VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 27, 1993 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 FITNESS FOR DUTY PROGRAM SEMI-ANNUAL PERFORMANCE DATA REPORT Serial No.

NURPC Docket Nos.

License Nos.93-550 50-280 50-281 50-338 50-339 DPR-32 DPR-37 NPF-4 NPF-7 Enclosed is the Virginia Electric and Power Company Semi-Annual Fitness for Duty (FFD) Program Performance Data Report for January 1, 1993 through June 30, 1993.

This report is submitted pursuant to 10 CFR 26.71 (d). includes summaries of management sanctions imposed, actions completed to improve the program, events reported to the NRC, and our random testing rate. Attachment 2 contains the standard FFD data forms for North Anna Power Station, Innsbrook Technical Center (corporate), Surry Power Station, and Westinghouse Electric Corporation.

Very truly yours,

~8~

M. L. Bowling, Manager Nuclear Licensing and Programs Attachments

1. Summary of Events and Management Actions
2. FFD Data Forms

cc:

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station NRC Senior Resident Inspector North Anna Power Station Mr. L. L. Bush U. S. Nuclear Regulatory Commission Division of Reactor Inspection and Safeguards MS 9D24 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852

ATTACHMENT 1

SUMMARY

OF EVENTS AND MANAGEMENT ACTIONS e

SUMMARY

OF MANAGEMENT SANCTIONS IMPOSED 1/1/93 THROUGH 6/30/93 VIRGINIA ELECTRIC AND POWER COMPANY EMPLOYEES RANDOM TESTS Confirmed Positive Test for Illegal Drugs (Resulted in 30-day suspension, referral to EAP, and placement in the follow-up testing program.)

Confirmed Positive Test for Alcohol (Resulted in disciplinary action, referral to EAP, and placement in the follow-up testing program.)

CONTRACTOR EMPLOYEES RANDOM TESTS (Each case resulted in permanent denial of access.)

Confirmed Positive Tests for Illegal Drugs Confirmed Positive Test for Alcohol PRE-ACCESS TESTS (Each case resulted in permanent denial of access.)

Confirmed Positive Tests for Illegal Drugs FOR-CAUSE TESTS (Each case resulted in permanent denial of access.)

Confirmed Positive Tests for Alcohol 1

1 4

1 44 2

SUMMARY

OF MANAGEMENT ACTIONS COMPLETED TO IMPROVE THE FFD PROGRAM 1/1/93 THROUGH 6/30/93 None this period.

e e

SUMMARY

OF EVENTS REPORTED TO THE NRC BY VIRGINIA ELECTRIC AND POWER COMPANY 1/1/93 THROUGH 6/30/93 During a review of blind performance test results, a sample which had screened "positive" for amphetamines at the onsite testing facility tested "negative" at the HHS-certified laboratory. The HHS-certified laboratory provided an explanation of this incident and it was forwarded to the NRC in our letter (Serial No.93-138) dated March 22, 1993.

During a review of blind performance test results, a sample which had screened "positive" for methaqualone at the onsite testing facility tested "negative" at the HHS-certified laboratory. The HHS-certified laboratory provided an explanation of this incident and it was forwarded to the NRC in our letter (Serial No.93-284) dated June 2, 1993.

e VIRGINIA ELECTRIC AND POWER COMPANY.

RANDOM TESTING RATE 1/1/93 THROUGH 6/30/93 Virginia Power random testing rate

=

Surry Power Station testing rate

=

North Anna Power Station testing rate

=

Innsbrook Technical Center testing rate

=

98.8%

96.1%

101.9%

95.6%

e e

ATTACHMENT 2 FFD DATA FORMS NORTH ANNA POWER STATION INNSBROOK TECHNICAL CENTER SURRY POWER STATION WESTINGHOUSE ELECTRIC CORPORATION

e Fitness for Duty Progra4t Performance Data Personnel Subject to 10CFR 26 VIRGINIA ELECTRIC AND POWER COMPANY Company SURRY POWER STATION Location JUNE 30, 1993 6 Month* Ending W. R. RUNNER, JR.

(804) 273-2735 Contact Name Phone(lnclude area coda)

Cutoffs: Screen/Conflrmatlon(ng/ml) D Appendix A to 10CFR 26 Marijuana 50/10 Amphetamines 1000/500 Barbiturates 200/200 Cocaine 300/150 Phencyclldlne 25/20 Benzodlazeplnes 300/300 Opiates 300/200 Alcohol (%BAC)

.04%/.04%

Methaqualone 750/750 Testing Results Long-Term Short-Term Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 1079 0

596 DHHS# NRC' DHHS#NRC Categories Tested Positive Tested Positive Tested Positive Pre-Access 41 0/0 0

0 1106 26/26

'Tl Post Accident 0

1 0/0 0

0 0/0 0

0 Ill C

Observed Behavior Ill 0

0/0 0

3 1/1 CD 0

Random 529 0/0 0

0 277 4/4 Follow-up 15 0/0 0

0 0

0/0 Other 0

0/0 0

0 0

0/0 Total 586 0/0 0

0 1386 31/31

-r--

REV.1/92

Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Phency-Refusal BARB BENZ METH Marlluans Cocaine Onlates tamlnes clldlne Alcohol to Test 1

2 3

4 5

Licensee Ems,lovees 0

0 0

0 0

0 0

0 0

0 1..,u,.T11nn -

0 0

0 0

0 0

0 0

0 0

I ShArt.T...... ~

J 18 14 0

0 0

1 0

0 0

0 A

Total 18 14 O*

0 0

1 0

0 0

0 el

--Fitness for Duty Progra.

