bl EiE.'C 2

(

06/30/BO SS VALVE'

'l'V -ss.201A SOLENOID CONSTAN1.'Lf lJLEE.'llS Alli VOIV CONI'LE.l'EV BY ELEC 2

DEf'T '1'01' AL

  • io:59 AM PAGE 2 Mli 1'01'WN1'M 006200/116 5

0052219311 55 006180800 111 006180001 111 006180802 111 006180008 111 006181100 116 0062301150 33 0062301151 33 00621110118 1

0062*110119 1

0062111052 1

9120511105 5

003230502 2160 00 11120601 2

00111501103 20 00"150110'1 21 001fi50110s

  • Ii 00111501106 111 00*11 so110*1 111 0011111315 1656 00111/1316 1656 006100900 3811 006180009 192 006192200 161 006211208 50 006260'135
  • 1 902161136 2110 00111so1101

!i 00111501109 58 006261930 1

005191'156

  • 18 006221310 0

006221311 0

WnP*Cf"*

l.1(;39

~

\\

~

00 I

)

)

I ;

. I I

i i

Maintenance of Safety Related Systems During:

Outage or Reduced Power Periods UNIT Ill Electrical Maintenance J.. **

  • :*~

No maintenance was performed on safety related systems during outages or reduced power periods.

31 -

Maintenance of Safety Related*systems During

  • outage or Reduced.Power Periods UNIT /!2 Electrical Maintenance

"\\.

c*

i

(*

[lf;r'.l'=EUX 1 JTJL BO

  • 10:59 AM I'AGE 3

("'

UNI1'2" *1 /0i!BO (MAIN7'F..'NANCE OE' SAFE'J.'Y RELA'.T'ED SYS7'EMS VU/IING OU2'AGE OR REDUCED fOWER PERIOVS) t*

Rli'1'SF,'/iVVT SYS COHP MARKNO

SUMMARY

WKPERF u

MR 1'0TmN1'N r

06/02/BO SS VALVE 2*v.,ss~2oa INS7'ALL Ll/.11'1' SW17'Cl/ES MOVE/J LIM12' SWI7'CHES 2

0022111!00 1134 06/021ao Cl/

IJ7' CK7'23BPNLB Rli'PLACE HEA7' 7'APE m;m* 1'AI'f: GOOD 2

0031300111 119 06)02)80 Cl/

111' C/C/'23I'NL9 REPLACE //EAT 'l'AI'b' HEA7.' 7'AI'E GOOD 2

003130015 119

('

06/02/BO SI TIT l'NL11CK1'1A IJREAKE'R 2'RIPS RE'PLACb'V /Jf:A7' 7'AI'E 2

0050'/1115/

56 06/02/BO SI H'l' PNL10CK'l'1A Bf/EAKER 'l'RIPS

/lf,'A'l' 7'.1rE GOOD 2

005011450

'19 06/02/80 SI

//7' PNL11CKTll CLE.1R W ALA/i'M CLli'AliE'D W ALAHU 2

00521105*12

  • 19

("

06/02/80 SI ii7' PNL11CK1'1 CLF.:AR W ALARM CIRCUI'l' GROUNDb'll 2

00521!05*13

'/9 06/02/60 SI 1/2' PNL10CK1'1 CLEAR W ALARM CLEARED LO 'l'E:MP ALA/IM 2

0052ll051Jll

/9 e

06/02/80 SI 1/7' PNL10CKT5 CLEhR W ALARH.

CLF,'ARF:D W ALARM 2

00521!05115

/9 f"

06/02/dO Sl

/JT PNL10CK'l'IJ CLE'AR W ALARM C /'.EA/iED W ALARM 2

0052'105116

  • 19
  • 1 06/02tao DA VAE'

'l'V *DAn200B REPAIR LIGIJ'l'S ON VALVE ADJUS'l'ED 33 Slln'Cl/E'S 2

0052111015 31 06/02/80 EU MDV MOV*F"*251D MDV IS S//U7' BHEAKt:R IS OPEN AD.JUSl'ED S1~12'CH 2

005201601

~a f

06/02/80 VS NOV MOV"VSn200A MOV f'f.JS CONl'L1;'7'ED T:'MS ON NOV VS 200A 2

9012511425 10351 06/02/00 VS MOV MOV.vs~2ooc MOV ms COMPLE1'ED PMS ON MOV VS 200C 2

901251112/

10349 06/011/60 vs NOV MOVoVSo200B M01'0R E'NJ) Bli'LL CllACKED lib'PLACEV END BE:LL SPAHE nsn:D SAT 2

