Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211C980 + (05:07:48, 6 December 2024)
- IR 05000327/1986052 + (05:07:50, 6 December 2024)
- ML20211C977 + (05:07:51, 6 December 2024)
- 05000364/LER-1986-008-01, :on 860915,failure to Post Fire Watch Per Tech Spec 3.7.11.2 Discovered.Caused by Personnel Propping Open Fire Door W/O Control Room Approval.Personnel Counseled Re Fire Door Opening Procedures + (05:07:53, 6 December 2024)
- ML20211C972 + (05:07:54, 6 December 2024)
- ML20211C966 + (05:07:55, 6 December 2024)
- ML20211C969 + (05:07:55, 6 December 2024)
- ML20211C965 + (05:07:56, 6 December 2024)
- ML20211C964 + (05:07:56, 6 December 2024)
- ML20211C962 + (05:07:57, 6 December 2024)
- ML20211C960 + (05:07:58, 6 December 2024)
- ML20211C961 + (05:07:58, 6 December 2024)
- ML20211C959 + (05:07:59, 6 December 2024)
- ML20211C958 + (05:08:00, 6 December 2024)
- ML20211C950 + (05:08:01, 6 December 2024)
- ML20211C952 + (05:08:01, 6 December 2024)
- U-603258, Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage + (05:08:02, 6 December 2024)
- ML20211C947 + (05:08:02, 6 December 2024)
- ML20211C943 + (05:08:03, 6 December 2024)
- ML20211C939 + (05:08:04, 6 December 2024)
- ML20211C942 + (05:08:04, 6 December 2024)
- ML20211C935 + (05:08:05, 6 December 2024)
- DCL-87-002, Forwards Response to 861104 Insp Rept 50-275/86-29 & Notice of Violation .In-depth Investigation of Airlock Door Conducted & Listed Weakness Identified.Corrective Actions:Pin in Interlock Box Replaced + (05:08:06, 6 December 2024)
- TXX-6261, Final Deficiency Rept CP-86-44 Re Design/Const Requirements for Min Separation of Welded Attachments to Embedded Strip Plates.Initially Reported on 860605.Scope of Sdar CP-86-04 Expanded to Include Deficiency Identified in Sdar CP-86-44 + (05:08:07, 6 December 2024)
- ML20211C931 + (05:08:07, 6 December 2024)
- ML20211C928 + (05:09:07, 6 December 2024)
- ML20211C926 + (05:09:08, 6 December 2024)
- ML20211C925 + (05:09:08, 6 December 2024)
- TXX-6042, Interim Deficiency Rept CP-86-72 Re Plant Mods Resulting from Pipe Support Reverification Program.Initially Reported on 860606.Issue Divided to Segregate Small Bore Piping & Supports from Large Bore.Next Rept Expected by 861201 + (05:09:09, 6 December 2024)
- ML20211C924 + (05:09:09, 6 December 2024)
- ML20211C920 + (05:09:10, 6 December 2024)
- ML20211C921 + (05:09:10, 6 December 2024)
- 05000483/LER-1986-033, :on 860920,control Room Ventilation Isolation Occurred.Caused by Blown Fuse on Control Room Radiation Monitor.Fuse Replaced.Monitor Restored.Downscale ESF Actuation Feature to Be Removed from Monitors + (05:09:12, 6 December 2024)
- ML20211C917 + (05:09:14, 6 December 2024)
- ML20211C916 + (05:09:15, 6 December 2024)
- ML20211C914 + (05:09:15, 6 December 2024)
- ML20211C912 + (05:09:16, 6 December 2024)
- ML20211C913 + (05:09:16, 6 December 2024)
- ML20211C911 + (05:09:19, 6 December 2024)
- ML20211C910 + (05:09:20, 6 December 2024)
- ML20211C909 + (05:09:20, 6 December 2024)
- ML20211C907 + (05:09:21, 6 December 2024)
- ML20211C906 + (05:09:22, 6 December 2024)
- ML20211C904 + (05:09:23, 6 December 2024)
- ML20211C905 + (05:09:23, 6 December 2024)
- ML20211C903 + (05:09:24, 6 December 2024)
- ML20211C902 + (05:09:25, 6 December 2024)
- ML20211C900 + (05:09:25, 6 December 2024)
- ML20211C899 + (05:09:26, 6 December 2024)
- ML20211C897 + (05:09:26, 6 December 2024)
- ML20211C895 + (05:09:27, 6 December 2024)
- ML20211C896 + (05:09:27, 6 December 2024)