Further Response to FOIA Request for Records Re NRC Comanche Peak Task Force Established in Mar 1984.Forwards Apps T & U Documents.Portions of Apps T & U Documents Withheld (Ref FOIA Exemptions 4 & 5)
ML20210T713
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/28/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20209B909 List:
References
FOIA-85-59, RTR-NUREG-0800, RTR-NUREG-1037, RTR-NUREG-800 NUDOCS 8606020052
Download: ML20210T713 (31)


Text

T DR-oI(,

jf o

UNITED STATES g

NUCLEAR REGULATORY COMMISSION y {))g l;,* l tfdASHINGTOM, D. C. 20555

9. rc

%..... #a, MAY J 1986 2

l Docket Nos. 50-445/50-446 Ms. Billie Pirner Garde Director, Environmental Whistleblower Clinic Government Accountability Project 1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER Washington, DC 20036 TO F0IA-85-59

Dear Ms. Garde:

This is in further response to your letter dated January 21, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), records related to the NRC Comanche Peak Task Force established in March 1984.

We are now placing two boxes of records (boxes 11 and 12) in the QA/QC category in the NRC Public Document Room (PDR) in file F01A-85-59 under your name.

In particular, with the exception of three records indicated by asterisks on the enclosed Appendix T, which are undergoing further staff review, we are making available for public inspection and copying at the PDR the 131 records listed on the enclosed Appendix T and the 130 records listed on the enclosed Appendix U.

The records identified at number 34 on Appendix T and number 42 on Appendix U-contain information that is being withheld from public disclosure pursuant to.

Exemption (5) of the FOIA (5 U.S.C. 552(b)(5)) and 10 CFR 9.5(a)(5) of the Commission's regulations.

The withheld portions contain the advice, opinions, and recommendations of the staff concerning potential violations. The record identified at number 12 on Appendix U contains information that is being withheld from public disclosure pursuant to Exemption (4) of the F0IA (5 U.S.C. 552(b)(4))

and 10 CFR 9.5(a)(4) of the Commission's regulations because it is comercial information which was provided in confidence to the NRC. The nonexempt portions of these records are being placed in PDR file F01A-85-59 under your name.

Portions of the records identified at numbers 4 through 14,17 through 19, 22 through 24, 26 through 28, 30 through 33, 35, 36, and 127 of Appendix T and numbers 2 and 3 of Appendix U are being deleted without invocation of an F0IA exemption in accordance with the agreement reached between you and the NRC staff at a meeting on May 8, 1985. The information deleted consists of names, personal information, and identifying details concerning allegers, interviewees, and other individuals.

Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been determined that the information withheld pursuant to Exemptions (4) and (5) of the F0IA is exempt from production or disclosure and that its production or disclosure is contrary to the public interest. The persons responsible for this denial are the undersigned and Mr. Harold R. Denton, Director, Office of Nuclear Reactor Regulation.

8606020052 860528 PDR FOIA GARDE 85-59 PDR

i Ms. Garde This denial may be appealed to the Executive Director for Operations within 30 days from the receipt of this letter. Any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."

A separate set of the released records is being made available for public inspection and copying at the Local Public Document Room (LPDR) located at the University of Texas Library,170 South Cooper Street, Arlington, Texas.

Additional boxes of records subject to your request are currently under review

~

and will be placed in the PDR and LPDR in the coming weeks.

Sincerely, MNu

}

Donnie H. Grimsley, Director Division of Rules and Records Office of Administration

Enclosures:

As stated

W Re: F01A-85-59 Appendix T Box 11 - QA/QC Date Ti tle Page 1.

7/16/82 US NRC Testimony of Alleger 94 Witness for Intervenor CASE (In POR-AN0 8207200406) 2.

11/28/83 CASE letter to Administrative 1

Judge Peter B. Bloch - Dr.

Walter H. Jordan - Dr. Kenneth A. McCollom from CASE -

Subject:

Affidavits of Allegers (In POR-AN0 8312010366) 3.

11/28/83 US NRC CASE's Answer to Board's 150 10/25/83 Memorandum (Procedure Concerning Quality Assurance)

(In POR-AN0 8312010089) 4.

12/9/83 Brown & Root - Employee /A11eger 1

5.

8/6/82 Comanche Peak Nonconformance 3

l Report 6.

