3F0287-05, Monthly Operating Rept for Jan 1987

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1987
ML20210T710
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/31/1987
From: Graham D, Eric Simpson
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0287-05, 3F287-5, NUDOCS 8702180285
Download: ML20210T710 (5)


Text

. ,

[]

V OPERATING DATA REPORT

^

DOCKET NO. 50-302 DATE 2/2/87 ]

COMPLETED BY D. Graham TELEPHONE (904 ) 795-3802 OPERATING STATUS

1. Unit Name: Crystal River Unit 3 Notes
2. Reporting Period: 1/1/87 - 1/31/87
3. Licensed Thermal Power (MWt): 2544
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A (Net MWe):

N/A

9. Power Level To Which Restricted,If N AnfA
10. Reasons For Restrictions,If Any:

This Month Yr to.Date Cumulative

11. Hours In Reporting Period 744 744 86688
12. Number Of Hours Reactor Was Critical 241 241 54233.4
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On.Line 916 236 529.88.I
15. Unit Reserve Shutdown Hours 0 -

0 0

16. Gross Thermal Energy Generated (MWH) Aca177 494377 119098314 .
17. Gross Electrical Energy Generated (MWH) 174278 ... 174278 40729489
18. Net Electrical Erergy Genersted (MWH) 164304 164304 38677102 _
19. Unit Service Faetor 31. 7*. _ _ _ _ ,

31,7% 61.17.

20. Unit Availtbiliy Factor 31.7% 31.77. 61.1%
21. Umt Capa:ItyFactor3UsL,g MOC Net) 25.97, 26.47. 55.87.
22. Uni: Capicity Factor (Using DER Net) 26.87, 26 87. 54,17.
23. Unit Forced Outage Rate __ f 6. 37. 68.3% 24.57.
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eachl:

- 'hv

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units In Test Status (Prior io Commercial Operation): Forecast Achieved INITIA L CRITICALITY 1/14/77.

INITIAL ELECTRICITY 1/30/77 V COMMERCIAL OPER ATION -

3/13/77 8702180285 870131 ff2 N g9777) //,

PDR ADOCK 05000302 R PDR

e AVERAGE DAILY UNIT POWER LEVEL O 50-302 DOCKET NO.

UNIT FLCRP-3 DATE 2/2/87 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH 1/87 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) g gwe. Net)

I 285 g7 o-2 131 g3 3 0 g9 4 20 5 yg 6 22 \/

7 23 43 8 24 667 9 25 831 10- 26 832 11 27 . 806 12 28 813 13 --

29 813 i I4 30 814 15 -_ 31 806 16 s/

I INSTRUCTIONS On this format. list the average daily unit power leselin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

J I

~

t O O - -

9 DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 2/4/87 COMPLETED BY S A- Steunre REPORT MONTH Jan 87 (onn 70s-ann?

TELEPHONE "t -

g

,[g 3 )Y Licensee g

,E g h% Cause & Corrective Action to No. D.ite F

3g @ _s s 5 Event g3 U

yE E j 53 g Report # rn U g Prevent Recurrence c5 87-01 870101 F 0.0 6 5 NA HH MECFUN Operated at 387. tull power to troubleshoot main feedwater pumps.

87-02 870102 F 508.0 A 1 NA CI PUMPXX Removed plant from service to repair the 1A Reactor Coolant Pump (RCP) shaft seal. Performed maintenance on the remaining three RCP eeals whil e the plant was off-line, 1 2 3 4 F: Forced Reason: Method Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) for Preparation of Data B-Mainter_ince of Test N*[*,!Scr., Entry Sheets for Licensee C-Refueling 3-Auto Scram Event Report (LER) File (NUREG.

i D-RegiJatory Restrictiori 4-continued 0161)

E-Operator Training & Ucense Examination 5-Reduced Load F Administrat'ive 9-Other 5 G-Operationa! En ror (Explain) Exhibit I - Same Source (9/77) Il-Other ( E xplain) e

2 .

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP DATE ~ 2/4/87

~;

COMPLETED BY S. Stewart

, TELEPHONE (904) 795-3802

i. MONTH Jan R7 i

SUMMARY

STATEMENT:

Crystal River 3 operated during the month with one outage to perform maintenance on the Reactor Coolant Pump shaft seals, t

f e

e 4

f

! t i

1 4

7 l

i I

_ _ _ , . _ , . . . . . . - , . . - . . . _ - - , - .. .m._ . _ . _ . . - . . - . _ - _ . . _ . . _ . . , . , , - . . . . . , _ . _ . . . . . . . _ , _ , _ . , , ,

< 5

<, - ? *..

t-o .!

Florida Power C O R POR ATION February 10, 1987 3F0287-05 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit 3 January 1987 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, E. C. Simpson Director, Nuclear Operations Engineering and Licens.r.g AEF/feb Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Mr. T. F. Stetka Resident Inspector GENERAL OFFICE: 3201 Thirty-fourth Street South

  • P.O. Box 14042
  • St. Petersburg, Florida 33733 * (813) 866-5151 A Florida Progress Company