- ~ -'t e
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 23, 1995 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 CONTROL ROOM DESIGN REVIEW COMPLETION Serial No.
NL&P/CGL Docket Nos.
License Nos.94-644 RO 50-280 50-281 DPR-32 DPR-37 In an October 21, 1994 letter, Virginia Electric and Power Company was requested to inform the NRC when all safety significant human engineering deficiencies (HEDs) associated with the Surry Power Station Control Room Design Review (CRDR) and Reassessment were completed. The purpose of this letter is to advise you that all the corrective actions (CAs) defined to address the identified HEDs have been completed.
Specifically, the Unit 1 CAs and the non-outage Unit 2 CAs were completed by the end of 1994, as previously committed. The Unit 2 outage-related CAs were completed during the recently completed refueling outage.
If you have questions regarding completion of our Surry CRDR activites, please contact us.
Very truly yours,
~?.~~
James P. O'Hanlon Senior Vice President - Nuclear cc:
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station
-- -. *-. -- 0_J]_[}_[t_~ 2 9503290103 950323- -
~DR ADOCK 05000280 PDR