8/13/82 Memo to William Rice # rom 30 H. C. Dodd Jr.,

Subject:

i Brown & Root Management investi-gation in Response to August 6, 1982 complaint of Alleger (Comanche Peak Nuclear Power Plant) l l

l

7 8/17/82 Memo to W. M. Rice from H. C. Dodd, Subject Additional Alleger Concern 7

Swipe testing in pressurize on 8

r 8/17/82 Memo to W. M. Rice from H. C. Dodd, Subject Investigation of Alleger 12 Concerns 9

8/17/82 Memo to W. M. Rice

Subject:

Investigation of Alleger Concerns 1

10 8/17/82 Memo to W. M. Rice from H. C. Dodd

[

Subject:

3 Report on Complaint of AllEnclosed Investiga

$F

11. 9/2/82 eger Memo to 0. N. Chapman from O. L. Anderson

Subject:

5 AllegationsInvestigation of 12 Deleted Brown & Root letter of Dis-crepancies noted in the operations of 1

Tool Room the Millwright 13 Deleted Brown & Root Duties of II Millwright Departments' T the room Attendant ool

,1 n

t 2

14 12/10/82 Texas Utilities Generati Memo to 0. N. Chapman f ng Co.

Antonio Vega,

Subject:

rom 1

Conversation with Alleg Telephone 15.

2/15/83 er Letter TUGC0 to R. J. Gary from G Madsen - SIT Team Repo t

. L.

60 (In PDR-AN0 8302250237) r t

16 2/28/84 Letter TUGC0 from E. H. Johnsonto R. J. Gary (In POR-AN0 8403130183) 9 17 4/9/84 Interview 4/12/84 with site QA Manager 18, p

Name and Key Additional

~

27 Information for Appendix A Inspectors 9

19 9/10/84 b.

US NRC Memo to TRT Leaders from Thomas A. Ippolit

Subject:

o References in SSER 3

20 10/10/84 TUGC0 Letter to M. D from Richard L. Bangart

. Spence (In POR-ANO 9

8411130488) 1 4/25/83 Certificate (In POR-Hearing File)of Proceedings-Hearing Tra ygg nscript No date 72 Brown & Root Letter -

Attachment A 12/18/82 2

Statement of Alleger 12/18/82 1

Statement of Alleger 1

3/13/84 US NRC Report of Inquir 1

y 3

2

.i

26. 7/17/84 Allegations List 3

27, 7/18/84 List of Allegers - Mechanical 10

& Piping

28. 9/10/84 CP Allegations Chart, Addendum 4 13
  • 29. No date US NRC Confidential Interview 56
30. No date Summary of Deposition Exits 2
31. No date Summary of Deposition Exits 2
32. No date Comanche Peak Nuclear Power 2

Plant Allegations and/or Investigations summary - table

33. No date Comanche Peak Nuclear Power 2

Plant Allegations and/or Investigations summary - table

34. No date Allegation A-3 2
35. No date List of A11egers for Interviews 2

Mechanical & Piping 36.

No date A11egers Background 29 37.

10/10/78 Construction Operation traveler 3

Traveler # ME 78-108-1101 38.

1/25/79 US NRC Memo for D. B. Vassallo 2

from G. W. Reinmuth,

Subject:

Classification of Spent Fuel Pool Liner Plates (AITS F 12193H1)

(AITS F30382H1) 4 1

,,,c--

39. 4/2/81 Construction Operation Traveler 13 Continuation #ME-81-1562-1101
40. 9/3/81 Brown & Root Notegram 1

to Jim Starkey

41. 8/10/82 Brown & Root Notegram 1

to George Tanley

42. 8/10/92 CPSES - Nonconformance Report 8

NCR# M-82-01178

43. 9/16/82 System Cleanliness Plan Cover 8

Sheet XCP-ME-4 Revision 5 44, 7/25/83 TUSI CPSES Ouctwork Evaluation 178 of Nonconforming Welds - Summary Report - Available in the POR 45, 12/1/83 Handwritten Notes - Traveler 1

ME-80-2008-4000 46.

12/9/83 Startup Work Authorization -

1 Attachment C 47.

1/10/84 TUGC0 Letter to E. H. Johnson 2

from R. J. Barry 48, 2/29/84 Notes on Neutron detector 1

49. 3/26/84 TUGC0 telephone directory 9
50. 4/4/84 Containment Performance Working 212 Group Containment Leak Rate Estimates fourth draft 5

=

51. 4/4/84 Containment Performance Working 197 Group Containment Leak Rate Estimates fourth draft 52, 5/14/84 McGraw Hill Report - Inside NRC 6
53. 6/5/84 Technical Review Team Guidance 18 Appendix 0 54.