005152309 11'1

(

06/011/60 liW MDV MOV*FJ./*251F MOV l'MS COMl'LE'l'ED AS PER ABOVE *PROCEDURES 2

901251411 11521 06/05/80 RS IN52'R 2.. Rs~AMdA CALWRA7'E AJ.INF..'2'ER COMPLE'2'E 2

0011211520 1

06/05/60 RS INSTR 2*RS~AMn1B CALIIJTi'A7'E NofftlE7'8R COMPLE1'E 2

005131532 1

w

("

06/0'1 /60 C/I HT PNL10... 11CKTI REPAlfl OR REPLACE REPLACBD IJBAT 2'APE 2

005151500 115 N,

06/0'1 /BO CH HT PNL6CK7'6A CJl.T BKR f'ORCK7' 6A '.!.'RIPPING OU1.'

REPLACED HEAT 'l'APE+2'/IERMOS7'AT

2.. 005181513 122 oc;/09/00 EPL BREAKF:R 21JH2 fF.1 BREAKER COMPLE1'E 2

00!1111'130 6211

('

06/09/80 EPL BllEAKb'R 24HIJ FM BREAKF:R COMPLE2'ED PMS 2

00111111132 5/6 06J09/60 E!'L BREAl(ER 24HS PM Dflb'AKE'R CONPLB1.'E 2

00'11114 311 552 OGt09/BO t,'PL llREAKB(i 21.JHI PN 1r1REAKF:R COMPLE2'E 2

0041111135 552

('

06/.09/BO SI MOV MOV.2862A C/18CK f.IMU SWI7'CllES AlJ.JUS2'Ef) LIMIT SW17'CllES 2

005150219 456 OG/.09/BO IA l)ftY/i:R AIR VliYER COMPRESS DOE'S RUN

, REPAIRED FAN 2

oo6ornno 1

06/10~80 Fil 02'/lE'R lNS~'AC,f, filMI2' SWI7'CH COMPLE1'E 2

0032113119 13111 r

06/10,00 MI 01'/lr:R RIJPr..ACE Wfi:S7'!NGllOUSE Bf:'V HU1AYS COMPLF:1'EfJ l'ESIGN Cl/ANGE 2

0011231001 1109 t

06/101ao RC VAf,VF.

ucv.. 2s~1c

'/.'BS1'1NG HCV *255'/C VERlfif,D 0PfJllA7'!0NS 2

005290948 25 06/10/~0 8C VALVE l/CVo2S5H

'J'f,'S1,'J,NG fJCV *25 s*1 A VERlFIE'/J Ol'ERA7'IONS 2

0052909119 25 e

{'

06t10/SO liC VALVe'

/JCV.. 2566C

'J'fl'S'l'J,NG llCV*2556C VERIFJ'EI) OPERA7'IONS 2

005301102 25 I

06}10/dO llfJ VAliVF.

2*v~nD.. 2oov 1(1.f,~ NO'l' S3'A¥ CLOS<<

tlVJUsn:v f,~M,ll'S 2

006050020 33 06/10/BO

.'JS VAJ;VE 2*v~ss.2oon INVICM'/!!S OFRN Af,fj 2'/lf: ~'IM8 AV.IUS7'1W L1Ml1'S 2

006060355 5!i

(

06/10/BO Cll 112' CK7'1Al'NL10 REPLACE DliMAGE llfiA1' TRACf,'

(!f;l'LACEV I/AD l/b'A~' 7'APE CI/1CUD' SAT 2

006061001 Bl 06/10/80 Cl/

MOV c.cv.. c11-211sv NOV PMS COMPM7'/::IJ AS l'Eil EMP* PoNOV *4 5 AND.19 2

901251501 1'16 01.i/11/.BO RS 1NS7'R R7'D*RS.,'l56A f/EINSl'AM.1 111.'D 2'1Gtn'EN VOR CUJSBR CLEANIW PAll'l'S 2

0050511100 2

('

013/.11/00 fH 07'/IF:R lill'MOVf..' Rf..'/iC1.'0R CAVITY UNVll'TJIA7'E.'R £IG Rll'MOVW+/Ui'PLACF.LI LJGIJ2'S 2

00523095/

4110 06/16/80 SI INS'l'R 1MPLb'MEN2' VIC 19.. S22 DE:SIGN Cl/ANGE COMPLE2'E 2

0052111'129 18 06/16/80 RC 1NS7'R JMPLl,'ME'N'l' V/C ao~sas DF.,'SlGN Cl/ANG.~' COMPLE7'E 2

oos2111no 15

(

06/16/BO SI INS2'R JMF'LEMt:N1' DIC eo~sas VESitlN Cl/ANGE COMPL&i'E 2

0052111131 15 06n6JBO cs

  • PMP M2'R 2.. cs"r.1A REPLACE OR Rfl'PAIR M01'0R INS7'ALUiL> SCREt:N 2

005291ti13 1611 06/16/BO CH 117' Cld'SAPNL10 ii'f'.'Pf,ACE BAD l/F.A1' 2'APE llbPLACb' /JEAT TAP8 2

