AVERAGE DAILY UNIT POWER LEVEL-DOCKET.N0. 50-245^
UNIT Millstone 1
'DATE 870202 COMPLETED BY G. NEWBURGH TELEPHONE (203) 447-1791 Ext. 4400 MONTH JANUARY, 1987 DAY AVERAGE DAILY POWER LEVEL DAY ' AVERAGE DAILY POWER LEVEL (MWe-Net)-
(MWe-Net) 1 655 17 657 2
650 18 656 3
656 19 657-4 4
656 20 657 5
656 21 654 6
657 22
-657 7
654 23 651 8
656 24 653 9
656 25 656 10 656 26 656-l 11 657 27 657 12 655
-28 655 13 655 29 657 l
14 614 30 657 15 658 31 416 16 657 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
8702180296 870131 I
\\kg-PDR ADOCK 05000245 R
PDR.
e
~
I
= OPERATING DATA REPORT
' DOCKET'NO.-50-245~
DATE 870202-COMPLETED BY G. NEWBURGH-TELEPHONE (203) 447-1791 Ext. 4400 4
' OPERATING STATUS
.1.
Unit thune: Millstone 1 Notes 2.
Repor. ting Period: January 1987 3.
- Licensed Thermal Power (MWt): 2011 4.
Nameplate Rating (Gross.MWe): F l~
5.
Design Electrical Rating (Net RWe): L660 6.
Maximum Dependable Capacity (Gross M TW: 684 4
. 7.
Maximum Dependable Capacity (Net MWe): 654 8.
If Changes Occur in Capacity Ratings.(Items Number 3 Through 7)
Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If.Any (Net.MWe): N/A-10.
Reasons For Restrictions, If Any:
N/A e
i This Month Yr.-to-Date
' Cumulative-11.
Hours In Reporting Period 744 744 L 141792 12.
Number Of Hours Reactor Was Critical 744 744 110099.31 13.
Reactor Reserve Shutdown Hours 0
0
-3283.3 14.
Hours Generator On-Line 744 744-107109.4 j-15.
Unit Reserve Shutdown Hours 0
- 0 93.7?
{
16.
Gross Thermal Energy Generated (MWH) 1473052 1473052 198231125 17.
Gross Elec. Energy Generated (MWH)
-502800-502800' 66694796-18.
Net Electrical Energy Generated (MWH) 479794 479794 63617506 19.
Unit Service Factor 100 100 75.5 i
20.
Unit Availability Factor 100
-100 75.6 21.
Unit Capacity Factor (Using MDC Net) 98.6-98.6-68.6
~~~
22.
Unit Capacity Factor (Using DER Net) 97.7 97.'l 68.0 23.
Unit Forced Outage Rate 0
0 11.8 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
j Refueling Outaae, June 1987, 8 week duration 1
25.
If Shut Down At End Of Report Period, Estimated Date of Startup: N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION t
m J
DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT-NAME Millstone l'-.
DATE-870202 COMPLETED BY G. NEWBURGH g
REPORT MONTH JANUARY 1987.
TELEPHONE (203) 447-1791 Ext. 4400 l
2 No.
Date Type Duration Reason Method of Licensee Systeg:
Compogent-Cause & Corrective (Hours)
Shutting Event Code Code Action'to' 3
Down. Reactor ' Report #
Prevent Recurrence r
1 870131 S
0 B
5' N/A N/A:
N/A Power reduction <to replace the motor:-
generator brushes on the 'B' reactor!
recirculation. pump.
1
- 1 -
2-3 4-
'F:
Forced Reason:
Method:
Exhibit G - Instructions S:
Scheduled;.A-Equipment Failure (Explain):
1-Manual
.for; Preparation.of Data.
B-Maintenance or Test 2-Manual. Scram.
" Entry Sheets for Licensee
.C-Refueling 3-Automatic Scram Event Report (LER) File '
D-Regulatory Restriction 4-Continued'from.
'(NUREG-0161)-
'E-Operator; Training & License Examination.
previous month
'F-Administrative 5-Power Reduction :
5.
LG-Operational Error (Explain):
-(Duration =:0)-
. Exhibit 11-'Same Source.
3 LH-Other (Explain)
~
6-Other.(Explain) f
,n.,
. +.,
.a
e o
.'+
REFUELING INFORMATION REQUEST 1.
Name of facility:
Millstone 1 2.
Scheduled date for next refueling shutdown:
June 1987 3.
Schedule date for restart following refueling: August 1987 4.
Will refueling or resumption of operation.thereafter require a technical specification change or other license amendment?.
Yes, Technical Specification Changes Regarding:
(1) Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical Power Ratio 5.
Scheduled date(s) for submitting licensing action and supporting information:
Spring 1987 6.
Important licensing considerations associated with refueling,.e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
I 200 GE8B Fuel Assemblies 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core: (a) 580 (b) 1536 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed-storage capacity that'has been requested or is planned, in number of fuel ~ assemblies:
2184 Assemblies 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
4 1987, Spent Fuel Poci Full Core Off Load Capability is Reached.
1991, Core Full, Spent Fuel Pool Contains 2146 Bundles.
4
r o
G NORTHEAST UTILITIES oenerai Orrices. seiden street. Bernn, Connecticut 9
viY rvs5s7.nc'Ea5 P.O. BOX 270 a os aa* * **
[7,[,7,,7,,"" "."
HARTFORD, CONNECTICUT 06141-0270 L
L J
(203) 665-5000 February 10, 1987 MP-10,007 Re:
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Reference:
Provisional License DPR-21 Docket No. 50-245
Dear Sir:
In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed.
One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY lStephenE.Scace IUIf RAL-Station Superintendent Millstone Nuclear Power Station SES/GSN:rg