6/5/84 Technical Review Team Guidance 18 Appendix 0

55. 6/5/84 Technical Review Team Guidance 18 Appendix 0
56. 6/5/84 Technical Review Team Guidance 18 Appendix 0
57. 6/5/84 Technical Review Team Guidance 18 Appendix 0
58. 6/5/84 Technical Review Team Guidance 18 Appendix 0 59, 6/5/84 Technical Review Team Guidance 18 Appendix 0
60. 6/5/84 Technical Review Team Guidance 17
61. 6/5/84 Technical Review Team Guidance 18
62. 6/5/84 Technical Review Team Guidance 18
63. 6/5/84 Technical Review Team Guidance 18 6
64. 6/5/84 Technical Review Team Guidance 18
65. 6/5/84 Technical Review Team Guidance 18
66. 6/5/84 Technical Review Team Guidance 18
67. 6/5/84 Technical Review Team Guidance 18
68. 6/5/84 Technical Review Team Guidance 18
69. 6/5/84 Technical Review Team Guidance 18
70. 6/5/84 Technical Review Team Guidance 19
71. 7/1/84 Revision 1 Comanche Peak Plan 16 for the completion of Outstanding Regulatory Actions
72. 7/1/84 Revision 1 Comanche Peak Plan 16 for the completion of Outstanding Regulatory Actions 73.

7/1/84 Revision 1 Comanche Peak Plan 16 for the completion of Outstanding Regulatory Actions 74.

7/1/84 Revision 1 Comanche Peak Plan 32 for the completion of Outstanding Regulatory Actions

75. 7/1/84 Revision 1 Comanche Peak Plan 16 for the completion of Outstanding Regulatory Actions 7
76. 7/10/84 Employee Listing 1
77. 7/10/84 Employee listing 1
78. 7/10/84 Mechanical & Piping 3

Allegation Review Categories 79.

7/13/84 Mechanical & Piping 5

Allegation Review Categories

80. 7/17/84 Status Report - Mechanical 4

Piping 81.

7/17/84 No title - Handwritten notes 1

82. 7/18/84 Handwritten report No title #6 2
83. 7/18/84 Handwritten report No title #7 2

84.

7/18/84 Handwritten report No title #17 3

85. 7/18/84 Status Report - Mechanical /

4 Piping area

86. 7/18/84 Comanche Peak Open Issue Action 1

Plan 87.

7/18/84 Comanche Peak Open Issue Action 1

i Plan 88.

7/19/84 Mechanical Piping 1

89. 7/20/84 Mechanical & Piping Allegation 4

Review Categories 90.

7/30/84 SSER Writeup Format 1

l 4

8

91. 8/6/84 No title handwritten notes 1
92. 8/8/84 Comanche Peak Abbreviations 4
93. 8/9/84 Summary of Comanche Peak 96 Open Issues - Control #7
94. 8/10/84 CPSES Telephone Directory 54
95. 8/23/84 As-built Inspection Program 6

Audit

96. 8/30/84 TRT Employee Chart 1
97. 9/7/84 US NRC Note for H. Livermore 16

- L. Shao R. Bangart from Annette Vietti

98. 9/10/84 US NRC Memo for Technical 2

Review Team Leaders from Thomas A. Ippolito,

Subject:

References in SSER Writeups

99. 9/12/84 TUGC0 Memo to John Finnermar, from A. Vega,

Subject:

l

1. E. Bullilen 79-14 100. Oct 84 Comanche Peak Completion of 7

Outstanding Regulatory Actions Chronology - 5 complete copies

  • 101.No date US NRC - Confidentiality 32 Agreement 102. No date Task & Discipline Codes -