006061002 121

(

06/16/ao C/J

/IT CK1'5BpNL11 Rl!.'PLACb' OLD 7'RACE WI7'1J Nbl/

RF;l'LACE' //£ A1' 7'APE 2

006100151 121 06/16/80 Cl!

111' Cl<.'l'SBPNL10

/if:PJjACE OW 2'/iACE W17'1J NW RF.l'LAC/i' IJEA7' 2'APE 2

006100156 121 06/16~80 CH MOV NOVo2115D VAJ;VE 2'/JERMADS OUT W/JEN OPE'NING COMPf,E'l'E 2

006122206 811 06/11/80 GW INS2'R 1'//lfRM NO 1 Sl/OWS NO RE'AL'lNG NO l'//OCILEM E'OUND 2

0011101220 119 06/.11Jao cc 1NS7'1i TJCqCC*225 7'1/ERMOCOUPLli' IS orf.;N.Rf,'PLACE Cllli'CJ(f:D 2'/C OK NO PROBLEM 2

006111'116 311 i>

i J

('

IJEN'=f.'C.EC t'

RE1'Sf.'RVll'l' SYS COMP 06/.11/80 CIJ l'MP m'R 06/11/60 EE BA1'1' 06/11 /BO Cl/

I'IF'ING 06/11/BO

/111 I'MP MJ'R 06/18/BO pt; 01'1/F.:R 06/18/flO SI VALVE 06/19/80 RI/

PMP M'l'li 06/20/90 cs INS'J.'R 06/23/80 RS FNP M'J.'R

(

06/23/80 RS PMP M1'R 06/23/80 RS 1NS2'R 06/23)80 RS MDV 06123)80 Cl/

MOV 06/23/00 Cll MOV 06/23/BO Cl/

MOV 06n1J100 SI VAJ;VE 06/211)ao RS NOV 06/25)80 RS lNS'J.'R

(

06}25IBO li'S INS1.'R 06/25180 Cll INS'l'R

(

06/25180 SW MOV 06/25/BO SW NOV DEPJ' 'l'OT AL

(

(

t I.

I I

1 JIJL 80.i-10:59 AH PAGI~ 11 UN11'2* '1 J01 /BO (MAIN'J.'ENANCE' Of' SAE'E1'Y m;r..A1'EV SYS7'E'MS DURING OU'l'ACE 011 f([WUCEV f'OlnR I'b'RJODS)

NARKNO

SUMMARY

WKl'ERF u

Mii 1'01' Lf;t'N'J'/.f 2.c11.r.1c AUX og P.'-!I' JUNC2'ION BOX SFXUl!ED CONVTJI'l' 2

006122220 11 282 NEGA'J.'lVE GROUND iIGH'J.' OU1.'

LIG/11' OI'E'RM'E 2

00615154/

9 2nC//w342-152 C//J','CK /IF,A'l' ?'RACING HEA'J.' '.I'AP/i.' SA'.l' 2

006161830 211 2N/l/l"P*1B DISCONNECT MO'l'OR AND RECONNb'CT Pl1'0CEDURF, S1'0PF'ED JOU WORKED MR 8200 2

908211305 nos

/cn3 RF.'PLACE CONNF.'C'.I'OR lib'PLACl!:D CONNEC'.l'Oli 2

005231626 n

'l'VoSI~201iJ VALVII WILL NO'J.' S'l'AY OI'eN ALJ,JUS'J.'ED SfVJ'l'CI/

2 OOGi6i /511 22 2~RllPntB liEMVE UPPER TllRUS'J.' BF;ARlNG MO'l'OR RT;'J.'UHNEIJ 7'0 Sb'llV ICE 2

003051615 2'189 LS*200A RF,'PAlR OR REPLACb: LEVEL SWI'J.'CllES INSTALM.:D NE'W SWI'J.'Cllr:s 2

906251011 1569 2"RS*P*1A LlISCONNll'C'l' FOR Mb'CllANICS MO'J.'Oli OPERA'i.'IONS NORMAL 2

005051343 il /II 2"RS"P*1B VISCONNEC'l' f'OR MF.CHANICS MO'J.'OR OPERATIONS NOI'o\\JAL 2

0050513'1'1 11*14 LSwRS"200C CAJ;IBRA'l'E' AND WOP CllF.CK AllJUSTED U:VEL SWITCll 2

005151205 80 Mov~Rs.. 2568 Cl/ECK MM17'S AVJUSTED LIMI2'S 2

006202100 69 MOVo22698 M01'0R CON'l'lNOUSLY RUNNING COMPLE1'EV AS PER EMPoCwMOV*iD 2

006210600 53 Mov.. c11.. 22e1/i MOV PMS CONPLF;n;p AS PER f.MP*P*MOV*llS

.?

