PRIORITY 1
.CCELERATED RIDS PROCESSING) e
,J,-
' REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9503280052 DOC.DATE: 95/03/20 NOTARIZED: NO
' FACIL:50-281 Surry Power station, Unit 2, Virginia Electric & Powe AUTH.NAME AUTHOR AFFILIATION BOWLING,M.L.
Virginia Power (Virginia Electric & Power Co.)
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET#
05000281
SUBJECT:
Notifies of SG tubes plugged during 1995 refueling outage.
DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR
/ ENCL Q SIZE:
(
TITLE: OR Submittal: Inservice/Testing/Relief !Fom ASM~Code -
~G=L~~e8~9--~0~4~*~
No'TES:
RECIPIENT ID CODE/NAME PD2-2 LA BUCKLEY,B INTERNAL: ACRS----* --*~
_.e;Jt,:f:t~TER~
~Ntm.71JE7'EME'B OGC/HDS2
- t:XTERNAL: LITCO BROWN, B NOAC NOTES:
NOTE TO ALL "RIDS" RECIPIENTS:
COPIES LTTR ENCL 1
1 6
1 1
1 1
1 1
RECIPIENT ID CODE/NAME PD2-2 PD AEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB LITCO RANSOME,C NRC PDR PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
0 TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL ~
COPIES LT'i'R ENCL 1
1
- 1.
1 1
1 1
05000281
- p.
R I,
0 R
T y
1 D
0 C
u M
E N
T
e VIRGINIA ELECTRIC AND PowER CoMPANY RICHMOND, VIRGINIA 23261 March 20, 1995 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 2 STEAM GENERATOR TUBE INSPECTION REPORT Serial No.95-118 NURPC Docket No.
50-281 License No. DPR-37 Planned inservice inspection of the Surry Unit 2 "A" steam generator was completed during the 1995 refueling outage. In accordance with Surry Power Station Technical Specifications, Section 4.19.F.a, this letter provides notification of the steam generator tubes that were plugged during the outage. Four tubes were plugged due to axially oriented indications, and one tube (R1-C59) was plugged as a precautionary measure due to a restriction at the tube sheet on the hot leg which prevented inspection of the area with a rotating pancake coil probe.
"A" STEAM GENERATOR TUBES PLUGGED ROW COLUMN 4
36 6
39 7
39 7
50 1
59 (precautionary)
If you have any questions concerning these results, please contact us.
Very truly yours,
~/]1 M. L. Bowling, Manager Nuclear Licensing and Programs cc:
United States Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Statioo__
- - --9503280052 950320
- PDR ADOCK 05000281 Q