1 Appendix 6 9

4

.-..,-,y._--

_-,__.____._.___._-.n,,

_,w

.y__

2 103. No date Comanche Peak Open Issue Action Plan #7 2

104. No date Comanche Peak Open Issue Action Plan #6 2

105. No date Comanche Peak Open Issue Action Plan #17 1

106. No date Comanche Peak Open Issue Action Plan #18 1

107. No date Comanche Peak Open Issue Action Plan #19 1

108. No date Comanche Peak Open Issue Action Plan #20 1

109. No date Comanche Peak Open Issue Action Plan #P2 1

110. No date Comanche Peak Open Issue Action Plan #23 1

111. No date Comanche Peak Open Issue Action Plan #24 1

112. No date Comanche Peak Open Issue Action Plan #25 1

113. No date Comanche Peak Open Issue Action Plan #26 1

114. No date Comanche Peak Open Issue Action Plan #27 10

115. No date Comanche Peak Jpen Issue Action 1

Plan #28 116. No date Comanche Peak Open Issue Action 1

Plan #29 117. No date Comanche Peak Open Issue Action 1

Plan #30 118. Na date No title handwritten notes 1

119. No date No title handwritten notes 1

120. No date QA/QC Allegation Review 12 Categories 121. No date QA/QC Allegation Review 15 Categories 122. No date Allegation Group #9 7

123. No date Figure E-1-CPSES Work & Records 1

Flow Process 124. No date NRC Technical Review team 2

125. No date Mechanical & Piping Allegation 3

Review Categories 126. No date Engineering - Operations 7

Interface CPSES - Org. Charts 127. No date Employee Telephone Listing 3

11

I I

128. No date Notes - No title - Handwritten 1

129. No date No title page of report 77-13 1

130. No date Attachment to traveller 1

ME80-2008-4000 131. No date First Draft:

Severe Accident 54 Program Description 12

Document Name:

QA/QC COX-11 Requestor's 10:

JACKSON Author's Name:

Penny Fann Document Comments:

i Re: F01A-85-59 APPENDIX U Box 12 - 0A/QC Description Pane 1.

2/22/84 Memo with attachment to: John Larkins 46 and Bill Farmer (NRC) from: W. H. McCullock' (SNLA) Re: Transmittal of Ice Conden.ser

Equipment Survivability Report 2.

No Date Signout sheet for Depositions 1

3.

No Date Creating the Signon Document 41 4.

No Date Before the Atomic Safety and Licensing 33 Board " Case's Partial Statement of Material Facts as to which there is no Genuine Issue Regarding the Upper Lateral Restraint Beam" 5.

Nu Date Before the Atomic Safety and Licensing 12 Board, " Case's Answer to Applicants' Statement of Material Facts as to which there is no Genuine Issue Regarding Consideration of Local Displacements and Stresses" 6.

No Date Before the Atomic Safety and Licensing 41 Board " Case's Partial Answer to Applicants' Statement of Material facts as to which there is no Genuine Issue Regarding Allegations Concerning Consideration of Force Distribution in Axial Restraints"

, 7.

No Dste Before the Atomic Safety and Licensing 31 Board, " Case's Partial Answer to Applicants' Statement of Material Facts as to which there is no Genuine Issue Regarding Safety Factors" 8.

No Date Before the Atomic Safety and Licensing 40 Board, " Case's Partial Answer to Applicants' Statement of Material Facts as to which there is no Genuine Issue Regarding Applicants' use of Generic Stiffnesses Instead of Actual Stiffnesses in Piping Analysis" 9.

No Date Before the Atomic Safety and Licensing 11 Board, " Case's Partial Answer to Applicants' Statement of Material Facts as to which There is no Genuine Issue Regarding Differential Displacement of Large-Framed.

Wall-to-Wall and Floor-to-Ceiling Pipir.g Supports" 10, 8/29/84 Case 1tr to NRC,

Subject:

Case's Partial 5

Answer to Applicants' Motions for Sumary Disposition ll. 9/10/84 Case 1tr to NRC,

Subject:

Case's~

172 Answer to Applicants Motion for Sumary Disposition Regarding Richmond Inserts 3

O 6 12. July 82 General Electric Report BWR Fuel Assembly 75 Evaluation of Combined SSE and LOCA Loadings (Amendment ho. 3) 13.

10/25/82 ASME ltr to Zoltan Rosztoczy 1

Re: Form to be completed by prospective members.

14, 11/24/82 ASME ltr to the Subcommittee on 68 Qualification of Nuclear Plant Equipment

Subject:

Letter Ballot #6 N551-2 15, 12/16/82 Seismic Risk Sensitive Study 28 (Presented to: R. H. Vollmer, U.S.

Nuclear Regulatory Commission) 16.

1/20/83 NRC memorandum for: Division of Engineering 4

Thru: William V. Johr.ston From: Victor Benaroya

Subject:

Proposed Response for UCS Letter Dated January 5,1983 17.

