Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210T755 + (06:02:48, 6 December 2024)
- ML20210T752 + (06:02:49, 6 December 2024)
- ML20210T751 + (06:02:49, 6 December 2024)
- ML20210T750 + (06:02:50, 6 December 2024)
- ML20210T747 + (06:02:51, 6 December 2024)
- ML20210T748 + (06:02:51, 6 December 2024)
- AECM-86-0308, Notifies That Page 3/4 3-71 from Amend 19 to Tech Specs Re Remote Shutdown Sys Controls Effective 860930,per Request. Installation of Isolation Switches Will Be Completed During First Refueling Outage + (06:02:52, 6 December 2024)
- ML20210T745 + (06:02:52, 6 December 2024)
- ML20210T744 + (06:02:53, 6 December 2024)
- ML20210T743 + (06:02:54, 6 December 2024)
- ML20210T740 + (06:02:57, 6 December 2024)
- ML20210T736 + (06:02:57, 6 December 2024)
- ML20210T735 + (06:02:58, 6 December 2024)
- ML20210T734 + (06:02:59, 6 December 2024)
- ML20210T732 + (06:03:00, 6 December 2024)
- ST-HL-AE-5743, Application for Amends to Licenses NPF-76 & NPF-80,revising TS to Allow Elbow Tap Differential Pressure Measurements to Be Used Instead of Precision Heat Balance Measurements to Determine RCS Total Flow Rate + (06:03:00, 6 December 2024)
- ML20210T729 + (06:03:01, 6 December 2024)
- U-600840, Advises of Change in Compliance W/Reg Guide 1.45 Re Leak Detection Sys,Per Util Describing Revs to Facility Fsar.Fsar Rev Will Be Implemented in Next Update + (06:03:01, 6 December 2024)
- 05000271/LER-1987-001, :on 870107,reactor Protection Sys Motor Generator Set Tripped,Resulting in Half Scram & Initiation of ECCS Sys.Caused by Failed Coil on Control Relay Due to End of Life.Coil Replaced + (06:03:03, 6 December 2024)
- ML20210T726 + (06:03:04, 6 December 2024)
- ML20210T722 + (06:03:05, 6 December 2024)
- B16678, Provides Utils Response in Part of May 1984 & Revised Response in Part to NRC Question Q420.5,re Control Sys Failure Concerns Discussed in Mnps Unit 3 Fsar.Commitments Associated W/Submittal,Listed + (06:03:06, 6 December 2024)
- ML20210T721 + (06:03:06, 6 December 2024)
- ML20210T713 + (06:03:16, 6 December 2024)
- ML20210T712 + (06:03:16, 6 December 2024)
- 3F0287-05, Monthly Operating Rept for Jan 1987 + (06:03:17, 6 December 2024)
- ML20210T707 + (06:03:18, 6 December 2024)
- ML20210T706 + (06:03:18, 6 December 2024)
- ML20210T705 + (06:03:19, 6 December 2024)
- U-600607, Responds to NRC Re Violations Noted in Insp Rept 50-461/86-04.Corrective Actions:Administrative Practice 12, Investigation of Potential Wrongdoing Concerns, Issued on 860425 + (06:03:20, 6 December 2024)
- ML20210T699 + (06:03:21, 6 December 2024)
- TXX-5033, Interim Deficiency Rept CP-86-36 Re Pipe Support Mods. Initially Reported on 860609.No Addl Instances Reportable Per 10CFR50.55(e) Identified During Continuing Engineering Evaluation.Next Rept Will Be Submitted on or About 861029 + (06:03:21, 6 December 2024)
- ML20210T696 + (06:03:22, 6 December 2024)
- ML20210T694 + (06:03:22, 6 December 2024)
- 3F0986-25, Responds to Violations Noted in Insp Rept 50-302/86-25. Corrective Actions:Senior & Nuclear Fire Protection Specialists Completed Fire Brigade Requalifications. Qualification Requirement Added to Fire Protection Program + (06:03:28, 6 December 2024)
- ML20210T690 + (06:03:29, 6 December 2024)
- NRC-97-0083, Requests Relief from Performing Sys Leakage Test at Nominal RCS Pressure During Fall 1997 Midcycle Outage.Asme Section XI Relief Request RR-A15,encl.Util Requests That NRC Approve Relief Request No Later than 971008 + (06:03:29, 6 December 2024)
- TXX-4822, Interim Deficiency Rept CP-86-26 Re Steam Generator Upper Lateral Restraint Embedment Design.Initially Reported on 850719.Deviation from FSAR Design Criteria Evaluated Under Util Program Plan,Item V.B.Next Rept by 860627 + (06:03:30, 6 December 2024)
- U-600704, Responds to NRC Re Violations Noted in Insp Rept 50-461/86-48.Corrective Actions:Functional Test of Annunciator Window & Computer Points Satisfactorily Completed + (06:03:30, 6 December 2024)
- ML20210T686 + (06:03:31, 6 December 2024)
- TXX-4824, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters Above Root Valves W/O Steam Traps or Wet Legs.Initially Reported on 860321.Evaluation of Corrective Action & Next Rept Expected by 860730 + (06:03:32, 6 December 2024)
- ML20210T679 + (06:03:33, 6 December 2024)
- ML20210T678 + (06:03:34, 6 December 2024)
- TXX-4823, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed Per Design Documents.Initially Reported on 850918.Review, Including Flexibility Problems of Conduit Between Raceway & Equipment,Continuing.Next Rept Expected by 860627 + (06:03:35, 6 December 2024)
- ML20210T674 + (06:03:36, 6 December 2024)
- TXX-5043, Interim Deficiency Rept CP-85-54 Re Seismic Qualification of HVAC Supports.Initially Reported on 851220.Engineering Evaluations Will Be Performed to Ensure Compliance W/Fsar Commitments.Next Rept Will Be Submitted on or About 861120 + (06:03:36, 6 December 2024)
- 3F0986-24, Responds to Violations Noted in Insp Rept 50-302/86-26. Corrective Actions:Memo Issued to Health Physics Personnel to Reemphasize Policy on Surveying for Alpha Contamination. Addl Guidance Provided in Procedure HPP-202 + (06:03:37, 6 December 2024)
- ML20210T673 + (06:03:37, 6 December 2024)
- ML20210T669 + (06:03:38, 6 December 2024)
- ML20210T668 + (06:03:38, 6 December 2024)
- ML20210T665 + (06:03:39, 6 December 2024)