ML20209C352
Jump to navigation
Jump to search
| ML20209C352 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/21/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dickey J FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8609090008 | |
| Download: ML20209C352 (1) | |
Text
~
August 21, 1986 c /75 /
Florida Power and Light Company 36' M
/"
ATTN: Mr. J. W. Dickey Vice President - Nuclear Operations P. O. Box 14000 Juno Beach, FL 33408 Gentlemen:
SUBJECT:
REQUALIFICATION EXAMINATION VALIDATION REPORT Thank you for sharing the subject report with Region II. Although the report does not change our view regarding validity of the Turkey Point examina-tion, it provides an interesting perspective for consideration during future examinations.
Sincerely, l
0T.iS':"i," ' : J.'iY:
J. NELS0:1 GMCE '
J. Nelson Grace Regional Administrator bec: Document Control Desk e
II E
Q l'([),
AFGli on:aw alker 08/gb/86 08/30/86 FP&L fg i
h 8609090000 860821 PDR ADOCK 05000250 V