Performance Data Personnel Subject to 10CFR 26 ViRGINIA ELECTRIC AND POWER COMPANY Company NORTH ANNA POWER STATION Location JUNE 30, 1993 6 Month* Ending W. R. RUNNER, JR.

(804) 273-2735 Contact Name Phone(lnclude area code)

Cutoffs: sc*reen/Confirmatlon(ng/ml) D Appendix A to 10CFR 26 Marijuana 50/10 Amphetamines 1000/500 Barbiturates 200/200 Cocaine 300/150 Phencyclldlne 25/20 Benzodlazeplnes 300/300 Opiates 300/200 Alcohol (%BAC).04%/.04%

Methaqualone 750/750 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 1044 0

898 DHHS# NRC DHHS#NRC Categories Tested Positive Tested Positive Tested Positive Pre-Access 68 0/0 0

0 958 18/18 Post Accident 0

1 0/0 0

5 0/0 0

0 Ill C

Observed Behavior Ill 1

0/0 0

6 1/1 CD 0

Random 543 1/1 0

0 446 1/1 Follow-up 8

0/0 0

0 0

0/0 Other 0

0/0 0

0 0

0/0 Total 621 1/1 0

0 1415 20/20

-~ -*

REV.1/92

Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Phency-Refusal BARB BENZ METH Marlluanii Cocaine Opiates tamlnes clldlne Alcohol to Test 1

2 3

4 5

License* EmDlovees 0

0 0

0 0

1 0

0 0

0 I ftnn.Taffll -

0 0

0 0

0 0

0 0

0 0

I Short. Tarm - -

lrtl 15 5

0 0

0 1

0 0

0 0

A Total 15 5

0 0

0 2

0 0

0 0

~

-Fitness for Duty Prograi4t Performance Data Personnel Subject to 10CFR 26 VIRGINIA ELECTRIC AND POWER COMPANY Company INNSBROOK TECHNICAL CENTER Location JUNE 30, 1993 6 Month* Ending W. R. RUNNER, JR.

(804) 273-2735 Contact Name Phone(lnclude area code)

Cutoffs: Screen/Confirmatlon(ng/ml) D Appendix A to 1 OCFR 26 Marijuana 50/10 Amphetamines 1000/500 Barbiturates 200/200 Cocaine 300/150 Ph~ncyclldlne 25/20 Benzodlazeplnes 300/300 Opiates 300/200 Alcohol (%BAC)

.04%/.04%

Methaqualone 750/750 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 453 0

28 DHHS# NRC DHHS#NRC Categories Tested Positive Tested Positive Tested Positive Pre-Access 18 0/0 0

0 6

0/0

'Tl Post Accident 0

2 0/0 0

0 0/0 0

0 Ill C

Observed Behavior (II 0/0 0

0 0/0 CD 0

0 Random 221 1/1 0

0 9

0/0 Follow-up 0

0/0 0

0 0

0/0 Other 0

0/0 0

0 0

0/0 Total 241 1/1 0

0 15 0/0

  • REV.1/92

Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Phency-Refusal BARB BENZ_

METH Marlluans Cocaine Opiates tamlnes clldlne Alcohol to Test 1

2 3

4 5

Licensee EmDlovees 0

1 0

0 0

0 0

0 0

0 I ftnn.Term ft--*--*-7; 0

0 0

0 0

0 0

0 0

0 I

!lhnrt.T*rm C 0

0 0

0 0

0 0

0 0

0 A

Total 0

1 0

0 0

0 0

0 0

0 eJ

'I,

. Rey.-r-8/24/93 e

e Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 Westinghouse Conducted Pre-Access Testing for Virginia Power 1

WESTINGHOUSE ELECTRIC CORPORATION 2 June 30, 1993 Company

& Monina Ending 3 P.O. BOX 355 PITTSBURGH PA 15230 Location 4

PETER J. DEFILIPPI 5

( 412) 374-4942 6

Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml) 0 Appendix A to 10CFR 26 Marijuana Cocaine Opiates

20. 1 15 300 I 150 300 I 300 Testing Results Average Number witt Unescorted Access 7

Amphetamines Phencyclidine Alcohol (% BAC)

WESTJNGHOUSE EMPLOYEES 2200

  • 300 I 300 25 /

25 0.04%

BARBITURATES 300 300 I

BENZQQIAZEPINES 300 / 300 METHADONE METHAQUALONE Long-Term 300 I 300 300 I 300 Short-Term

~ *.

Contractor Personnel Contractor Personnel 0

0 Categories 8

Tested Positive Tested Positive Tested Positive Pre-Access 67 0

"Tl 0

Post accident 0

0

~

(')

~

C:

Observed behavior (II 0

0 (D

Random 0

0 Follow-up 0

0 Other 0

0 Total

67.

0

_Breakdown of Confirmed.Positive Tests for Specific Substances 9

.TINGHOUSE LOYEES:

Long-Term ~onlractors Short-Term Conlraclors Total Marijuana Cocaine Opiates 0

0 0

0 LEGEND 1 =

BARBITURA1tS 2 =

BENZODIAZEDINES

-3 =. METHADONE 4 = METHAQUALONE 0

0 Amph*

Phency-tamlnas clidine Alcohol 0

0 0

-. *.a 0

0 Refusal to Test 1

2 3

4 5

0 0

0 0

0 A

-*--*--*- --al 0

0 0

0 0

-**-