1/26/83 Seismic and Dynamic Qualification 108 of Safety Related Electrical ar.d Mechanical Equipment in Operating Nuclear Power Plants by: John Curreri Structural Analysis Division Department of Nuclear Energy Brookhaven National Laboratory (Draf t Report) 18, 1/27/83 Brookhaven National Laboratory 9

Memorandum from A. Azam to J. Boccio

Subject:

BhL Coments to Peer Review of Seismic Report

  • 4

. 19. 3/16/84 NRC Memorandum for: Richard H.

3 Vollmer Thru: James P. Knight From: George Lear,

Subject:

Comments Concerning CRGR Package For the Proposed Resolution of USI A-46, " Seismic Qualification of Equipment in Operating Plants" 20, 3/19/84 Severe Accident Meeting Schedule 1

21, 3/20/04 Standard Order for DOE Work 3

22, 4/11/84 Telephone Directory Comanche Peak 65 Steam Electric Station 23.

7/20/84 Comanche Peak List of Allegations 28 24 7/24/84 NRC Memorandum for File From E. H. Johnson 1

Subject:

Alleged Poor Construction Practices - Comanche Peak 4-83-A

25. 8/10/84 Telephone Directory 54 Comanche Peak Steam Electric Station 26, 8/20/84 Technical Review Team 3

ThirdSession(orig. Chart)

27. 9/4/64 Bishop, Liberman, Cook, Purcell &

6 Reynolds Itr to William L. Clements Re: Texas Utilities Electric Co. et al.

(NRC) Comanche Peak Steam Electric Station (Units 1 and 2) Docket No.

50-445-2 and 50-446-2

, 28, 9/10/84 NRC Memorandum For: Technical 2

Review Team Leaders From: Thomas A.

Ippolito

Subject:

References in SSER Writeups

29. 9/10/84 Draft 4 Comanche Peak Abbreviations 5

30, 9/21/84 Technical Review Team fifth session 2

31. No Date Figure 5 Comanche Peak Allegations 1

Resolution Schedule

32. Nc Date General Employee Training 64 (Comanche Peak Steam Electric Station)
33. No Date Sumary of Coments on BNL Draft 2

Report Cost / Benefit Study

34. ho Date Peer Review: Major Topic Breakdown 1
35. No Date Status of NRC Safety Concerns 23 Regarding Possible Reactor Coolant Pump Seal LOCAs following Los of Seal Support Functions 36, 9/17/04 Texas Utilities Generating Co. ltr to NRC 3

Re: Comanche Peak Steam Electric Station Units 1 and 2 Welding Allegations Additional Response File No. 10066.5 37, 7/26/84 Inspection Report, Docket: 50 445/64-18 14 (InPDR)

, 38. 7/26/84 Inspection Report. Docket: 50-445/84-08 17 50-446/8404 (In PDR)

39. 7/26/84 Inspection Report, Docket 50-445/84-20 11 (In PDR) 40, 7/30/84 Inspection Report, Docket 50-445/84-15 15 (In PDR) 41, 9/IE/84 Inspection Report, Docket 50-445/84-30 4

Hilti Bolt (In PDR)

42. 6/28/84 SSER Civil / Structural Revision 2 8

l l

43, 2/15/83 Inspection Report Dockets 50-445/82-26 55 50-446/82-14

44. 4/20/83 Review Package CC-X-116-709-A75C 18 45.

S/5/83 As-built drawing Pkg.

18 l

Brown and Root j

46, 5/18/84 Before the Atomic Safety and Licensing 122 Board. " Applicants' Motion for Suninary Disposition Regarding the Effects of GAP on Structural Behavior Under Seismic Loading Conditions" l

47. 6/5/84 Technical Review Team Guidance June 1984 18 46.

7/10/64 TRT Reviewer Comments 1

l l

i l

l I

l :

49. 8/13/84 Before the Atomic Safety and Licensing 127 Board, " CASE's Answer to Applicants' Motion for Summary Disposition Regarding the Effects of GAPS on Structural Behavior Under Seismic Loading Conditions" 50, 8/28/84 Request for copies with Dwgs 5
51. No Date Index of Comanche Peak Operating 57 Licensing Proceeding
52. Nc Date Comanche Peak Nuclear Power Plant 1

Allegations and/or Investigations Summary

53. No Date Figure E-1. CPSES Work and Records 1

Flow Process

54. No Date Figure 5. Comanche Peak Allegations 1

Resolution Schedule f

55. No Date Technical Review Team Org. Chart 1

i

56. No Date Mechanical and Pipirg Allegation Review 5

Categories (List of Allegations)

57. No Date NRC Technical Review Team Org. Chart 2

i 58.

