Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209E268 + (23:12:06, 6 December 2024)
- ML20209E270 + (23:12:06, 6 December 2024)
- ML20209E267 + (23:12:08, 6 December 2024)
- ML20209E266 + (23:12:09, 6 December 2024)
- RBG-25822, Special Rept:On 870113,triaxial Accelerograph Removed from Svc for Design Mod to Reactor Bldg Standby Liquid Control Sys Storage Tank.Rept Re Inoperability of Accelerograph Not Submitted within 10 Days.Caused by Administrative Oversight + (23:12:09, 6 December 2024)
- ML20209E260 + (23:12:10, 6 December 2024)
- ML20209E259 + (23:12:11, 6 December 2024)
- ML20209E257 + (23:12:12, 6 December 2024)
- ML20209E256 + (23:12:13, 6 December 2024)
- ML20209E255 + (23:12:14, 6 December 2024)
- ML20209E254 + (23:12:15, 6 December 2024)
- ML20209E250 + (23:12:23, 6 December 2024)
- ML20209E249 + (23:12:23, 6 December 2024)
- ML20209E248 + (23:12:24, 6 December 2024)
- ML20209E247 + (23:12:24, 6 December 2024)
- ML20209E242 + (23:12:26, 6 December 2024)
- ML20209E238 + (23:12:29, 6 December 2024)
- ML20209E237 + (23:12:29, 6 December 2024)
- ML20209E234 + (23:12:31, 6 December 2024)
- ML20209E233 + (23:12:32, 6 December 2024)
- ML20209E229 + (23:12:32, 6 December 2024)
- ML20209E228 + (23:12:34, 6 December 2024)
- 05000414/LER-1999-003-02, :on 990612,unplanned Actuation of Esfa Sys Due to a SG High Level Was Noted.Caused by Inadequate Procedural Guidance.Long Term Corrective Actions to Prevent Recurrence of Event Are Being Developed + (23:12:35, 6 December 2024)
- ML20209E225 + (23:12:37, 6 December 2024)
- ML20209E224 + (23:12:38, 6 December 2024)
- ML20209E222 + (23:12:43, 6 December 2024)
- ML20209E219 + (23:12:44, 6 December 2024)
- ML20209E218 + (23:12:45, 6 December 2024)
- 05000333/LER-1999-005-01, :on 990506,missed Surveillance Test Was Noted. Caused by Inoperable Containment Hydrogen/Oxygen Analyzer. Counseled Personnel Involved & Revised Procedures.With + (23:12:47, 6 December 2024)
- ML20209E215 + (23:12:48, 6 December 2024)
- ML20209E211 + (23:12:49, 6 December 2024)
- ML20209E208 + (23:12:52, 6 December 2024)
- ML20209E207 + (23:12:53, 6 December 2024)
- ML20209E206 + (23:12:54, 6 December 2024)
- PNO-II-99-027, on 990709,State of Fl,Bureau Div of Radiation Control,Notified NRC That Two Portable Troxler Moisture/ Density Gauges Were Reported Missing by Licensee.One Gauge Was Troxler Model 3411B & Other Gauge Was Toxler Model 3440 + (23:12:54, 6 December 2024)
- ML20209E200 + (23:12:56, 6 December 2024)
- ML20209E199 + (23:12:57, 6 December 2024)
- ML20209E198 + (23:12:58, 6 December 2024)
- 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 + (23:12:59, 6 December 2024)
- 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 + (23:12:59, 6 December 2024)
- ML20209E190 + (23:13:01, 6 December 2024)
- ML20209E191 + (23:13:01, 6 December 2024)
- ML20209E189 + (23:13:02, 6 December 2024)
- ML20209E188 + (23:13:03, 6 December 2024)
- ML20209E186 + (23:13:04, 6 December 2024)
- ML20209E184 + (23:13:05, 6 December 2024)
- ML20209E180 + (23:13:06, 6 December 2024)
- ML20209E182 + (23:13:06, 6 December 2024)
- ML20209E177 + (23:13:10, 6 December 2024)
- ML20209E176 + (23:13:11, 6 December 2024)
- ML20209E175 + (23:13:12, 6 December 2024)