Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000281/LER-1993-003-03, :on 930803,automatic Reactor Trip Occurred Due to Low Steam Generator Water Level Coincident W/Steam/ Feedwater Flow Mismatch Resulting from Spurious Closure of Main Feedwater Regulating Valve a + (00:14:41, 6 January 2025)
- ML18153B303 + (00:14:42, 6 January 2025)
- ML18153B302 + (00:14:43, 6 January 2025)
- ML18153B299 + (00:14:47, 6 January 2025)
- IR 05000280/1993019 + (00:14:48, 6 January 2025)
- ML18153B297 + (00:14:50, 6 January 2025)
- IR 05000280/1993015 + (00:14:57, 6 January 2025)
- ML18153B294 + (00:14:58, 6 January 2025)
- ML18153B293 + (00:14:59, 6 January 2025)
- ML18153B291 + (00:15:00, 6 January 2025)
- ML18153B290 + (00:15:01, 6 January 2025)
- ML18153B288 + (00:15:02, 6 January 2025)
- TAC:M86223 + (00:15:03, 6 January 2025)
- ML18153B287 + (00:15:03, 6 January 2025)
- ML18153B286 + (00:15:09, 6 January 2025)
- ML18153B285 + (00:15:10, 6 January 2025)
- ML18153B283 + (00:15:11, 6 January 2025)
- ML18153B284 + (00:15:11, 6 January 2025)
- ML18153B282 + (00:15:12, 6 January 2025)
- ML18153B281 + (00:15:13, 6 January 2025)
- ML18153B279 + (00:15:15, 6 January 2025)
- ML18153B278 + (00:15:16, 6 January 2025)
- ML18153B276 + (00:15:17, 6 January 2025)
- ML18153B275 + (00:15:18, 6 January 2025)
- ML18153B273 + (00:15:19, 6 January 2025)
- IR 05000212/2003004 + (00:15:20, 6 January 2025)
- ML18153B271 + (00:15:24, 6 January 2025)
- ML18153B267 + (00:15:25, 6 January 2025)
- ML18153B269 + (00:15:25, 6 January 2025)
- ML18153B266 + (00:15:26, 6 January 2025)
- ML18153B265 + (00:15:27, 6 January 2025)
- 05000281/LER-1995-003, :on 950224, as Found Calibration Test Data for Three RPS Transmitters Not within Allowable Tolerance. Caused by Faulty Pressure Gauge Used in Calibration.Pressure Gauge Replaced & Repeated Calibration Check + (00:15:29, 6 January 2025)
- ML18153B263 + (00:15:33, 6 January 2025)
- ML18153B259 + (00:15:34, 6 January 2025)
- ML18153B262 + (00:15:34, 6 January 2025)
- ML18153B258 + (00:15:36, 6 January 2025)
- ML18153B256 + (00:15:37, 6 January 2025)
- ML18153B257 + (00:15:37, 6 January 2025)
- IR 05000280/1995004 + (00:15:38, 6 January 2025)
- ML18153B254 + (00:15:39, 6 January 2025)
- ML18153B253 + (00:15:40, 6 January 2025)
- TAC:M89085 + (00:15:41, 6 January 2025)
- ML18153B252 + (00:15:42, 6 January 2025)
- 05000281/LER-1995-002-02, :on 950210,lift Settings for Two MSSVs & Two Psvs Found to Be Outside as Found Range Allowed by TSs 3.6.A & 3.1.A.3.b.Caused by Setpoint Drift.Safety Valves Repaired & Readjusted + (00:15:43, 6 January 2025)
- IR 05000122/2002011 + (00:15:45, 6 January 2025)
- ML18153B247 + (00:15:46, 6 January 2025)
- ML18153B246 + (00:15:47, 6 January 2025)
- 05000281/LER-1995-001-02, :on 950204,pressurizer Heatup Exceeded TS Limit Due to Lack of Procedural Control.Cooldown Rate Reduced, Deviation Rept Submitted & Plant Data for Event Supplied to Westinghouse to Peform Technical Evaluation + (00:15:48, 6 January 2025)
- IR 05000280/1994033 + (00:16:02, 6 January 2025)
- ML18153B242 + (00:16:04, 6 January 2025)
- IR 05000280/1995099 + (00:16:06, 6 January 2025)