No Date General Information Comanche Peak 1

Technical Review Team (TRT)

59. No Date Writing Standards for Comanche Peak SER 5

Supplement (SSER) l

---,-m

-&-%---w--.e+---

w

-,-o-


- - - - - - -w.--we--

--w v=

F y

f l

60. No Date Before the Atomic Safety and Licensing 43 i

Board " Affidavit of Robert C. Iotti and John C. Finnerman, Jr. Regarding the Effects of Gaps on Structural Behavior Under l

Seismic Loading Conditions i

61. No Date AB-13 TRT Review Notes 1
62. No Date CPSES Org. Charts 7

l i

63. 8/20/82 Texas Utilities Office Memorandum to:

7 J. T. Merritt From M. R. McBay

Subject:

Comanche Peak Stean Electric Station Electrical Conduit Support l

l Reinspection Ref: Dwg. 2323-S-0910 CPPA-10032 l

l

64. 8/23/82 Texas Utilities Generating Company Office 3

Memorandum to: J. T. Merritt From: R. G.

Tolson

Subject:

Comanche Peak Steam Electric Station CP-82-10 l

65. 9/14/82 Texas Utilities Services, Inc.

1 To: R. G. Tolson From: Mr. R. McBay

Subject:

Comanche Peak Steam Electric Station SDAR CP-82-10 Re-Inspection of Conduit Supports Ref: TU0-1374

66. 9/20/82 Texas Utilities Generating Company 1

ltr to: G. L. Madsen From: R. J. Gray Re: Re-Inspection of Ccnduit Supports File No. 10110 67.

10/10/82 Texas Utilities Generating Company 8

ltr to: Madsen From: Gray l

, Re: Re-inspection of Conduit Supports 1

File No. 10110

68. 7/11/84 Comanche Peak Open Issue 1

Inspection Data Sheet NRC Tracking No. DE-002

69. No Date TRT Reviewer Notes 1

(Summary of DE-002) i 70.

11/15/79 Daily Report - Region IV 79-09 1

71.

11/16/79 TUGC0 Office Memo To: J. T. Merritt 2

From: R. G. Tolson

Subject:

CPSES e

1981-83 2300 MW i

Installation Ref: CP-79-09 72.

1/2/80 TUGC0 Office Memorandum to: Ron Tolson 3

From J. T. Merritt

Subject:

CPSES 1981-83 2300 MW Installation SDAR 79-09 Ref: CPP-2199 TUQ-659

73. 3/20/80 Brown and Root Message to RGT From JRA 2

RE: SDAR-79-09

74. 4/21/80 TUGC0 Itr to Seidle From: R. J. Gravy 3

Re: Comanche Peak Steam Electric Station 1981-83 2300 MW Installation Welded Conduit Supports File No. 10110

75. 4/22/80 Brown & Root Message To: R. G. Tolson 6

From: JRT RE: SDAR CP 79-09 I

r k

, 76. 5/28/80 Speed ltr to: R. G. Tolson 2

From: J. R. Ainsworth

Subject:

SDAR 79-09/ Conduit Support Inspection

77. 6/5/80 CPSES Speed ltr To: R. G. Tolson From:

2 J. P. Ainsworth

Subject:

Welded Conduit Supports - SDAR CP-79-09 78.

7/24/80 TUGC0 Office Memorandum to M. Laue 3

From; J. R. Ainsworth

Subject:

CPSES SDAR 79-09 Site Welded Conduit Supports I

79.

7/25/80 TUGC0 ltr to Siedle (NRC) 4 From R. J. Gray. RE:

1981-83 2300 MW Installation Welded Conduit Supports File No. 10110

80. 7/28/80 TUGC0 Memo To: M. Laue 3

From: J. R. Ainsworth

Subject:

Revision of Response to SDAR 79-09 Welded Conduit Supports 81.

7/30/80 Speed ltr to: R. G. Tolson From: J. R.

1 Ainsworth

Subject:

SDAR 79 Welded Conduit Supports

82. 8/6/80 TUGC0 ltr to: Seidle (NRC) 2 From: Perry G. Brittain,

Subject:

1981-83 2300 MW Installation Welded Conduit Supports File No. 10110 83.

10/10/80 Speed letter to: S. Ali 1

From JRA

Subject:

SDAR 79-09

i

, 1 84.