90125111'19 56 MOVoC//.,228'1C MOV PMS COMI'LE'l'ED AS PER E.'Ml'*P*MOV 04 5 2

901251'151 112 M0Vff286'1B VALVE WILL NO'J.' FULLY CWSE COMPLE1.'ED AS FER E.'MP.CsMOV *63 2

006221505 29 MOVoRS"256B rnllf'0/1M E:MP*P"MOV ~*15 DEV IA'J.'ION. COMPLE'2'E 10*11*'1'1 2

020159680 0

c.s.. Rs.. 201A CLC:AN AND CAJ; LEVEL SIH'l'CH CllE.'CKED 2

005151132 125 r,s.. Rs.. 2010 CLF;AN AND CALIBRA'l'E Lf:Vt:L Sfil'J.'Cll CHECKED 2

005151202 125 BLENDER S'l'OP~STAfd' 5Wl7'Cll

'.l'ES'J.'8D SAT 2

006230225 6

Mov.. sw.2050 WILL NO'J.' CYCLE CONPLE"J.'ED AS PER E:MP*C*MOV 063 2

006231300 20 MOV*SW*205C WILL NOT CYCLE COMPLE'l'E/J AS PE.'R 8MPoC*MOV*63 2

006231301 2B

  • P**Fr""'

550'111 I

. i i

i 1

.i

-. \\

'. i i
  • _ I

!.* 1,

34 -

Maintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT Ill Instrument Maintenance

- 35 No maintenance was performed on safety related systems during outages or reduced power periods.

Maintenance of Safety Related Systems During Outage or Reduced Power*Periods UNIT 412 Instrument Maintenance

DET'.l'"INS1' 1,fUL RO

  • 10: 59 AM T'AGll 5 UN 17'2* f ~OiJBO

(.'o!AIN'l'ENANCE OE' SAn:1*y JiF:l~A7'EV SYS1'EMS DU/IING OU7'AUll' OR TIEDUCEO l'OIVE'H rt:RIODS)

~

Ti'll'1'Sll'fi'V D1' SYS CON?

MARKNO

SUMMARY

WKPERF u

MR

'1'07'VWN'l'/1 06/02)80

[(/.I MON17'0R

/IIo//MSft262 ION C/IA/.fBER FAILF.'D EXCE:T*.:DTW ['fi'ESSU/IE LIMI7'5 2

005262113 1 '16 06/02/00 NI SOURCF,'

N*31 Rb-PLACE SOU/iFT, RANGE DE7'b'C1'0R Rb'PMCW DM'EC'l'Ofi 2

00528110'1 103 06/011/80 TIC VAr.VE I.7'-2ft11911 REf'LACEV LP DRAIN VALVE CLEANED VAf,VE' t.NV PRESSfJ/IE C/IECK 2

003300815 6

Of;/QIJ/80 RC OTllER

'.i*E*.21153 fi7'Ll 7*g.21153 IS BROKEN REPLACEll NIPf'J,E ANV li"l'D 2

005161600 359 06/011/00 cc lNS'l'R 1-*2*.cc.2on1 FAS1'F,'N 'l'UANSM11'1'E"R '1'0 INS'l'/IUMENT RAC FABRlCA'lW IJRACKB'l' 2

005311050 6

06/04/80 RC VA/,VB Ir:V*21155A RES'l'ROKE v.u;v E' VAJ,VE Cl/ECKEIJ OU2' SA'l' 2

0060211132 23 e,

q 06/011/90 RC VALVB rcv.211558 llES'l'h'OKE VALVE VAJ;F; Cl/F.:Cl<ED OU'l' SA'l' 2

0060211133 23 06/0IJ/80 RC VAT.Vb' rev.2*156 Llf"l'S llEUEF VALVE RESTt'l' OU'l'PU'l' OF l/IGIJ P//ESSU//f,' m;c;.

