Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209C372 + (23:31:12, 6 December 2024)
- ML20209C370 + (23:31:16, 6 December 2024)
- ML20209C369 + (23:31:17, 6 December 2024)
- ML20209C365 + (23:31:18, 6 December 2024)
- ML20209C360 + (23:31:19, 6 December 2024)
- ML20209C357 + (23:31:20, 6 December 2024)
- ML20209C359 + (23:31:20, 6 December 2024)
- ML20209C352 + (23:31:21, 6 December 2024)
- ML20209C350 + (23:31:22, 6 December 2024)
- ML20209C351 + (23:31:22, 6 December 2024)
- ML20209C347 + (23:31:26, 6 December 2024)
- ML20209C345 + (23:31:27, 6 December 2024)
- ML20209C346 + (23:31:27, 6 December 2024)
- ML20209C343 + (23:31:28, 6 December 2024)
- 05000423/LER-1986-045, :on 860731,containment Local Leak Rates May Have Exceeded Tech Specs 3.6.1.b & 3.6.1.2.c Limits.Caused by Damaged Chilled Water Sys Train a & B Supply Valves. Valves Repaired + (23:31:30, 6 December 2024)
- IR 05000354/1987010 + (23:31:32, 6 December 2024)
- ML20209C339 + (23:31:32, 6 December 2024)
- ML20209C336 + (23:31:33, 6 December 2024)
- 05000369/LER-1987-007-02, :on 870317,incorrect Actuation Tubing Connections on Halon Fire Suppression Sys Discovered.Caused by Failure of Procedure to Ensure That Tubing Was Properly Reconnected.Tubing Connections Corrected + (23:31:35, 6 December 2024)
- ML20209C333 + (23:31:37, 6 December 2024)
- ML20209C332 + (23:31:38, 6 December 2024)
- ML20209C331 + (23:31:38, 6 December 2024)
- ML20209C330 + (23:31:39, 6 December 2024)
- ML20209C328 + (23:31:39, 6 December 2024)
- ML20209C327 + (23:31:40, 6 December 2024)
- ML20209C326 + (23:31:41, 6 December 2024)
- ML20209C325 + (23:31:42, 6 December 2024)
- ML20209C320 + (23:31:43, 6 December 2024)
- ML20209C318 + (23:31:44, 6 December 2024)
- ML20209C317 + (23:31:45, 6 December 2024)
- ML20209C316 + (23:31:46, 6 December 2024)
- ML20209C315 + (23:31:46, 6 December 2024)
- ML20209C311 + (23:31:47, 6 December 2024)
- ML20209C314 + (23:31:47, 6 December 2024)
- ML20209C310 + (23:31:49, 6 December 2024)
- ML20209C307 + (23:31:50, 6 December 2024)
- ML20209C309 + (23:31:50, 6 December 2024)
- ML20209C306 + (23:31:52, 6 December 2024)
- ML20209C305 + (23:31:52, 6 December 2024)
- LD-87-019, Forwards Proprietary CENPD-275-P, C-E Methodology for Core Designs Containing Gadolinia-Urania Burnable Absorbers, in Support of Facility May 1989 Cycle 5 Startup.Fee Paid.Rept Withheld (Ref 10CFR2.790) + (23:31:53, 6 December 2024)
- ML20209C301 + (23:31:54, 6 December 2024)
- ST-HL-AE-2100, Forwards Revised Tables 8.3-3, Emergency Electrical Loading Requirements & 8.3-6, 125 Volt Dc ESF Loads. Tables Reflect Actual Loads Based on Final Plant Design & Calculation Finalization + (23:31:55, 6 December 2024)
- ML20209C296 + (23:31:55, 6 December 2024)
- ML20209C295 + (23:31:56, 6 December 2024)
- ML20209C294 + (23:31:56, 6 December 2024)
- ML20209C292 + (23:32:00, 6 December 2024)
- ML20209C291 + (23:32:01, 6 December 2024)
- ML20209C287 + (23:32:02, 6 December 2024)
- ML20209C285 + (23:32:03, 6 December 2024)
- ML20209C283 + (23:32:04, 6 December 2024)
- SVP-99-128, Application for Amends to Licenses DPR-29 & DPR-30,changing TS Section 3/4.3.C, Reactivity Control - Control Rod Operability + (23:32:04, 6 December 2024)