11/24/80 Speed ltr to: J. R. Ainsworth

Subject:

1 SDAR 79-09 " Welded Conduit Supports"

85. No Date Summary of DE-001 (Handwritten) 1 86.

12/12/78 Handwritten Note Weld Material 1

Requisitions 87.

11/2/80 Review of WFML's for Welded Conduit 62 Supports 88, 11/4/80 Brown and Root Message From: J. Burke 1

to: S. Ali Re: Weld Filler Material Issued 89.

10/24/80 List of Welders Taken from Weld Filler 17 Material Logs in Welding Engineering Files.

90.

11/8/79 TUGC0 Office Memorandum To: J. T. Merritt 2

From: R. G. Tolson

Subject:

Comanche Peak Steam Electric Station 1981-63 2300 MW Installation CP-79-08 91.

11/12/79 TUSI Office Memorandum To: R. G. Tolson 1

From: J. T. Merritt

Subject:

Comanche Peak Steam Electric Station 1981-83 2300 MW Installation SDAR No. CP-79-08 Ref: TU0-658 92.

12/4/79 Brown and Root Message To: R. G. Tolson 1

Frcm: J. R. Ainsworth Re: SDAR 79-08

, 93.

1/8/80 TUSI Office Memorandum To: R. G. Tolson 1

From: J. T. Merritt,

Subject:

1981-83 2300 MW Installation SDAR No, CP-79-08 kef: 1) TUQ-658

2) GTN-42796 3)CPP-2182 94 1/29/E0 Speed ltr From: J. R Ainsworth 1

Subject:

Reportable Deficiencies -

Status

95. 2/13/80 Browr: & Poot, Inc. To: R. G. Tolson 1

From: JRA Re: SDAR 79-08 No Change In Response Date

96. 4/2/80 Texas Utilities Services, Inc.

1 Office Memorandum To: R. G. Tolson From: John T. Merritt,

Subject:

Comanche Peak Steam Electric Station 1981-83 2300 MW Installation SDAR-CP-79-08

97. 4/6/80 Speed Letter To: J. T. Merritt From 1

R. G. Tolson

Subject:

SDAR-CP-79-08 CPP-00248

98. 4/16/80 Speed Letter To: Jerry Allen 1

From: J. R. Ainsworth

Subject:

Hilti Bolt Installation Engineering Survey SDAR 79-08

, 99. 4/21/80 TUGC0 ltr to NRC Re: Installation 1

of Drilled-In Expansion Anchors File No. 10110 100. 4/28/80 TUSI Office Memorandum To: Ron Tolson 1

From: J. T. Merritt,

Subject:

CPSES 1981-83 2300 MW Installation SDAR-CP-79-08 Ref: CPP-00248 101, 8/20/80 Texas Utilities Services, Inc.

35 Office Memorandum To:

Dick Kissinger/ David Wade From: Jerry A. Allen

Subject:

CPSES Hilti Bolt Discrepancies 102. 12/5/80 TUSI Office Memorandum 3

To: R. G. Tolson From: J. T. Merritt

Subject:

CPSES SDAR-79-08 Ref: CPPA-7666 103, 12/9/80 Description of Deficiency 3

104. 12/10/80 TUGC0 ltr to NRC 2

Re: CPSES Installation of Drilled-In Expansion Anchors File No. 10110 105. 2/10/81 Speed Letter To: J. T. Merrill 2

From: Tolson

Subject:

Hilti Bolt Spacing Violations

, 106. 2/23/81 TUSI Office Memorandum 126 To: R. G. Tolson From: M. R. McBay

Subject:

CPSES SDAR 79-08 Failure to Maintain Minimum Spacing for Hilti's Ref: CPP-4522 Dated 2-11-81 107, 5/24/81 Speed Letter From: J.R.A.

