OPERATING DATA REPORT

^

V DOCKET NO.

50-302 DATE 2/2/87 ]

COMPLETED BY D. Graham TELEPHONE (904 ) 795-3802 OPERATING STATUS

1. Unit Name:

Crystal River Unit 3 Notes

2. Reporting Period:

1/1/87 - 1/31/87

3. Licensed Thermal Power (MWt):

2544

4. Nameplate Rating (Gross MWe):

890

5. Design Electrical Rating (Net MWe):

825

6. Maximum Dependable Capacity (Gross MWe):

860

7. Maximum Dependable Capacity (Net MWe):

821

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A (Net MWe):

N/A

9. Power Level To Which Restricted,If AnfA N
10. Reasons For Restrictions,If Any:

This Month Yr to.Date Cumulative

11. Hours In Reporting Period 744 744 86688
12. Number Of Hours Reactor Was Critical 241 241 54233.4
13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On.Line 916 236 529.88.I
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH)

Aca177 494377 119098314

17. Gross Electrical Energy Generated (MWH) 174278...

174278 40729489

18. Net Electrical Erergy Genersted (MWH) 164304 164304 38677102
19. Unit Service Faetor
31. 7*.

31,7%

61.17.

20. Unit Availtbiliy Factor 31.7%

31.77.

61.1%

21. Umt Capa:ItyFactor3UsL,g MOC Net) 25.97, 26.47.

55.87.

22. Uni: Capicity Factor (Using DER Net) 26.87, 26 87.

54,17.

23. Unit Forced Outage Rate f 6. 37.

68.3%

24.57.

24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eachl:

- 'hv

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior io Commercial Operation):

Forecast Achieved INITIA L CRITICALITY 1/14/77.

INITIAL ELECTRICITY 1/30/77 V

COMMERCIAL OPER ATION 3/13/77 ff2 N 8702180285 870131 PDR ADOCK 05000302 g9777) //,

R PDR

e AVERAGE DAILY UNIT POWER LEVEL O

DOCKET NO.

50-302 FLCRP-3 UNIT DATE 2/2/87 COMPLETED BY D. Graham (904) 795-3802 TELEPHONE MONTH 1/87 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) g gwe. Net)

I 285 g7 o-131 2

g3 3

0 g9 4

20 5

yg 6

22

\\/

7 23 43 8

24 667 831 9

25 10-26 832 806 11 27 813 12 28 813 13 29 i

I4 30 814 15 31 806 16 s/

I INSTRUCTIONS On this format. list the average daily unit power leselin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

J I

~

t O

O 9

50-302 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 2/4/87 COMPLETED BY S A-Steunre REPORT MONTH Jan 87 TELEPHONE (onn 70s-ann?

"t Licensee

,E g h%

,[g 3

)Y Cause & Corrective No.

D.ite g

3g

_s s 5 Event g

g3 Action to F

yE E

j 53 g Report #

rn U U

Prevent Recurrence g

c5 87-01 870101 F

0.0 6

5 NA HH MECFUN Operated at 387. tull power to troubleshoot main feedwater pumps.

87-02 870102 F

508.0 A

1 NA CI PUMPXX Removed plant from service to repair the 1A Reactor Coolant Pump (RCP) shaft seal. Performed maintenance on the remaining three RCP eeals whil e the plant was off-line, i

l i

1 2

3 4

F: Forced Reason:

Method Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) for Preparation of Data B-Mainter_ince of Test N*[*,!Scr.,

Entry Sheets for Licensee

)

C-Refueling 3-Auto Scram Event Report (LER) File (NUREG.

D-RegiJatory Restrictiori 4-continued 0161) i E-Operator Training & Ucense Examination 5-Reduced Load F Administrat'ive 9-Other 5

G-Operationa! En ror (Explain)

Exhibit I - Same Source (9/77)

Il-Other ( E xplain) e

2 MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP DATE ~ 2/4/87

~;

COMPLETED BY S. Stewart TELEPHONE (904) 795-3802 i.

MONTH Jan R7 i

SUMMARY

STATEMENT:

Crystal River 3 operated during the month with one outage to perform maintenance on the Reactor Coolant Pump shaft seals, t

f e

e 4

f t

i 1

4 7

l i

I

.m.

5

- ? *.

t-o..

Florida Power C O R POR ATION February 10, 1987 3F0287-05 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit 3 January 1987 Monthly Operating Report.

This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, E. C. Simpson Director, Nuclear Operations Engineering and Licens.r.g AEF/feb Attachments xc:

Dr. J. Nelson Grace Regional Administrator, Region II Mr. T. F. Stetka Resident Inspector GENERAL OFFICE: 3201 Thirty-fourth Street South

  • P.O. Box 14042
  • St. Petersburg, Florida 33733 * (813) 866-5151 A Florida Progress Company