2 0060211135 25 06/011/ilO IA INS'l'R

//OLE IN f'LAS2'IC AIR LINE REPLACED AI/I LINE 2

0060110055 11 06/09/BO cs lNS'l'R Li.. cs.. 20011 lifv 57' OV E'H noiv VOID rim E:NGINBERING 2

005211000 0

l 06/09/80 cs JNS.1'R L1*CSa2008 lifvS'l' OVE/IFLOf/

VOJll Pf:R ENGlNF.:ERlNG 2

005211001 0

06/.09/80 cs INS1'R L1*CSa200C IMS'I' OV UWWW VOID PER ENGINE:F;JIING 2

005211003 0

06/09/00 cs INS'l'R LhCS*2001.l IMS'I' OVERPLOI{

VOW PER E'NGINE'f.:RING 2

0052'110011 0

l 06/09/80 cs lNSll P.1*~cs.201A VALVE' MISSING INS'l'ALf£D GOOSE: NECK ISOLA1'ION VALVE,'

2 005291410 01 06/11/BO cc INS'l'R r1.cc.21oc llf:PLACE MISSING GAGE ON CC 2'0 RCP lNS'l'ALDEV CALlBRA'l'f..'V GAGE 2

0060110900 211 f

06/13/80 l/M MONl1'0R RM~259/260 LO PLOW ANV E'1L1'BR E'AUL'l' S'l'RAir;H1'f:NBD PAPl':R 2

005050801 2210 l

06/16/80 cc 1NS1'/i' INS'l'.4/;L PJIE,'SS GAUGE

!NS'J'ALLE'Ll GAGE ANLl VALVE 2

0011'110111 15 06/19/BO Ef:

INS'J'R L1"EE*100B LliVEL IND1CA2'0R CLF.'ANE'D+REI'LACED FLUID 2

005300151 53

(

06/20/.80 cc INS'J'R 1*1.. cc,245D

'1'1"CC.. 2*158 BROKEN REf'LACE'D '1'E:Mf'ERA7'UllE INDICA2'0R 2

00111608115 1263 w )

"'-J 06/23/eo Rll VALVE:

llCVw211J2 Cl/ECK S'l'ROKE Oli VALVE STROKfW VALVE Cl/ECK OUT SAT 2

005042200 116 OG/23/80 Cl/

VALVE FCV*2122 VALVli' WILL N02' OPER.4'1'E REPLACBD PL/JG ORIFICE ASSY 2

006221500 18

(

06/23/80 RC INS2'R L7'*2*'160 V/l'N'l' VAJ;VE BROKEN REPLACE'D VEN'l' VALVE 2

006230900 9

06/25/ilO SS v1.r.ve 1*v.ss.206A..

SOV AIR LINE'S CONNEC'l'E:D UP WRONG WRONG SOV INS'l'AUED 2

00611101111 30 06/25/80 SS VALVE

'l'VoSSo201JA SOV AIR LINES WI/ONG SOV INS'l'ALLED 2

0061110115 30 06/25/80 SS VALVE 2*v"ss~202A sov.ss.202A IS NO'l' INSTL BACKf{ARDS WRONG SOV INS'l'ALLED 2

0061110'16 30 06/25/80 SS VALVE TVoSS*201A

'1'VPSS*201A INSTL lJACWARll WllOND. SOV INS'l'ALLED 2

006111041 30 06/25/80 SS VA/,VE 2*v~ss.290A 2VBING NOT CONNEC'1'ED CORREC'l'LY

'1'UIJING COliREC2' WRONG SOV

~

006191200 46

(

.*** fltll 91 VE:r'.l'

~*or AL

  • 1110 j.
  • ~

38 -

HEALTH PHYSICS JUNE, 1980 There was no single release of radioactivity or radiation exposure specifically associated with an outage that accounted for more than 10%

of the allowable annual values in 10CFR20.

.....J NUMBER UNIT OPl. l 2

39 -

EDURE DEVIATIONS REVIEWED BY 9noN NUCLE.'li.R SAFETY AND OPERATING COMUITTEE AFTER TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS

~

JUNE, 1980 TITLE DEVIATION Unit Startup Operation Step 5.7-HCV 2200B shut.

(Solid Plant Operation) Step 5.11-MOV's not operable.

The above procedure was deviated May 17, 1980 and reviewed by the Station Nuclear Safety and Operating Committee June 11, 1980.

PT 2.13 (F-1-122) l Charging Flow Steps 5.4.1,. 5.8.2 through 5.8.6 and 5.1.1-NA Omit ali data perti-nent to anything other than trans-mitter calibration.

The above procedure was deviated June 5, 1980 and reviewed by the Station.

Nuclear Safety and Operating Committee June 20, 1980 *

    • -r 1