1 To: R. G. Tolson

Subject:

Min Spac. Violations 108. 12/16/83 Brown & Root Procedure Number CEI-20 18 Rev. 9 (Installation of "Hilti" Drilled-InBolts) 109. No Date Comanche Peak Open Issue Inspection 3

Data Sheet NRC Tracking No. CB-005 110. No Date Summary of DB-005 (Handwritten) 1 111. 3/16/84 Application for Operating License 21 Dockets 50-445/50-446 112. 7/17/84 Comanche Peak Special Review Team 79 Report 113, 4/7/83 Dwg. 2323-Al-0511 1

Rev. 8 114, 4/7/83 Dwg. 2323-Al--0505 1

Rev. 11 115. 4/7/83 Dwg. 2323-Al-0504 1

Rev. 10 i

a N

r

i 116. 4/7/83 Dwg. 2323-Al-0503 1

Rev. 9 117. 4/7/83 Dwg. 2323-Al-0500 1

Rev. 10 118. 4/7/83 Dwg. 2323-Al-0501 1

Rev. 10 119, 4/7/83 Dwg. 2323-Al-0502 1

Rev. 11 120. 4/7/83 Dwg. 2323-Al-0507 1

Rev. 9 121. 4/7/83 Dwg. 2323-Al-0509 1

Rev. 12 122, 4/7/63 Dwg. 2323-Al-0508 1

Rev. 9 123. 4/7/83 Dwg. 2323-Al-0510 1

Rev. 8 124. No Date Dwg. (Primary Plant Electrical &

l Control Building Observation Floor Plan EL-Sections and Details 340'-6")

125. No Date Dwg. 2323-Al-0506 (Primary Plant Unit 1

1 & 2 Roof Plan & Details)

}

t

16 -

126. No Date CPSES Org. Charts 7

~127. 3/21/83 Memo C. Berlinger to V. Noonan 8

regarding the Adequacy of GE Material Strength Limits 128. No Date ASME Article 111-3000: Basis 7

For Establishing Allowable Stress Values 129. July 1981 U.S. N.R.C. Standard Review Plan 21 NUREG-0800; Section 4.2 Fucl System Design 130, 8/51/81 ANSI /ANS-57.5 - 1981 Standard:

21 Light Water Reactors Fuel Assembly Mechanical Ge11gn and Evaluation

,-m---

w-w w

{..

~

- GOVERNMENT ACCOUNTADlLITY PROJECT 1555 Conne'cricut Avenue. N.W Suite 202 Washington. D.C. 20036 (202)232-8550 G:85:104 Jancary 21, 1985 FREEDOM 0F INFORMATION ACT REQUEST FREEDOM OF INF0fiMATION ACI REQUESI Fora-/5-sy Director kM h/-g-g Office of Administration Nuclear Regulatory Commission Washington, D.C.

20555 To Whom It May Concern:

Pursuant to the Freedom of Information Act ("F0IA"), 5 U.S.C. 5 552, the Government Accountability Project (" GAP") requests copies of any and all agency records and information, incit. ding but not limited to notes, letters, memoranda, drafts, mimites, diaries, logs, calendars, tapes, transcripts, summaries, interview re-6 parts, procedures, ir.structions, engineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone messages, computations, voice recordings, computer runoffs, any other data compilations, interim and/or final reports, status re-ports, and any and all other records' relevant to and/or generated in connection with the overview, ragulation and investigation of the Comanche Peak Nuclear Plant by any person, branch, or department of the NRC since January 18, 1985.

~ This request includes all agency records as defined in 10 C.F.R. 5 9.3a(b) arid the NRC Manual, Appendix 0211, Parts 1.A.2 and A.3 (approved October 8,1980) whether they currently exist in the NRC official, " working," investigative or other files, or at any other location, including private residences.

If any records as defined in 10 C.F.R. 5 9.3a(b) and the NRC Manual, supra, and covered by this request have been destroyed and/or removed after this request, please provide all surrounding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the action (s) taken relevant to, generated in connection with, and/or issued in order to implement the action (s).

GAP requests that fees be waived, because " finding the information can be con-sidered as primarily benefitting the general public," 5 U.S.C. S 552(a)(4)(a).

GAL is a non-profit, non-partisan public interest organization concerned with honest and open government. Through public outreach, the Project promotes whistleblowers as agents of government accountability. Through its Citizens Clinic, GAP offers assistance to local public interest and citizens groups seeking to ensure the health and safety of their communities. The Citizens Clinic is currently assisting several citizens groups, local governments and intervenors in the central Texas area concerning the construction of the Comanche Peak nuclear power plant.

[

g5lol5 t

/'..-

l

~

6frector-Office of Administration' Page Two W2 are requesting the above information as part of an ongoing monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.

For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed jusitfication of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document. withheld. This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C. Cir.1973), cert. denied, 415 U.S.

977 (1974).

We look forward to your response to this request within ten days.

Sincerely, Ib Billie Pirner Garde Citizens Clinic Director l

6 9

1

.